' Attachment to TXX-98224-Page 1 of 8 COMANCHE' PEAK STEAM ELECTRIC STATION, UNIT 1
-NRC HONTHLY OPERATING REPORT i
y DOCKET N0..
50 445 L
UNIT:
CPSES 1 l
.DATE:
10/ 8/98 COMPLETED BY:
Bob Reible-l I--
TELEPHONE:
254-897-0449 J
l 1
l OPERAIINGSTATUS-l ',
REPORTING PERIOD:
SEPTEMBER 1998 GROSS HOURS IN REPORTING PERIOD:
720
- 2.-
CURRENTLY AUTHOR'IZED POWER LEVEL (MWt):
3411 MAX. DEPEND. CAPACITY (MWe-Net):
1150 i
l
' DESIGN ELECTRICAL RATING (MWe-Net):
1150
' 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
NONE
'4.
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 720 5,665 60,426 6.
' REACTOR RESERVE SHUTDOWN HOURS 0
0 2,632
~ 7.
HOURS GENERATOR ON LINE 720 5.640 59,750
.8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
' 9.
GROSS THERMAL ENERGY GENEPATED (MWH) 2,451,499 18.942.034 195,721,818
': 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 813.403 6,346,821 65,418.781
- 11. NET ELECTRICAL ENERGY-GENERATED (MWH) 779,551 6.073,938 62.476,250
- 12. REACTOR SERVICE FACTOR 100.0 86,5 84.8
.13.
REACTOR AVAILABILITY FACTOR-100.0 86.5 88.4
-14 c JUNIT SERVICE FACTOR:
100.0 86.1 83.8
- 15. 1 UNIT AVAILABILITY FACTOR.
100.0 86.1 83.8 g :16., UNIT CAPACITY FACTOR (USING MDC)-
94.1 80.6 76.2
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 94.1 80.6 76.2 i18.' UNIT FORCED OUTAGE RATE 0.0 0.0 3.8 119. -SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS-(TYPE, DATE, AND DURATION OF EACH):
~
L
- 20. -IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
L
- 21. UNITS IN TEST-STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED L
COMMERCIAL OPERATION 900813 ESTIMATED-9910210070 981012 PDR ADOCK 05000445 is R
PDR y
.s.
Attachment to TXX-98224
[ Page 2 of 8
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-445 UNIT:
CPSES 1
DATE:
10/ 8/98 COMPLETED BY:
Bob Reible TELEPHONE:
254 897-0449 MONTH:
SEPTEMBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL
-DAY (MWe-Net)
DAY (MWe-Net) 1 1081 17 1088 2
1080 18 1089 3
1080 19 1088 4
1080 20 1087 5
1080 21 1787 6
1080 22 1086 7
1080 23 1086 l
8 1080 24 1087 9
1079 25 1087 l
10 1079 26 1087 11 1072 27 1086 12 1052 28 1085 13 1088 29 1083 14 1088 30 1083 15 '
1087 31
- 6 1089 l
l i
i i
Attachment to TXX-98224 i - Page 3 of 8 L.
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.:
50-445 UNIT:
CPSES 1
DATE:
10/ 8/98 i
COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 MONTH:
SEPTEMBER 1998 DAY TIME REMARK / MODE l.
09/01 0000 Unit began the month at 100% power.
09/30 2400 Unit ended the month at 100% power.
l i
i 4
I l
l 4
Attachment-to TXX-98224
. Page.4 of 8 UNIT SHUTDOWNS ANO POWER REDUCTIONS DOCKET NO.:
50-445 UNIT:
CPSES 1
DATE:
10/ 8/98 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 REPORT MONTH:
SEPTEMBER 1998 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS None None 1)
REASON 2)
METHOD A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
0THER (EXPLAIN) 4: OTHER (EXPLAIN) 4
+
l Attachment to TXX-98224 l
Page 5 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2
[
NRC MONTHLY OPERATING REPORT
?
DOCKET NO..
50-446 UNIT:
CPSES 2 DATE:
10/ 8/98 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 l
OPERATING STATUS 1
1.
REPORTING PERIOD:
SEPTEMBER 1998 GROSS HOURS IN REPORTING PERIOD:
720 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
3411 MAX. DEPEND. CAPACITY (MWe-Net):
1150 DESIGN ELECTRICAL RATING (MWe-Net):
1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
NONE 4.
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 720 6.536 38.640 6.
REACTOR RESERVE SHUTDOWN HOURS 0
15 2,326 7.
HOURS GENERATOR ON LINE 720 6.532 38,321 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERGY GENERATED (MWH) 2.281,630 21.242,002 124,347.887
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 760,736 7,172,442 41,973.754
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 728,788 6,884.344 40,175,125
- 12. REACTOR SERVICE FACTOR 100.0 99.8 85.4
- 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 90.6
- 14. UNIT SERVICE FACTOR 100.0 99.7 84.7
- 15. UNIT AVAILABILITY FACTOR 100.0 99.7 84.7
- 16. UNIT CAPACITY FACTOR (USING MDC) 88.0 91.4 77.2 17; 'UNITCAPACITYFACTOR(OSINGDESIGNMWe) 88.0 91.4 77.2
-18.
UNIT FORCED OUTAGE RATE 0.0 0.3 4.9
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE DATE. AND DURATION OF EACH):
l
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATED
- Attachment to TXX-98224 Page 6 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
50-446 UNIT:
CPSES 2
DATE:
10/ 8/98 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 MONTH:
SEPTEMBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net)
.1 857 17
-1104 2-858 18 1104 3
858 19 1101 L
4 858 20 1104 5
858 21 1100 6
857 22 1102 7
856 23 1102 8
859 24 1102 9
859 25 1102 10 858 26 1102 11 863 27 1101 12 1084 28 1102 13 1105 29 1099 14 1104 30 1099 15 1103 31 16 1104 L
I
.... -.=.
Attachment to TXX-98224 Page,7 of 8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO..
50 446 UNIT:
CPSES 2
DATE:
10/ 8/98 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 i
-MONTH:
SEPTEMBER 1998 DAY TIME REMARK / MODE 09/01 0000 Unit began the month at 81% Reactor power as a planned derate to ensure the turbine vibration level did not exceed established limits.
09/11 2100 Unit at 81% power. Commenced ramp to 100% power after planned derate to ensure the turbine vibration level did not exceed established limits.
09/12 0515 Unit completed ramp to 100% power.
09/30 2400 Unit ended the month at 100% power.
1 h
i
Attachment to TXX-98224 Page 8 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-446 UNIT:
CPSES 2
DATE:
10/ 8/98 COMPLETED BY:
Bob Reible
. TELEPHONE:
254-897-0449 REPORT MONTH:
SEPTEMBER 1998 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS 4b 980901 S
H 4
On 07/16 at 0000, unit power was reduced to 81%
power to ensure the turbine blade vibration; did not exceed established limits. This planr.ed reduction was a conservative response to expected high summer temperatures. Ur.it began to ramp to 100% power on 09/11 at 2100. The Unit was returned to 100% power on 09/12 at 0515.
1)
REASON 2)
METHOD A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN) l
-