MONTHYEARML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20202H0431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Cpses,Units 1 & 2 ML20198N7141997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Cpses,Units 1 & 2 ML20197J0941997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for CPSES Units 1 & 2 ML20199D2261997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Cpses,Units 1 & 2 TXX-9721, Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station ML20212C4851997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for CPSES Unit 2 ML20210V2101997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CPSES ML20141J3911997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CPSES ML20149E2991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for CPSES TXX-9713, Monthly Operating Repts for May 1997 for CPSES1997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CPSES TXX-9710, Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station1997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station TXX-9708, Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 2 ML20137B9781997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for CPSES Units 1 & 2 ML20134Q2521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20137B9901997-01-31031 January 1997 Revised MOR for Jan 1997 CPSES Unit 2 ML20133M1971996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20132C1631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Comanche Peak Steam Electric Station TXX-9650, Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station1996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station ML20129F1601996-09-30030 September 1996 Revised Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20129B2401996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station ML20117N5201996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Comanche Peak Steam Electric Station ML20116N6651996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Comanche Peak Unit 1 & 2 TXX-9640, Monthly Operating Rept for June 1996 for Comanche Peak Electric Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Comanche Peak Electric Station TXX-9638, Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20112A1951996-04-30030 April 1996 Monthly Operating Repts for April 1996 for CPSES ML20101D0461996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Comanche Peak Steam Electric Station Units 1 & 2 TXX-9601, Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20101D0511996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Comanche Peak Steam Electric Station Unit 1 ML20096E7381995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Comanche Peak Steam Electric Station TXX-9530, Monthly Operating Repts for Nov 1995 for Comanche Peak Steam Electric Station1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Comanche Peak Steam Electric Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] |
Text
_.. _ _
I mummmmmmme Log # TXX 96504 l
===- File # 10010.2 7]
- Ref. # 10CFR50.36 )
=_ =__
November 15, 1996 7UELECTRIC C. Lance Terry
&mq vke Pmident U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446 MONTHLY OPERATING bEPORT FOR OCTOBER 1996 )
Gentlemen:
i Attached is the Monthly Operating Report for October 1996, prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in i Appendix A to the Comanche Peak Steam Electric Station Units 1 and 2.
Operating License Nos. NPF 87 and NPF 89, respectively. Should you have any questions, please contact Jacob H. Kulangara at (817) 897 0124.
Sincerely, i
C. L. Terry By:
J. S. Marshall Generic Licensing Manager i
JHK/jak Attachment cc: Mr. L. J. Callan, Region IV Hr. J. I. Tapia, Region IV i
Hr. T. J. Polich, NRR Resident Inspectors l
~ '
9611260097 961031 PDR ADOCK 05000445 /
R PDR l
l cc0043 l P.O. Box 1002 Glen Rose. Texas 76043
Attachment to TXX %504 Page 1 of 8
. . . COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKET NO.: 50 445 UNIT: CPSES 1 DATE: 11/ 8/%
COMPLETED BY: Mark Samuel TELEPHONE: 817 897 5793 OPERATING STATUS
- 1. REPORTING PERIOD: OCTOBER 19% GROSS HOURS IN REPORTING PER00: 745
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe Net): 1150
- DESIGN ELECTRICAL RATING (MWe Net): 1150
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net): NONE
- 4. REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE I
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 100 6.226 44,978
- 6. REACTOR RESERVE SHUTDOWN HOURS 0 0 2,604
- 7. HOURS GENERATOR ON LINE 99 6,182 44,371
- 8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 318.590 20,530.423 143.955.675 i
- 10. GROSS ELECTRICAL ENERGY GENERATED (ElH) 107.246 6,940. % 2 48.007.155
- 11. NET ELECTRICAL ENERGY GENERATED (HWH) 98.013 6,633,582 45.800,775 i
- 12. REACTOR SERVICE FACTOR 13.4 85.1 82.5
- 13. REACTOR AVAILABILITY FACTOR 13.4 85.1 87.3
- 14. UNIT SERVICE FACTOR 13.3 84.5 81.4
- 15. UNIT AVAILABILITY FACTOR 13.3 84.5 81.4
- 16. UNIT CAPACITY FACTOR (USING HDC) 11.4 78.8 73.0
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 11.4 78.8 73.0
- 18. UNIT FORCED OUTAGE RATE 0.0 7.4 4.9
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
Refueling outage began on October 5.1996 with an estimated duration of 44 days.
