__
4.
M' Log # TXX-97160 lllllllll" "llllllll File # 10010.2 i
4 Ref. # 10CFR50.36
-r C
1UELECTRIC' July 14,1997 C. Lance Terry Group Mce tresident
{
U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446 MONTHLY OPERATING REPORT FOR JUNE 1997 Gentlemen:
Attached is the Monthly 0)erating Report for June 1997, prepared and submitted pursuant to Tec1nical Specification 6.9.1.5 contained in Appendix A to the Comanche Peak Steam Electric Station Units 1 and 2, Operating License Nos. NPF 87 and NPF 89, respectively.
During this r: porting period, there have been no failures or challenges to the Power Operated Relief Valves (PORVs) or Safety Valves (Sys) for CPSES Units 1 and 2.
Should you have any questions, please contact Douglas W. Snow at (254) 897-8448.
Sincerely,
- 8. $. Anwp C. L. Terry uAd, k.
A By:
Rog # D. Walker Regulatory Affairs Manager DWS/grp Attachment
\\fI 1
c-Mr. E. W. Herschoff, Region IV Mr. J. I. Tapia. Region IV yh v Resident Inspectors l
Mr. T. J. Polich, NRR J
9707190160 970630-PDR ADOCK-05000445 bh 100024 R O. Box 1002 Glen Rose Texas 76043
~
Attachment to'TXX 97160 Page l'of 8 COMANCHE PEAK STEAM ELECTRIC STATION," UNIT 1 NRC HONTHLY OPERATING REPORT 7
DOCKET NO.:
50 445 UNIT:'
CPSES 1 DATE:
7/10/97 COMPLETED BY:
Bob Reible TELEPHONE:
817 897 0449 OPERATING STATUS 1.
REPORTING PERIOD:
~ JUNE 1997 GROSS HOURS IN REPORTING PER00:
720 j 2.
CURRENTLY AlffHORIZED POWER LEVEL ( Wt):
3411 MAX. DEPEND. CAPACITY (MWe Net):
1150 l
DESIGN ELECTRICAL RATING (We Net):
1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net):
NONE l 4.
REASON FOR RESTRICTION (If ANY):
t THIS HONTH YR TO DATE CUMULATIVE.
5, NUMBER OF. HOURS REACTOR WAS CRITICAL 720 4,343 50,437 6.
REACTOR RESERVE SHlTTDOWN HOURS 0
0 2.604 7.
HOURS GENERATOR ON LINE 720 4.343 49,797 1
8.
-UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERGY GENERATED (MWH) 2,450.993 14,775.067 162,224,518
- 10. -GROSS ELECTRICAL ENERGY GENERATED (MWH) 822,932 5,005,878 54,194,408
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 788,772 4,807.008 51,730,437 22.' REACTOR SERVICE FACTOR 100.0 100.0 83.6
- 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 87.9 1
-14.
UNIT SERVICE FACTOR 100.0 100.0 82.5
' 15. UNIT AVAILABILITY FACTOR 100.0 100.0 82.5 4
- 16. UNIT CAPACITY FACTOR (USING HDC) 95.3
%.2 74.6 i
' 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 95.3
%.2 74.6
!18.'UNITFORCEDOUTAGERATE 0.0 0.0 4.4
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE, AND DURATION OF EACH):
. 20,'
IF SHlflDOWN AT END OF REPORTING PERIOD,. ESTIMATED DATE OF STARTUP:
, 21.. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 900813
. ESTIMATED
AttachmenttoTXU97160 L Page 2 4f 8 AVERAGE DAILY UNIT POWER LEVEL-
'.DNKET N0.:
50 445 a
UNIT:
CPSES. 1 DATE:
7/10/97 COMPLETED BY:
Bob Reible
~ TELEPHONE:
817 897 0449 MONTH:
JUNE 1997 AVERAGE DAILY POWER LEVEL-AVERAGE DAILY POWER LEVEL
_ MWe Net)-
DAY (MWe-Net).
(
-DAY I
1104 17 10 %
2 1104 18 10 %
3 1104 19 10 %
.4 1103 20 1091 5
1102 21 1041 1
6 1100 22 1095 7
1101 23 1097 8
1100 24 10 %
9 1101 25 1095 3,
2 10 1100 26 1094
'11 1099 27 1093 j
12-1098 28 1093 13 1097 29 1092 i
14 1097 30 1092 15 1097 16' 1095 i
i i
4 e
~!.
.~
= _ -
4 i Attachment to TXX 97160 l
! Page 3 of 8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.:
50 445 UNIT:
CPSES 1
DATE:
7/10/97 4
' COMPLETED BY:
Bob Reible TELEPHONE:
-817 897 0449 MONTH:
JUNE 1997 DAY TIME REMARK / MODE 06/01' 0000 Unit began the month at 100* power.
