. a Attachment to TXX 96494 Page 1 of 8 COMANCHE PEAK STEAN ELECTRIC STATION UNIT 1 i
NRC MONTHLY OPERATING REPORT DOCKET NO.:
50-445 UNIT:
CPSES 1 DATE:
10/ 7/%
COMPL'TED BY:
Mark Samuel TELEPKWE:
817 897 5793 OPERATING STATUS 1.
REPORTING PERIOD:
SEPTEMER 1996 GROSS HOURS IN REPORTING PEROD:
720 2.
CURRENTLY AUTHORIZED POWER LEVEL ( Wt):
3411 MAX. DEPEND. CAPACITY ( % Net):
1150 DESIGN ELECTRICAL RATING ( % Net):
1150 3.
POWER LEVEL TO nMICH RESTRICTED (IF ANY) (% Net):
NONE 4.
P.EASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMER OF HOURS REACTOR WAS CRITICAL 720 6.127 44.878 6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 2.604 7.
HOURS GENERATOR ON LINE 720 6.083 44.272 8.
UNIT RESERVE SHUTDOWN HOURS
-0 0
0 9.
GROSS THERMAL ENERGY GENERATED ( M )
2.449.157 20.211.833 143.637.085 e
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 818.306 6.833.706 47.899.909 1
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 785.257 6.S35.569 45.702.762
- 12. REACTOR SERVICE FACTOR 100.0 93.2 83.5
- 13. REACTOR AVAILABILITY FACTOR 100.0 93.2 88.3
- 14. UNIT SERVICE FACTOR 100.0 92.5 82.3
- 15. UNIT AVAILABILITY. FACTOR 100.0 92.5 82.3
- 16. UNIT CAPACITY FACTOR (USING 2C) 94.8 86.4 73.9
- 17. UNIT CAPACITY FACTOR (USING DESIGN % )
94.8 86.4 73.9 1
- 18. UNIT FORCED OUTAGE RATE 0.0 7.5 4.9
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
Refueling outage (1RF05) began on October 4.1996 with an estimated duration of 44 Days.
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO C0 K RCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION:
900813 ESTIMATED 9610290042 961018 PDR ADOCK 05000445 R
..~. -.-..
~ =
J Attachment to TXX 96494 i Pa9e 2 of 8 i
i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
50 445 UNIT:
CPSES 1
DATE:
10/ 7/%
l i
COMPLETED BY:
Mark Samuel TELEPHONE:
817 897 5793
]
MONTH:
SEPTEMER 19%
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe Net)
DAY
( % Net) 3-1 1010 17 1092 l
2 1091 18 1093 3
1091 19 1093 1
4 1091 20 1095 5
1091 21 1097 l
6 1090 22 1098 j
7 1089 23 1097 i
8 1088 24 1098 9
1088 25 1101 l
i 10 1089 26 1098 11 1088 27 1100 12 1090 28 1102 13 1087 29 1102 j
14 1087 30 1102 15 1089 16 1092 J
t I.
l l
l Attachment to TXX 96494
)
Page 3 of 8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH l
)
DOCKET NO.:
50 445 UNIT:
CPSES 1
OATE:
10/ 7/96 J
COMPLETED BY:
Mark Samuel TELEPHONE:
817 897 5793
'l MONTH:
SEPTEMBER 19%
DAY TIME REMARK / MODE 09/01 0000 Unit began the month at 80* power for performance of routine turbine stop and control valve testing.
1040 Unit.eturned to 100* power.
09/30 2400 Unit ended the month at 100* power.
k a
i l
l l
i l
I i
4 I
i l
Attachment to TXX-96494 Page 4 of 8 UNIT SHUTDOWNS A E PCWER REIi.Ci10NS DOCKET NO.:
50 445 UNIT:
CPSES 1
DATE:
10/ 7/%
COMPLETED BY:
Mark Samuel TELEPHONE:
817-897-5793 REPORT MONTH:
SEPTEMER 1996 ETHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS /COPENTS NONE 1)
REASON 2)
ETHOD r
A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADNINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
- - + - - - +- --
=
Attachment to TXX 96494 Page 5 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO.:
50 446 UNIT:
CPSES 2 DATE:
10/ 7/%
l COMPLETED BY:
Mark Samuel TELEPHONE:
817 897 5793 OPERATING STATUS, Revision 1 l
1.
