ML20210V210
| ML20210V210 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/31/1997 |
| From: | Reible B, Terry C, Walker R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| TXX-97191, NUDOCS 9709230176 | |
| Download: ML20210V210 (9) | |
Text
.
E$'
Log # TXX 97191 1"""
==,,
File # 10010.2
[
g Ref. # 10CFR50.36 1UELECTRIC" cj-j,"Tj, September 17, 1997 C
U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTR:C STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446 HONTHLY OPERATING REPORT FOR AUGUST 1997 Gentlemen:
Attached is the Monthly Operating Report for August 1997, prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the CPSF.S Units 1 and 2. Operating License Nos. NPF 87 and NPF 89, respectively. During this reporting period, there have been no failures or challenges to the Power Operated Relief Val W s or Safety Valves for CPSES Units 1 and 2.
This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2.
Should you have any questions, please contact Douglas W. Snow at (254) 897 8448.
Sincerely, 6 N.
C. L. Terry By: @b Roger D. Walker Regulatory Affairs Manager DWS/grp Attachment c.
Mr. E. W. Herschoff Region IV hN Mr. J. I. Tapia, Region IV Resident Inspectors Mr. T. J. Polich, NRR 9709230176 970031 115550g DR ADOCK 0500 5
P. O. Don 1(Et2 Glen Rose Texas 76(M3
Attachment.to TXX.97191 Pa9e 1 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC HONTHLY OPERATING REPORT DOCKET NO 50 445 i
UNIT CPSES 1 DATE:
9/ 8/97 COMPLETED bY:
Bob Reible TELEPHONE:
254 897 0449 j
OPERATING STATUS 1.
REPORTING PERIOD:
AUGUST 1997 GROSS HOURS IN REPORTING PER00:
744 2.
CURRENfLf AUTHORIZED POWER LEVEL (HWt):
3400 HAX DEPEND. CAPACITY (MWe. Net):
1150 DESIGN ELECTRICAL RATING (HWe. Net):
1150 3.
POWER LEVEL TO WHICH RESTRICND (IF ANY) (We Net):
NONE 4.
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 744 5,831 51,925 3
6.
REACTOR RESERVE SHlfiDOWN HOURS 0
0 2.604 7.
HOURS GENERATOR ON LINE 744 5.831 51.285 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERGY GENERATED (HWH) 2,531,964 19,843,104 167,292.555
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 841.527 6.691,511 55,880.041
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 806,219 6,422,001 53,345.430
- 12. REACTOR SERVICE FACTOR 100.0 100.0 84.0 1
- 13. REACTOR AVAILA8ILITY FACTOR 100.0 100.0 88.2
- 14. UNIT SERVICE FACTOR 100.0 100.0 83.0
- 15. UNIT AVAllABILITY FACTOR 100.0 100.0 83.0 i-
- 16. UNIT CAPACITY FACTOR (!! SING MDC) 94.2 95.8 75.0
- 17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 94.2 95.8 75.0
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 4.2
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
20.
IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 900813 1
ESTIMATED
Attachment to TXX.97191 Page 2 of,8 i
1 AVERAGE DAILY (*!T POWER LEVEL i-DOCKET NO.:
50 445 I-UNIT:
CPSES 1
j DATE:
9/ 8/97 COMPLETED 8Y:
Bob Reible TELEPHONE:
254 897 0449 MON 1H:
AUGUST 1997 4
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (We Net)
DAY (MWe Net) 1 1076 17 1089 2
1025 18 1089 3
1082 19 1089 4
1080 20 1089 5
1080 21 1087 6-1079 22 1086 7
1081 T3 1086 8
1086 24 1087 9
1086 25 1087 10 1088 26 1087 11 1088 27 1087 12 1087 28 1087 13 1086 29 1088 14 1086 30 1086 15 1086 31 1088
-16 1087
Attachnent to TXX 97191 Page 3,of,8
SUMMARY
OF OPERATING EXPERIENCE FOR TriE HONTH DOCKET No.:
50 445 UNIT:
CPSES 1
DATE:
9/ 8/97 COMPLETED BY:
Bob Reible TELEPHONE:
254 897 0449 HONTH:
AUGUST 1997 DAY TlHE REMARK / MODE 08/01 0000 Unit began the month at 100% power.
08/31 2400 Unit ended the month at 100% power.
