Revised Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station,Units 1 & 2
ML20129F160
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/30/1996
From: Samuel M
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20129F166 List:
References
NUDOCS 9610290042
Download: ML20129F160 (8)


Text

_ . _ _ . _ _ . _ _ _ _ . _ _

. a Attachment to TXX 96494 Page 1 of 8

'. COMANCHE PEAK STEAN ELECTRIC STATION UNIT 1 i

NRC MONTHLY OPERATING REPORT DOCKET NO.: 50-445 UNIT: CPSES 1 DATE: 10/ 7/%

COMPL'TED BY: Mark Samuel TELEPKWE: 817 897 5793 OPERATING STATUS

1. REPORTING PERIOD: SEPTEMER 1996 GROSS HOURS IN REPORTING PEROD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL ( Wt): 3411 MAX. DEPEND. CAPACITY ( % Net): 1150
  • DESIGN ELECTRICAL RATING ( % Net): 1150
3. POWER LEVEL TO nMICH RESTRICTED (IF ANY) (% Net): NONE
4. P.EASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NUMER OF HOURS REACTOR WAS CRITICAL 720 6.127 44.878
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 2.604 ,
7. HOURS GENERATOR ON LINE 720 6.083 44.272
8. UNIT RESERVE SHUTDOWN HOURS -0 0 0
9. GROSS THERMAL ENERGY GENERATED ( M ) 2.449.157 20.211.833 143.637.085 e
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 818.306 6.833.706 47.899.909 ,

1

11. NET ELECTRICAL ENERGY GENERATED (MWH) 785.257 6.S35.569 45.702.762 l
12. REACTOR SERVICE FACTOR 100.0 93.2 83.5
13. REACTOR AVAILABILITY FACTOR 100.0 93.2 88.3
14. UNIT SERVICE FACTOR 100.0 92.5 82.3
15. UNIT AVAILABILITY. FACTOR 100.0 92.5 82.3
16. UNIT CAPACITY FACTOR (USING 2C) 94.8 86.4 73.9
17. UNIT CAPACITY FACTOR (USING DESIGN % ) 94.8 86.4 73.9 1
18. UNIT FORCED OUTAGE RATE 0.0 7.5 4.9
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

Refueling outage (1RF05) began on October 4.1996 with an estimated duration of 44 Days.

20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO C0 K RCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION: 900813
  • ESTIMATED 9610290042 961018 PDR ADOCK 05000445 R PDR

. . .. ..~ . -.- . . __ . ~ = - . - . . -.-__ . - - . - . - . . - . . _ . . . . . _ -

J Attachment to TXX 96494 l i Pa9e 2 of 8 , )

. i i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50 445

UNIT
CPSES 1 l
DATE
10/ 7/% l i

COMPLETED BY: Mark Samuel TELEPHONE: 817 897 5793

]

MONTH: SEPTEMER 19%

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe Net) DAY ( % Net) 3-1 1010 17 1092 l 2 1091 18 1093  ;

3 1091 19 1093 1 4 1091 20 1095

5 1091 21 1097 l l 6 1090 22 1098 j 7 1089 23 1097 i

8 1088 24 1098 l

, 9 1088 25 1101 ,

l i 10 1089 26 1098 l 11 1088 27 1100 12 1090 28 1102 13 1087 29 1102 j

14 1087 30 1102

. 15 1089 16 1092 J

t I.

l

  • l l  !

Attachment to TXX 96494 )

Page 3 of 8 ,

l

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH l

)

DOCKET NO.: 50 445 UNIT: CPSES 1  ;

OATE: 10/ 7/96 J COMPLETED BY: Mark Samuel TELEPHONE: 817 897 5793 'l MONTH: SEPTEMBER 19% ,

DAY TIME REMARK / MODE 09/01 0000 Unit began the month at 80* power for performance of routine turbine stop and control valve testing.

1040 Unit .eturned to 100* power.

09/30 2400 Unit ended the month at 100* power.

k a

l i

l l

l i

l I

i 4

I i

l

Attachment to TXX-96494 Page 4 of 8 '

UNIT SHUTDOWNS A E PCWER REIi.Ci10NS DOCKET NO.: 50 445

  • UNIT: CPSES 1 DATE: 10/ 7/%

COMPLETED BY: Mark Samuel TELEPHONE: 817-897-5793 REPORT MONTH: SEPTEMER 1996 ETHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS /COPENTS NONE

1) REASON 2) ETHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADNINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)

- - + - - - +- -- _ _ _ _ _ _ _ _ . _ - - _ _ _ = _ _ _ _ _ _ _ _ _ - - ,

Attachment to TXX 96494 '