REPORTING PERIOD:
SEPTEMBER 19%
GROSS HOURS IN REPORTING PER00:
720 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
3411 MAX. DEPEND. CAPACITY (We Net):
1150 DESIGN ELECTRICAL RATING (MWe Net):
1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net):
NONE 4.
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTCR WAS CRITICAL 661 4,751 22,295 l
l 6.
REACTIA RESERVE SHUTDOWN HOURS 0
0 2,229 7.
HOURS GENERATOR ON LINE 655 4,734 22.056 j
8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERGY GENERATED (MWH) 2.011,807 15,401.212 70.964,123 i
1
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 671,025 5,188.663 23.893.284
- 11. NET ELECTRICAL ENERGY GENERATED ( WH) 638,507 4,968,005 22,826.363
- 12. REACTOR SERVICE FACTOR 91.8 72.3 80.5
- 13. REACTOR AVAILABILITY FACTOR 91.8 72.3 88.5
- 14. UNIT SERVICE FACTOR 90.9 72.0 79.6
- 15. UNIT AVAILABILITY FACTOR 90.9 72.0 79.6
- 16. UNIT CAPACITY FACTOR (USING MDC) 77.1 65.7 71.6
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 77.1 65.7 71.6
- 18. UNIT FORCED OUTAGE RATE 9.1 10.6 8.0 1
- 19. SHlRDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
i
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION:
930803 ESTIMATED I
Attachment to TXX 96494 Page 6 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
50 446 UNIT:
CPSES 2
DATE:
10/ 7/%
COMPLETED BY:
Mark Samuel TELEPHONE:
817 897-5793 MONTH:
SEPTE)SER 19%
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (We Net)
DAY (We Net) 1 1110 17 1105 2
110.9 18 574 3
1109 19 0
4 1109 20 0
5 1108 21 175 j
6 1107 22 542 7
1106 23 516 8
1106 24 516 9
1105 25 516 10 1105 26 603 11 1105 27 1093 l
12 1105 28 1117 13 1103 29 1117 l
l 14 1104 30 1116 15 1104 l
16 1105
i o
Attachment to TXX 96494
-Page 7 of 4' SUP9MRY OF OPERATING EXPERIENCE FOR THE MONTH l
DOCKET NO.:
50 446 UNIT:
CPSES 2
DATE:
10/ 7/%
COMPLETED BY:
Mark Samuel l
TELEPHONE:
817 897 5793 l
l MONTH:
SEPTEMBER 19%
DAY TIME REMARK / MODE 09/01 0000 Unit started the month at 100* power.
09/18 1245 Unit tripped after a reactor coolant system instrument spike that resulted from a lightning strike. Unit entered Mode 3.
l 09/20 2257 Commenced reactor startup.
2351 Unit in Mode 2.
Reactor entered criticality, 09/21 0517 Unit entered Mode 1.
0608 Unit synchronized to the grid: unit began ramping up power.
09/22 0354 Unit held at 61% power due to high bearing temperature of Heater l
Drain Pump 2 02. Began overhaul of Heater Drain Pump 2 02.
1407 Reduced power to 56% due to Main Feedwater Pump 2 01 high bearing l
temperature. Power maintained at 56% to repair the bearing on the Main Feedwater Pump. Also during this time Turbine Plant Cooling Water Pump 2 02 was realigned to resolve high bearing temperature on this pump.
l 09/26 1650 Repairs completed on all pumps and initiated unit ramp up.
09/27 0553 Unit achieved 100* power.
09/30 2400 Unit ended the month at 100* power.
Attachment to TXX-96494 Page 8 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-446 UNIT:
CPSES 2
DATE:
10/ 7/%
COMPLETED BY:
Mark Samuel TELEPHONE:
817-897-5793 REPORT MONTH:
SEPTElBER 1996 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COP 9ENTS 8
% 0918 F
65.4 H
3 Reactor tripped due to lightning strike causing reactor coolant system instrument spike.
Reference:
LER 446/%-006.
9
% 0922 F
A 4
While ramping up, held power at 61% due to Heater Drain Pump 2-02 high bearing temperature.
Reduced power level to 56% due to high bearing temperature on Main Feedwater Pump 2-01.
Continued the power ramp up after completing all the pump repairs.See previous page for additional details.
t 1)
REASON 2)
METHOD A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
RZGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN) r
-