Attachment to TXX 93261
_.Page 12 of 14 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT REV.1 DOCKET NO:
50415 UNIT:
' CPSES 1 DATE:
July 14,1993 COMPLETED BY:
Janet Hughes TELEPHONE:
817497-5331 OPERATING STATUS 1.
Reporting Period: APRIL 1993 Gross hours in reporting period:
219 2.
Currently authorized power level (MWI):
3111 Max. depend. capacity (MWe-Net): 1150 Design Electrical Rating (MWe Net):
1150 3.
Power level to which restricted (if any) (MWe-Net):
UD.NE 4.
Reasons for restriction (if any):
THIS MONTH VRTO DATE CUMULATIVE 5.
Number of hours reactor was critical 719 2,839.4 18,358 0
39E 2,298.2 6.
Reactor reserve shutdown hours 719 2,823 3 17,982.3 7.
Hours generator on line 0
0 8.
Unit reserve shutdown hours 2,326,877 8,981,628 56,277,455 9.
Gross thermal energy generated (MWH) 766,050 3,016,161 18,651,326 10.
Gross electrical energy generated (MWH) 733,348 2,885,442 17,727,818 11.
Net electrical energy generated (MWH) 12.
Reactor Service factor 100.0 98.6 77.1 13.
Reactor availability factor 100.0 100.0 86.8 14, Unit service factor 100.0 98.1 75.6 15.
Unit availability factor 100.0 98.1 75.6 t
88.7 87.2 64.8 16.
Unit capacity factor (Using MDC) 88.7 87.2 64 8 17.
Unit capacity factor (Using Design MWe) 0 1.9 7.0 18.
Unit forced outage rate 19.
Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
Refueling Outage Number -
3 is scheduled to begin October 8,1993, with a duration of 52 days.
20.
If shutdown at end of report period, estimated date of startup:
21.
Units in test status (prior to commercial operation):
ACHIEVED Commercial Operation 900813 APRIL 1993 Estimated REVISION 1 9307200396 930715