Attachment to TXX-97191
~
Page 4 ef 8 UNIT SIUTD06MS APO PCER REDUCTIONS DOCKET NO.:
50-445 UNIT:
CPSES 1
DATE:
9/ 8/97 COPFLETED BY:
Bob Reible TELEPHONE:
254-897-6u9 REPCRT MONTH:
AUGUST 1997 METHOD OF TYPE SHUTTI C DOWN F: FORCED DURATION THE REACTOR OR NO DATE 5: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS /CDPetENTS None None 1)
REASON 2)
METHOD A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAININ AND LICENSE EXMINATION 1: MANUAL B:
NAIKT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRM C:
REFUELING G:
OPEPATIONAL ERROR (EXPLAIN) 3: AUTUMATIC SCRAM D:
REGULATORY RESTRICTION H:
01HER (EXPLAIN) 4: OThER (EXPIAIN)
Attachment to TXX.97191 Pa9e 5 of 8 COMANCHE PEAK STEAN ELECTRIC STATION, UNIT 2 NRC HONTHLY OPERATING REPORT DOCKET NO :
50 446 UNIT:
CPSES 2 DATE:
9/ 8/97 COMPLETED BY:
Bob Reible l
TELEPHONE:
254 897 0449 OPERATING STATUS 1.
REPORTING PERIOD:
AUGUST 1997 GROSS HOURS IN REPORTING PEROD:
744 2.
CURRENTLY AUTHORIZED POWER LEVEL (HWt):
3411 MAX, DEPEND. CAPACITY (HWe Net):
1150 j
DESIGN ELECTRICAL RATING (HWe Net):
1150 3.
POWER LEVEL TO Wi!CH RESTRICTED (IF ANY) (HWe. Net):
NONE 4.
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 6.
NUSER OF HOURS REACTOR WAS CRITICAL 744 5,005 29.486 6.
REACTOR RESERVE SHUTDOWN HOURS 0
82 2,311 7.
HOURS GENERATOR ON LINE 744 4,984 29.218 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERNAL ENERGY GENERATED (MWH) 256,238 14,542.010 92,825.637
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 850,680 5,706.250 32,098.350
- 11. NET ELECTRICAL ENERGY GENERATED (HWH) 817,440 5,483.134 30.711.865
- 12. REACTOR SERVICE FACTOR 100.0 98.4 84.2
- 13. REACTOR AVAILA8ILITY FACTOR 100.0 100.0 90.8
- 14. UNIT SERVICE FACTOR 100.0 98.0 83.5
- 15. - UNIT AVAllA81LITY FACTOR 100.0 98.0 83.5 16,.' UNIT CAPACITY FACTOR (USING HDC) 95.5 93.7 76.3
- 17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 95.5 93.7 76.3
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 6.3
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTNS (TYPE, DATE, AND DURATION OF EACH):
20.
IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATED-
i Attachment to TXX 97191 Page 6 of,4; AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
50 446 UNIT:
CPSES 2
DATE:
9/ 8/97 COMPLETED BY:
Bob Reible TELEPHONE:
254 897 0449
[
MONTH:
AUGUST 1W7 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY
( % Net)
DAY (MWe Net) 1 1094 17 1102 2
1094 18 1101 3
1094 19 1101 4
1093 20 1101 5
1092 21 1101 6
1093
.22 1100 7
1095 23 1101 8
1099 24 1101 9
1099 25 1101 10 1099 26 1101 11 1099 27 1101-12
'1099 28 1101 13 1099 29 1101 14 1098 30 1101 15 1098 31 1101 16 1100
Attachment}oTXX97191 Pa9e 7 of,8,,
StM1ARY OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.:
50 446 UNIT:
CPSES 2
DATE:
9/ 8/97 COMPLETED BY:
Bob Reible TELEPHONE:
254 897 0449 MONTH:
AUGUST 1997 DAY TIME REMARK / MODE i
1 08/01 0000 Unit be9an the month at 100% power.
08/31 2400 Unit ended the month at 100* power.
Attactment to TXX-97191 Page 8 of 8 UNIT SHUTDOWIS AM) POER REDUCTIONS DOCKET NO.:
50-446 UNIT:
CPSES 2
DATE:
9/ 8/97 C0frLETED BY:
Bob Reible TELEPHOE:
254-897-0449 REPORT MONTH:
AUGUST 1997 ETH00 0F TYPE SHUTTING DOWI F: FORCED DURATION TE REACTOR OR NO DATE 5:SCEDULED (HOURS)
REASON REDUCING POER CORRECTIVE ACTIONS /ColeefTS None None
- 1) ' REASON 2)
METHOD A:
EQUIPENT FfILURE (EXPLAIN)
E:
OPERADR TRAINING AND LICENSE EXMIMTION 1: MANUAL B:
MAINT OR TEST-F:
ADMINISTRATIVE' 2: MANUAL SCRM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRM D:
REGbtATORY RESTRICTI0ff H: