Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station
ML20211Q016
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/30/1997
From: Reible B, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-97214, NUDOCS 9710220056
Download: ML20211Q016 (9)


Text

. - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ .

A m.

MM Log # TXX 97214

. File # 10010.2 Ref. # 10CFR50.36 nlELECTRIC' C14aaTmr October 16, 1997 any w rmaru U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50 445 AND 50 446 HONTHLY OPERATING REPORT FOR SEPTEMBER 1997 Gentlemen:

Attached is the Monthly Operating Report for September 1997, prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the CPSES Units 1 and 2. Operating License Nos. NPF 87 and NPF 89, respectively. During this reporting period.-there have been no failures or challenges to the Power Operated Relief Valves or Safety Valves for CPSES Units 1 and 2. This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2. Should you have any questions, please contact Douglas W. Snow at (254) 897 8448.

Sincerely.

C. L. Terry By: W D. R. Woodlen Docket Licensing Manager DWS/grp gf Attachment ,, .

c- Mr. E. W. Herschoff Region IV Hr. J. I. Tapia. Region IV Resident Inspectors \

Hr. T. J. Polich. NRR t

'9710220056 970930 7 DR ADOCK 050004 5 llklkl P O. Dos 1002 Glen Rose Texu 76043

SW ul Attactunent to.TXX 97214 Page 1 pf 8 -

COMANCHE PEAK STEAM ELECTRIC STATION. UNIT 1 NRC MONTHLY CPERATING REPORT DOCKET NO.: 50 445-UNIT: CPSES 1 DATE: 10/10/97-COMPLETED BY: Bob Reible TELEPHONE: 254 897 0449 OPERATING STATUS

1. REPORTING PERIOD: SEPTEMBER 1997 GROSS HOURS IN REPORTING PER00: 720 2; CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe Net): 1150
  • DESIGN ELECTRICAL RATING (FWe Net): 1150
3. POWER LEVEL TO WHICH RESTRICTED (if ANY) (MWe Net): NONE
4. - REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS 'tEAC10R WAS CRITICAL 720 6.551~ 52.645
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 2,6N

.7. H0'JRS GENERATOR ON LINE 720 6.551 52.00S

8. UNIT RESERVE SHUTDOWN HOURS 0 0 0 9.- -GROSS THERMAL ENERGY-GENERATED (MWH)- 2.449.639 20,087,743 167.537.194-
10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 817.512 7,509.023 56,697,553
11. NET ELECTRICAL ENERGY GENERATED (MWH) 783.498 7,205.499 54,128,928
12. REACTOR SERVICE FACTOR 1(:0.0 100.0 84.2 13, REACTOR AVAILABILITY FACTOR 100.0 100.0 88.3

-14. UNIT SERVICE FACTOR 100.0 100.0 83.2

15. UNIT AVAILABILITY FACTOR 100.0 100.0 83.2-
16. UNIT CAPACITY FACTOR (USING MDC) 94.6 95.6 75.3
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 94.6 95.6 75.3
18. UNIT FORCED OUTAGE RATE 0.0 0.0 4.2

. 19. SHUTD0Wt4S SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE, AND DURATION OF EACH):

20. -IF SHUTDOWN AT END OF REPORTING PERIOD ESTIMATED DATE OF STARTUP:

4

-21, UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERClAL OPERAT10N 900813 ESTIMATED

AttachmdnttoTXX97214 Page 2 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50 445 UNIT: CPSES 1 DATE: 10/10/97 COMPLETED BY: Bob Reible TELEPHONE: 254 897-0449 MONTH: SEPTEMBER 1997 i

AVERAGE DAILY POWER LEVEL AVEPAGE Dt1LY POWER LEVEL

-DAY. (HWe Net) DAY (MWe Net) 1 1086 17 1090 2 1086 18 1091 3 1085 19 1083

-4 1086 20 1026 5- 1087 21 1092 6 1088 22 1092 7 1088 23 1093 8 1088 24 1096-9 1086 25 1097 10 1088 -26 1097 11 1090 27 1036 12 1090 -28 1096

-13 1090 29 1096 14- 1090 30 1095 15 1090 31 16 1090 i

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.. 50 445 UNIT: CPSES 1 DATE: 10/10/97 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 HONTH: SEPTEMBER 1997 DM TIME REMARK / MODE 09/01 0000 Unit began the month at 100* power.

09/30 2400 Unit ended the m ith at 100% power.

a

~

. t, s - -

. - i'

. .e. . _

l l .