Page 5 of 8

'. COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO.: 50 446 UNIT: CPSES 2 DATE: 10/ 7/% l COMPLETED BY: Mark Samuel '

TELEPHONE: 817 897 5793 OPERATING STATUS, Revision 1 l

1. REPORTING PERIOD: SEPTEMBER 19% GROSS HOURS IN REPORTING PER00: 720
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (We Net): 1150
  • DESIGN ELECTRICAL RATING (MWe Net): 1150
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net): NONE
4. REASON FOR RESTRICTION (IF ANY):  ;

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTCR WAS CRITICAL 661 4,751 22,295 l

l

6. REACTIA RESERVE SHUTDOWN HOURS 0 0 2,229  :
7. HOURS GENERATOR ON LINE 655 4,734 22.056 j I
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2.011,807 15,401.212 70.964,123 i
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 671,025 5,188.663 23.893.284 1
11. NET ELECTRICAL ENERGY GENERATED ( WH) 638,507 4,968,005 22,826.363
12. REACTOR SERVICE FACTOR 91.8 72.3 80.5
13. REACTOR AVAILABILITY FACTOR 91.8 72.3 88.5
14. UNIT SERVICE FACTOR 90.9 72.0 79.6
15. UNIT AVAILABILITY FACTOR 90.9 72.0 79.6
16. UNIT CAPACITY FACTOR (USING MDC) 77.1 65.7 71.6 )
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 77.1 65.7 71.6
18. UNIT FORCED OUTAGE RATE 9.1 10.6 8.0 1
19. SHlRDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:

i 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION: 930803

  • ESTIMATED I

Attachment to TXX 96494 Page 6 of 8 ,

AVERAGE DAILY UNIT POWER LEVEL l 1

DOCKET NO.: 50 446 UNIT: CPSES 2 DATE: 10/ 7/%

COMPLETED BY: Mark Samuel TELEPHONE: 817 897-5793 MONTH: SEPTE)SER 19%

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (We Net) DAY (We Net) 1 1110 17 1105 l l

2 110.9 18 574 l 3 1109 19 0 4 1109 20 0 I

5 1108 21 175 j l

6 1107 22 542  ;

7 1106 23 516 8 1106 24 516 9 1105 25 516 10 1105 26 603 11 1105 27 1093 l 12 1105 28 1117 13 1103 29 1117 l

l 14 1104 30 1116 15 1104 l

16 1105

i

, . . o Attachment to TXX 96494

-Page 7 of 4' '.

SUP9MRY OF OPERATING EXPERIENCE FOR THE MONTH l DOCKET NO.: 50 446 ,

UNIT: CPSES 2

DATE: 10/ 7/%

! COMPLETED BY: Mark Samuel l TELEPHONE: 817 897 5793 l l MONTH: SEPTEMBER 19%

DAY TIME REMARK / MODE l

09/01 0000 Unit started the month at 100* power.  ;

09/18 1245 Unit tripped after a reactor coolant system instrument spike that resulted from a lightning strike. Unit entered Mode 3.

l 09/20 2257 Commenced reactor startup.

2351 Unit in Mode 2. Reactor entered criticality, 09/21 0517 Unit entered Mode 1.

0608 Unit synchronized to the grid: unit began ramping up power.

09/22 0354 Unit held at 61% power due to high bearing temperature of Heater l Drain Pump 2 02. Began overhaul of Heater Drain Pump 2 02.

1407 Reduced power to 56% due to Main Feedwater Pump 2 01 high bearing l temperature. Power maintained at 56% to repair the bearing on the Main Feedwater Pump. Also during this time Turbine Plant Cooling Water Pump 2 02 was realigned to resolve high bearing temperature on this pump.

l 09/26 1650 Repairs completed on all pumps and initiated unit ramp up.

09/27 0553 Unit achieved 100* power.

09/30 2400 Unit ended the month at 100* power.

Attachment to TXX-96494 Page 8 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 10/ 7/%

COMPLETED BY: Mark Samuel TELEPHONE: 817-897-5793 REPORT MONTH: SEPTElBER 1996 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS / COP 9ENTS 8  % 0918 F 65.4 H 3 Reactor tripped due to lightning strike causing reactor coolant system instrument spike.

Reference:

LER 446/%-006.

9  % 0922 F A 4 While ramping up, held power at 61% due to Heater Drain Pump 2-02 high bearing temperature.

Reduced power level to 56% due to high bearing temperature on Main Feedwater Pump 2-01.

Continued the power ramp up after completing all the pump repairs.See previous page for additional details.