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP: 11/16/96
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION: 900813
Attachment to TXX %504 *
- Page 2 of 8 .
l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50 445 UNIT: CPSES 1 l
DATE: 11/ 8/%
COMPLETED BY: Mark Samuel TELEPHONE: 817 897 5793 MONTH: OCTOBER 1996 i
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL l DAY (MWe Net) DAY (MWe Net) ,
1 1084 17 0 7 2 1067 18 0 l
l 3 1062 19 0 l 4 1034 20 0 i
! 5 3 21 0 i
l 6 0 22 0 7 0 23 0 i 8 0 24 0 i i'
9 0 25 0 10 0 26 0 l l
l 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 i ,
i f
l l
l l
l
I
~
Attachment to TXX 96504 l Page 3 of 8 i l
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.: 50 445 ,
l !
UNIT: CPSES 1 i DATE: 11/ 8/%
- COMPLETED BY
- Mark Samuel TELEPHONE: 817 897 5793 MONTH: OCTOBER 1996 DAY TIME REMARK / MODE 10/01 0000 Unit started the month at 100t powcr. ;
1 0630 Unit began end of cycle coastdown in preparation for refueling l outage IRF05.
l l
10/04 2200 Unit began ramping down power level for start of refueling outage. i 10/05 0253 Tripped main turbine: unit began IRF05.
t 0255 Unit entered Mode 2.
0340 Unit entered Mode 3.
2131 Unit entered Mode 4.
10/06 1013 Unit entered Mode 5. l 10/10 0416 Unit entered Mode 6.
i l
10/31 2400 Unit ended the month in Mode 6: refueling outage 1RF05.
l l
i
~
Attachment to TXX-%504
~ Page 4 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-445 UNIT: CPSES 1 DATE: 11/ 8/%
COMPLETED BY: Mark Samuel ,
TELEPHONE: 817-897-5793 REPORT MONTH: OCTOBER 1996 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS /COPMENTS 9 % 1005 S 646.1 C 1 Refueling outage (IRF05) began.
- 1) REASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AM) LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: Alff0MATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
. . . . ---.. . - - - - . . . - . . - - . _ . . . . - . - . . . . ~. -..~ -. - .
Attachment t@ TXX %504
- Page 5 of 8 i
. . COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2
$ NRC MONTHLY OPERATING REPORT DOCKET NO.: 50 446 4 UNIT: CPSES 2
)
DATE: 11/ 8/96
- COMPLETED BY: Mark Samuel .
TELEPHONE: 817 897-5793 !
i -
i OPERATING STATUS
- 1. REPORTING PERIOD: OCTOBER 1996 GROSS HOURS IN REPORTING PER00: 745
- 2. CURRENTLY AUTHORIZED POWER LEVEL (Wt): 3411 MAX. DEPEND. CAPACITY (We Net): 1150 * !