Attachment to IXX-97214

  • P(ge 4 of 8 UNIT SHbTDOWNS AND POWER REDUCTIONS DOCKET NO.- 50-445 l

I UN!T: CPSES 1 l

DATE: 10/10/97 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 REPORT ) NTH: SE iEMBER 1997 METHOD OF TYPE 5 HUTTING DNN F: FORCED DURATION THF REACTOR OR S: SCHEDULED (HOURS) REASON R D.',ING POWER CORRECTIVE ACTIONS / COMMENTS NO DATE None Nore -

2) METHOD
1) REASON E: OPERATOR TRAINING AND LICFNSE EXAMINATI'.)N 1: MANUAL A: ECUIPMENT FAILURE (EXPLAIN)

F: ADMINISTRATIVE 2: MANUAL SCRAM B: MAINT OR TEST G: OPERATIONAL ERROR (EYPLAIN) 3: AUTOMATIC SCRAM C: REFUELING H: OTHER (EYPLAIN) 4: OTHER (EXPLAIN)

D: REGULATORY RESTRIE'10N

- ' n- 3 ,s c. .

Attacnment to TXX-97214 Page 5,of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 lac MONTHLY OPEPATING REPORT DOCKET NO.. 50-446 UNIT: CPSES 2 DATE: 10/10/97 COMPLETED BY: Bob P.eible TELEPHONE: 254 897-0449

' OPEPATING STATUS

-1. REPORTING PERIOD: SEPTEMBER 1997 GROSS HOURS IN REPORTING PER00: 720 ,

{- 2. CURRENTLY AUTHORIZED 0WER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150

  • e DESIGN ELECTRICAL RATING (MWe-Net): 1150
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE
4. REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NIJMBER OF HOURS REACTOR WAS CRITICAL 720 6,469 30,950
6. REACTOR RESERVE SHUTDOWN HOURS 0 82 2,3H

/ HOURS GENERATOR ON LINE 720 6.448 30,682

8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
5. GROSS THERMAL ENERGY GENERATED (MWH) 2.451.499 21.417,946 99,701.572
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 826,109 7.254,249 33,646.349
31. NIT ELECTRICAL ENERGY GENERATED (MWH) 793.814 6.966.274 32.195,005
12. REACTOR SERVICE FACTOR 100.0 98.7 84.9
13. R MCTOR AVAILABillTY FACTOR 100.0 100.0 91.2
14. D'.T SERVICE FACTOR 100.0 98.4 84.1
15. UNIT AVAILA8ILITY FACTOR 100.0 98.4 84.1
16. UNIT CAPACITY FACTOR (USING MDC) 95.9 92.5 76.8

?7 UNIT CAPACITY FACTOR (USING DESIGN MWe) 95.9 92.5 76.8

18. UNIT FORCED OUTAGE RATE 0.0 0.0 6.0 ,
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
20. 1F SHUTDOWN AT END OF PEPORTING PERIOD. ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ALHIEVED COMMERCIAL OPERATION 930803 ESTIMATED ,

Attachmsnt to TXX 97214 Page 6 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.- 50-446 UNIT: CPSES 2 DATE: 10/10/97

. COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 MONTH: SEPTEMBER 1997 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net) 1 1101 17 1103 2 1100 18 1104 3 1099 19 1104 4 1100 20 1103 5 1093 21 1104 6 1065 22 1105 7 1101 23 1107 8 1100 24 1110 S 1100 25 1111 10 1101 26 lill 11 1102 27 1111 12 1102 28 1110 13 1103 29 1110 14 1103 30 1109 15 1103 31 16 1102

Attachment ?,o TXX 97214 Pege 7 'of 8

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-446 UNil: CPSES 2 DATE: 10/10/97 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 HONTH: SEPTEMBER 1997 DAY TIME REMARK / MODE 09/01 0000 Unit began the month at 100% power.

09/30 2400 Unit ended the month 6t 1000 power.

Attachment 10 TXX-97214 ,

Page 8 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS 50-446-DOCKET NO.-

UNIT: CPSES 2 DATE: 10/10/97 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 1

REPORT MONTH: SEPTEMBER 1997 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECT P/E ACTIONS / COMMENTS l DATE 5: SCHEDULED OiOURS) REASON REDUCING POWER NO None None I

2) METHOD
1) REASON E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL .

A:

EQUIPMENT FAILURE (EXPLAIN)

F: ADMINISTRATIVE 2: MANUAL SCRAM B: MAINT OR TEST G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM l C: REFUELING H: 0THER (EXPLAIN) 4: UTHER (EXPLAIN)

D: REGULATORY RESTRICTION l