Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 ML20198Q7181997-10-24024 October 1997 Rev 5 to ER-ME-067, Evaluation of Thermo-Lag Fire Barrier Systems ML20137D3601997-03-20020 March 1997 Engineering Self-Assessment Rept ML20129F6991996-10-25025 October 1996 Justification for SPC 1986 LBLOCA Evaluation Model W/Interim Adjustment for Non-Physical Behavior ML20100F2761996-02-13013 February 1996 Rev 0 of Engineering Rept, Resolution of NRC GL 95-07 'Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves.' ML20116M4021996-02-0101 February 1996 Commitment Matl Change Evaluation Rept 0001 for 941101- 960201 ML20095K5411995-12-18018 December 1995 Nonproprietary Small Break LOCA Analysis Methodology ML20094P7971995-11-22022 November 1995 Rev 0 to CPSES Risk-Based IST Program Risk Ranking Determination Study ML20094P7821995-11-22022 November 1995 CPSES Risk-Based IST Program Risk Ranking Determination Study Summary Rept ML20094P4231995-09-29029 September 1995 Pyrolysis Gas Chromatography Analysis of 10 Thermo-Lag Fire Barrier Samples ML20085N2911995-06-21021 June 1995 Individual Plant Exam of External Events for Severe Accident Vulnerabilities TXX-9432, Rev 0 to CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity1994-12-0909 December 1994 Rev 0 to CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity ML20097A3821994-08-19019 August 1994 Individual Plant Exam of External Events,Seismic,Cpses ML20069M8761994-06-10010 June 1994 Engineering Rept Evaluation of Unit 1 & Unit 2 Thermo-Lag Configurations ML20064M6081994-03-21021 March 1994 Engineering Rept Evaluation of Thermo-Lag Fire Barrier Sys ML20059F5431993-10-0505 October 1993 Engineering Rept, Evaluation of Fir Endurance Test Results Related to Cable Functionality in 1-1/2 & 2 Inch Conduits ML18010B0841993-05-0505 May 1993 NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. ML20127K8121993-01-19019 January 1993 Rev 0,to Evaluation of Unit 2 Thermo-Lag Configurations ML20126G2121992-12-23023 December 1992 Rev 2 to ER-ME-067, Evaluation of Thermo-Lag Fire Barrier Systems ML20126C0421992-12-18018 December 1992 Suppl 6 to Human Factors Control Room Design Review of Comanche Peak Steam Electric Station ML20126A3621992-12-15015 December 1992 Rev 3 to Receipt,Dispensing,Quality & Insp Requirements for Thermo-Lag Fire Barrier Matls ML18010A9521992-11-30030 November 1992 NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. ML20116C9511992-10-27027 October 1992 Individual Plant Exam Submittal:Comanche Peak Steam Electric Station Vol II:Back-End Analysis ML20115D2241992-09-29029 September 1992 Rev 1 to HI-92880, Criticality SE of Comanche Peak Fuel Storage Facilities W/Fuel of 5% Enrichment ML20127C8291992-09-0808 September 1992 Rev 1 to Interim Engineering Rept, Evaluation of Thermo-Lag Fire Barrier Sys ML20114B8051992-09-0101 September 1992 Suppl 5 to Human Factors Control Room Design Review of Comanche Peak Steam Electric Station ML20114C6101992-08-31031 August 1992 Individual Plant Exam Comanche Peak Steam Electric Station Vol 1:Front-End Analysis ML20105A7821992-08-14014 August 1992 Engineering Rept on Thermo-Lag 330-1 Fireproofing Coating Thicknesses Required for 1 & 2 Hour Fire Ratings for Various Structural Steel Members Used by Texas Utils Svcs,Inc ML20105A8471992-08-0606 August 1992 Rev 0 to Comanche Peak Steam Electric Station Unit 2 Engineering Bwip Check Valve 2AF-0083 Failure Investigation ML20116C9621992-07-16016 July 1992 Review of IPE Level 2 Draft Repts for Cpses ML20078H1581992-06-19019 June 1992 CPSES Thermo-Lag Barrier Applications Thermo-Lag Fire Test Conduit & J-Box Test Assemblies. Preliminary Test Results ML20095H2411992-04-13013 April 1992 Validation Efforts for Comanche Peak Steam Electric Station Unit 2 ML20094P3371992-03-26026 March 1992 Control Room Simulator 10CFR55 Certification Initial Rept TXX-9200, RHR Line Summary Rept1992-03-23023 March 1992 RHR Line Summary Rept ML20086E3861991-10-31031 October 1991 Pressurizer Surge Line Transient Justification ML20079D0481991-06-21021 June 1991 Engineering Rept, Testing & Analysis of Commercial-Grade Swing Arms in Borg-Warner Check Valves, June 1991 ML20077E0271991-05-31031 May 1991 Methodology for Reactor Core Response to Steamline Break Events ML20217C4601991-05-31031 May 1991 Reactivity Anomaly Events Methodology ML20073Q8291991-05-17017 May 1991 Small Break LOCA Analysis Methodology ML20084V1401991-03-31031 March 1991 Safety Evaluation for Operation of Comanche Peak Unit 1 W/ Positive Moderator Temp Coefficient ML20079D0571991-03-31031 March 1991 Final Rept on Analysis of Check Valve Swing Arms, Mar 1991 ML20066F4331991-01-31031 January 1991 Draft Analysis of Flow Stratification in Surge Line of Comanche Peak Reactor ML20066L0691990-12-31031 December 1990 Large Break LOCA Analysis Methodology ML20066B2391990-12-31031 December 1990 Control Rod Worth Analysis ML20067B1291990-12-24024 December 1990 Suppl 1 to TUE-1 DNB Correlation ML20062D9041990-11-12012 November 1990 Unit One Loose Parts Monitoring Sys Special Rept 1999-08-06
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] |