- Attachment to TXX 93261 Page 10 of 14 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT REV.1 DOCKETNO:
504G UNIT:
CPSES1 DATE:
July 14,1993 ~
COMPLETED BY:
Janet Hughes TELEPHONE:
817 697-5331 OPERATING STATUS 1
Reportiag Period: FEBRUARY 1993 Gross hours in reporting period:
fi22 2.
Currently authorized power level (MWt):
3111 Max. depend. capacity (MWe-Net): 1150
- Design Electrical Rating (MWe-Net):
1150 3.
Power level to which restricted (if any) (MWe-Net):
NONE 4.
Reasons for restriction (if any):
TH!S MOtRH YRTO DATE CUMULATIVE 672 1376.4 16,895 5.
Number of hours reactor was critical 0
39.6 2,22 6.
Reactor reserve shutdown hours 1,
8 16,519.3 7.
Hours generator on line 0
0 0
8.
Unit reserve shutdown hours 2,269,737.6 4,219,840.8 51,515,667.8 9.
Gross thermal energy generated (MWH) 766,531 1,433,798 17,068,963 10.
Gross electrical energy generated (MWH) 735,925 1,369,886 16,212,262 11.
Net electrical energy generated (MWH) 12.
Reactor Service factor 100.0 97.2 75.6 13.
Reactor availability factor 100.0 100.0 85.9 14.
Unit service factor 100.0 96.1 74.0 100.0 96.1 74.0 15.
Unit availability factor 95 2 84.1 G3.1 16.
Unit capacity factor (Using MDC) 95 2 84.1 63.1 17.
Unit capacity factor (Using Design MWe) 0 3.9 7.6 18.
Unit fered outage rate 19.
Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
20.
If shutdown at end of report period, estimated date of startup:
21.
Units in test status (prior to commercial operation):
ACHIEVED Commercial Operation 900813 FEBRUARY 1993
- Estimated REVISION 1 9307200394 930715 9
ADOCK 05000445-QhM PDR R