06/30 2400
. Unit ended the month at 100* power, J
3 1
a 4
6 1
l
Attactment to TXX-97160
' Page 4 cf 8 :
UNIT SHlRDOWNS A10 POWER REDUCTIONS?
s DOCKET NO.:
50-445-UNIT:
CPSES - 11 DATE:
7/10/97
-. COPFLETED BY:
Bob Reible TELEPHOE:
817-897-0449 REPORT MONTH:
. JUNE 1997 METHOD OF
. TYPE SHUTTING DOWi F: FORCED DURATION T}E REACTOR OR NO
-DATE S: SCHEDULED (HOURS)
REASON REDUCING POER CORRECTIVE ACTIONS /C0f0ENTS
- None None 1)
REASON
. 2)
ETH00 A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:- ADMINISTRATIVE
' 2: MANUAL SCRAM C:
REFUELING' G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTER (EXPLAIN)
I T
i 4
f
?
5 l
m m
m.m m
+
u
Attachment to TXX 97160 Page 5.of 8 COMANCHE PEAK STEAM ELECTRIC STAT 10N, UNIT 2 NRC HONTHLY OPERATING REPORT DOCKET NO.:
50 446 UNIT:
CPSES 2 DATE:
7/10/97 COMPLETED BY:
Bob Reible TELEPHONE:
817 897 0449 OPERATING STA11JS 1.
REPORTING PERIOD:
JUNE 1997 GROSS HOURS IN REPORTING PER00:
720 2.
CURRENTLY AUTHORIZED POWER LEVEL (HWt):
3411 MAX. DEPEND. CAPACITY (HWe Net):
1150 DESIGN ELECTRICAL RATING (HWe Net):
1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):
NONE 4.
REASON FOR RESTRICTION (IF ANY):
THIS HONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 720 4.261 28.742 6.
REACTOR RESERVE SHUTDOWN HOURS 0
82 2.311 j
7.
HOURS GENERATOR ON LINE 720 4.240 28,474 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERHAL ENERGY GENERATED (HWH) 2,368.586 13.899,588 92,183.214
- 10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 798,349 4,728.048 31.120.148
'11.
NET ELECTRICAL ENERGY GENERATED (HWH) 766,191 4,538,871 29,767,602
~ 12. REACTOR SERVICE FACTOR 100.0 98.1 83.9
- 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 90.6
- 14. UNIT SERVICE FACTOR 100.0 97.6 83.1
- 15. UNIT AVAILABILITY FACTOR 100.0 97.6 83.1
- 16. UNIT CAPACITY FACTOR (USING HDC) 92.5 90.9 75.5
- 17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 92.5 90.9 75.5
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 6.4
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 HONTHS (TYPE, DATE. AND DURATION OF EACH):
-Third refueling outage (2RF03) scheduled to begin on October 25, 1997 with and estimated duration of 35 days.
'20.
't SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
.21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATED
-Attachment to TXX 97160 Page 6 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
50 446 UNIT:
CPSES 2
DATE:
~7/10/97
~
COMPLETED BY:
' Bob Reible TELEPHONE:
817 897-0449 MONTH:
JUNE 1997 AVERAGE DAILY POWER LEVEL AVERAGE.0AILY POWER LEVEL l
DAY (MWe Net)
DAY (MWe Net) 1 488 17 -
1106 2
546 18 1106 3
980 19 1105 4
1113 20 1104 5
1112 21 1105 6
1112 22 1107 7
1111 23 1109
~
8 1112 24 1107 9
1110 25 1107 10 1111 26 1106 11 1111 27 1106 12 1109 28 1104 13 1109 29 1106 14 1108 30 1102 15 1108 16 1107 a
y
Attachment to TXX 97160-Page 7cof 8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.:
50 446 UNIT:
CPSES 2
DATE:
7/10/97 COMPLETED BY:
Bob Reihle TELEPHONE:
817 897 0449 HONTH:
JUNE 1997 DAY TIME REMARK / MODE' 06/01 0000-Unit began the month at 48% power with repairs to the 28 outboard bearing in progress.
(
06/03 0053 Repairs to the Main Feedwater Pump 28 outboard bearing complete.
Begin ramp to 100* power.
1810 Unit at 100* power.
106/30 2400 Unit ended the month at 982 power to perform routine survie11ance test (NUC 202).
I i
4 d,~
~
Attactment to TXX-97160-Page 8 of 8 UNIT SHLITDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-446 UNIT:
CPSES 2
DATE:
7/10/97 COMPLETED BY:
Bob Reible TELEPHONE:
817-897-0449 REPORT MONTH.
JUNE 1997 METHOD OF TYPE SHLITTING DOWN F: FORCED DURATION THE REACTOR OR i
NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS /C0 K NTS 4
970601 F
A 4
Power to 48% to repair Main Feedwater Pump 2B outboard bearing due to high vibration. (see previous page for additional details).
1)
REASON 2)
METHOD A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
. -.