MONTHYEARML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20202H0431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Cpses,Units 1 & 2 ML20198N7141997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Cpses,Units 1 & 2 ML20197J0941997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for CPSES Units 1 & 2 ML20199D2261997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Cpses,Units 1 & 2 TXX-9721, Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station ML20212C4851997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for CPSES Unit 2 ML20210V2101997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CPSES ML20141J3911997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CPSES ML20149E2991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for CPSES TXX-9713, Monthly Operating Repts for May 1997 for CPSES1997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CPSES TXX-9710, Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station1997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station TXX-9708, Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 2 ML20137B9781997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for CPSES Units 1 & 2 ML20134Q2521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20137B9901997-01-31031 January 1997 Revised MOR for Jan 1997 CPSES Unit 2 ML20133M1971996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20132C1631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Comanche Peak Steam Electric Station TXX-9650, Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station1996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station ML20129F1601996-09-30030 September 1996 Revised Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20129B2401996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station ML20117N5201996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Comanche Peak Steam Electric Station ML20116N6651996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Comanche Peak Unit 1 & 2 TXX-9640, Monthly Operating Rept for June 1996 for Comanche Peak Electric Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Comanche Peak Electric Station TXX-9638, Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20112A1951996-04-30030 April 1996 Monthly Operating Repts for April 1996 for CPSES ML20101D0461996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Comanche Peak Steam Electric Station Units 1 & 2 TXX-9601, Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20101D0511996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Comanche Peak Steam Electric Station Unit 1 ML20096E7381995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Comanche Peak Steam Electric Station TXX-9530, Monthly Operating Repts for Nov 1995 for Comanche Peak Steam Electric Station1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Comanche Peak Steam Electric Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] |
Text
_ . _ _ . _ _ . _ _ _ _ . _ _
. a Attachment to TXX 96494 Page 1 of 8
'. COMANCHE PEAK STEAN ELECTRIC STATION UNIT 1 i
NRC MONTHLY OPERATING REPORT DOCKET NO.: 50-445 UNIT: CPSES 1 DATE: 10/ 7/%
COMPL'TED BY: Mark Samuel TELEPKWE: 817 897 5793 OPERATING STATUS
- 1. REPORTING PERIOD: SEPTEMER 1996 GROSS HOURS IN REPORTING PEROD: 720
- 2. CURRENTLY AUTHORIZED POWER LEVEL ( Wt): 3411 MAX. DEPEND. CAPACITY ( % Net): 1150
- DESIGN ELECTRICAL RATING ( % Net): 1150
- 3. POWER LEVEL TO nMICH RESTRICTED (IF ANY) (% Net): NONE
- 4. P.EASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMER OF HOURS REACTOR WAS CRITICAL 720 6.127 44.878
- 6. REACTOR RESERVE SHUTDOWN HOURS 0 0 2.604 ,
- 7. HOURS GENERATOR ON LINE 720 6.083 44.272
- 8. UNIT RESERVE SHUTDOWN HOURS -0 0 0
- 9. GROSS THERMAL ENERGY GENERATED ( M ) 2.449.157 20.211.833 143.637.085 e
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 818.306 6.833.706 47.899.909 ,
1
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 785.257 6.S35.569 45.702.762 l
- 12. REACTOR SERVICE FACTOR 100.0 93.2 83.5
- 13. REACTOR AVAILABILITY FACTOR 100.0 93.2 88.3
- 14. UNIT SERVICE FACTOR 100.0 92.5 82.3
- 15. UNIT AVAILABILITY. FACTOR 100.0 92.5 82.3
- 16. UNIT CAPACITY FACTOR (USING 2C) 94.8 86.4 73.9
- 17. UNIT CAPACITY FACTOR (USING DESIGN % ) 94.8 86.4 73.9 1
- 18. UNIT FORCED OUTAGE RATE 0.0 7.5 4.9
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
Refueling outage (1RF05) began on October 4.1996 with an estimated duration of 44 Days.
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO C0 K RCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION: 900813
- ESTIMATED 9610290042 961018 PDR ADOCK 05000445 R PDR
. . .. ..~ . -.- . . __ . ~ = - . - . . -.-__ . - - . - . - . . - . . _ . . . . . _ -
J Attachment to TXX 96494 l i Pa9e 2 of 8 , )
. i i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50 445
- UNIT
- CPSES 1 l
- DATE
- 10/ 7/% l i
COMPLETED BY: Mark Samuel TELEPHONE: 817 897 5793
]
MONTH: SEPTEMER 19%
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe Net) DAY ( % Net) 3-1 1010 17 1092 l 2 1091 18 1093 ;
3 1091 19 1093 1 4 1091 20 1095
- 5 1091 21 1097 l l 6 1090 22 1098 j 7 1089 23 1097 i
8 1088 24 1098 l
, 9 1088 25 1101 ,
l i 10 1089 26 1098 l 11 1088 27 1100 12 1090 28 1102 13 1087 29 1102 j
14 1087 30 1102
. 15 1089 16 1092 J
t I.
l
Attachment to TXX 96494 )
Page 3 of 8 ,
l
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH l
)
DOCKET NO.: 50 445 UNIT: CPSES 1 ;
OATE: 10/ 7/96 J COMPLETED BY: Mark Samuel TELEPHONE: 817 897 5793 'l MONTH: SEPTEMBER 19% ,
DAY TIME REMARK / MODE 09/01 0000 Unit began the month at 80* power for performance of routine turbine stop and control valve testing.
1040 Unit .eturned to 100* power.
09/30 2400 Unit ended the month at 100* power.
k a
l i
l l
l i
l I
i 4
I i
l
Attachment to TXX-96494 Page 4 of 8 '
UNIT SHUTDOWNS A E PCWER REIi.Ci10NS DOCKET NO.: 50 445
- UNIT: CPSES 1 DATE: 10/ 7/%
COMPLETED BY: Mark Samuel TELEPHONE: 817-897-5793 REPORT MONTH: SEPTEMER 1996 ETHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS /COPENTS NONE
- 1) REASON 2) ETHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADNINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
- - + - - - +- -- _ _ _ _ _ _ _ _ . _ - - _ _ _ = _ _ _ _ _ _ _ _ _ - - ,
Attachment to TXX 96494 '
Page 5 of 8
'. COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO.: 50 446 UNIT: CPSES 2 DATE: 10/ 7/% l COMPLETED BY: Mark Samuel '
TELEPHONE: 817 897 5793 OPERATING STATUS, Revision 1 l
- 1. REPORTING PERIOD: SEPTEMBER 19% GROSS HOURS IN REPORTING PER00: 720
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (We Net): 1150
- DESIGN ELECTRICAL RATING (MWe Net): 1150
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net): NONE
- 4. REASON FOR RESTRICTION (IF ANY): ;
THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTCR WAS CRITICAL 661 4,751 22,295 l
l
- 6. REACTIA RESERVE SHUTDOWN HOURS 0 0 2,229 :
- 7. HOURS GENERATOR ON LINE 655 4,734 22.056 j I
- 8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 2.011,807 15,401.212 70.964,123 i
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 671,025 5,188.663 23.893.284 1
- 11. NET ELECTRICAL ENERGY GENERATED ( WH) 638,507 4,968,005 22,826.363
- 12. REACTOR SERVICE FACTOR 91.8 72.3 80.5
- 13. REACTOR AVAILABILITY FACTOR 91.8 72.3 88.5
- 14. UNIT SERVICE FACTOR 90.9 72.0 79.6
- 15. UNIT AVAILABILITY FACTOR 90.9 72.0 79.6
- 16. UNIT CAPACITY FACTOR (USING MDC) 77.1 65.7 71.6 )
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 77.1 65.7 71.6
- 18. UNIT FORCED OUTAGE RATE 9.1 10.6 8.0 1
- 19. SHlRDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
i 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION: 930803
Attachment to TXX 96494 Page 6 of 8 ,
AVERAGE DAILY UNIT POWER LEVEL l 1
DOCKET NO.: 50 446 UNIT: CPSES 2 DATE: 10/ 7/%
COMPLETED BY: Mark Samuel TELEPHONE: 817 897-5793 MONTH: SEPTE)SER 19%
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (We Net) DAY (We Net) 1 1110 17 1105 l l
2 110.9 18 574 l 3 1109 19 0 4 1109 20 0 I
5 1108 21 175 j l
6 1107 22 542 ;
7 1106 23 516 8 1106 24 516 9 1105 25 516 10 1105 26 603 11 1105 27 1093 l 12 1105 28 1117 13 1103 29 1117 l
l 14 1104 30 1116 15 1104 l
16 1105
i
, . . o Attachment to TXX 96494
-Page 7 of 4' '.
SUP9MRY OF OPERATING EXPERIENCE FOR THE MONTH l DOCKET NO.: 50 446 ,
UNIT: CPSES 2
- DATE: 10/ 7/%
! COMPLETED BY: Mark Samuel l TELEPHONE: 817 897 5793 l l MONTH: SEPTEMBER 19%
DAY TIME REMARK / MODE l
09/01 0000 Unit started the month at 100* power. ;
09/18 1245 Unit tripped after a reactor coolant system instrument spike that resulted from a lightning strike. Unit entered Mode 3.
l 09/20 2257 Commenced reactor startup.
2351 Unit in Mode 2. Reactor entered criticality, 09/21 0517 Unit entered Mode 1.
0608 Unit synchronized to the grid: unit began ramping up power.
09/22 0354 Unit held at 61% power due to high bearing temperature of Heater l Drain Pump 2 02. Began overhaul of Heater Drain Pump 2 02.
1407 Reduced power to 56% due to Main Feedwater Pump 2 01 high bearing l temperature. Power maintained at 56% to repair the bearing on the Main Feedwater Pump. Also during this time Turbine Plant Cooling Water Pump 2 02 was realigned to resolve high bearing temperature on this pump.
l 09/26 1650 Repairs completed on all pumps and initiated unit ramp up.
09/27 0553 Unit achieved 100* power.
09/30 2400 Unit ended the month at 100* power.
Attachment to TXX-96494 Page 8 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 10/ 7/%
COMPLETED BY: Mark Samuel TELEPHONE: 817-897-5793 REPORT MONTH: SEPTElBER 1996 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS / COP 9ENTS 8 % 0918 F 65.4 H 3 Reactor tripped due to lightning strike causing reactor coolant system instrument spike.
Reference:
LER 446/%-006.
9 % 0922 F A 4 While ramping up, held power at 61% due to Heater Drain Pump 2-02 high bearing temperature.
Reduced power level to 56% due to high bearing temperature on Main Feedwater Pump 2-01.
Continued the power ramp up after completing all the pump repairs.See previous page for additional details.
t
- 1) REASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: RZGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
- - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - - _ _ _ - _ _ _ - _ _ - _ _ _ _ . - . - . - - - -