' DESIGN ELECTRICAL RATING (MWe Net): 1150
- 3. POWER LEVEL TO WICH RESTRICTED (IF ANY) (MWe Net): NONE i
4.' REASON FOR RESTRICTION (IF ANY):
THIS MONTH .YR TO DATE CUMULATIVE I l
! . 5. NUWER OF HOURS REACTOR WAS CRITICAL 722 5.473 23.017 ,
)
- 6. REACTOR RESERVE SHUTDOWN HOURS 0 0 2,229 1 l
- 37. HOURS GENERATOR ON LINE 714 5,448 22.770 i
- 8. UNIT RESERVE SHUTDOWN HOURS 0 0 0-l
- 9. GROSS THERMAL ENERGY GENERATED (WH) 2.353,%1 17,755,164 73,318.074 l
4
- 10. GROSS ELECTRICAL ENERGY GENERATED (MW) 800,730 5,989.393 24,694,014 1
- 11. NET ELECTRICAL ENERGY GENERATED (MO 766.674 5,734,679 23,593.037
- 12. REACTOR SERVICE FACTOR 97.0 74.8 80.9 1
- 13. REACTOR AVAILABILITY FACTOR 97.0 74.8 88.7
- 14. UNIT SERVICE FACTOR 95.8 74.4 80.0
- 15. -UNIT AVAILABILITY FACTOR 95.8 74.4 80.0
- 16. UNIT CAPACITY FACTOR (USING HDC) 89.5 68.1 72.1
.17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 89.5 68.1 72.1
- 18. ' UNIT FORCED OUTAGE RATE 4.2 9.8 7.9 ,
i
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): j i
- 20. IF SHUTDOWN AT END OF REPORTING PERI 00. ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMERCIAL OPERATION: 930803
_ _ - _ _ - , _ . . _ _ _ __ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ . . . _ _.. _ . . . . _ _ . . . . . . _ _ m._
. Atfac,hment to.TXX %504 Page 6 of 8 1
j AVERAGE DAILY UNIT POWER LEVEL i"
1 DOCKET NO.: 50 446 UNIT: CPSES 2
, DATE: 11/ 8/96 l COMPLETED BY: Mark Samuel TELEPHONE: 817 898 5793 )
MONTH: OCTOBER 1996
-AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL l DAY (We Net) DAY (We Net) i i 1084 1 17 '.117 2 1115 18 123- I
} 3 1115 19 166 4 1109 20 939 l s
5 1112 21 1116 1
I
- 6 1113' 22 1117.
i ,
7 1113 23 1117 >
8 1114 24 1117 9 1114 25 1119 !
i ,
1 10 1114 26 1119 l 1
. 11 1108 27 1119 I
i 12' 572 28 1119 .,
13 1085 29 1119
]
! 14 1116 30 1120 1
4 l 15 1116 31 1121 l 16- 1117 4
i I
- - - - - - - ,. - - - - - ~ , , , , , - e,,
Attachment ts TXX %504 -
. Pa@e 7 of 8 .
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.: 50 446 UNIT: CPSES 2 DATE: 11/ 8/%
COMPLETED BY: Mark Samuel TELEPHONE: 817 897 5793
, MONTH: OCTOBER 1996 l
l DAY TIME REMARK / MODE 10/01 0000 Unit started the month at 100* power. ,
i 10/11 2200 Commenced downpower to troubleshoot Main Feedwater (MFW) pump 2A oscillations. Unit power maintained ~at 50% level.
10/12 2000 Replaced the pilot valve servo (controls) associated with the main feedwater pump. Commenced power ramp up following rework.
l 10/13 0525 Unit achieved 100* power.
10/18 0306 Reactor tripped due to the loss of Reactor Coolant Pump 2 03 as a result of lock out on non safeguards bus 2A3.
10/19 0118 Unit entered Mode 2.
0844 Unit entered Mode 1.
l l
1007 Unit Synchronized to the grid. Initiated power ramp up.
, 10/20 1300 Unit achieved 100% power.
l l
l l 10/31 2400 Unit ended the month at 100t power.
l 4
-r.- ,
Attachment to TXX-%504 .
Page 8 of 8 ,
UNIT SHUTDOWIS AE POER REDUCTIONS ,
~
DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 11/ 8/% ,
COMPLETED BY: Mark Samuel TELEPHONE: 817-897-5793 REPORT MONTH- OCTOBER 1996 EIN0D OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON PIDUCING POWER CORRECTIVE ACTIONS / COP 9ENTS 10 % 1011 S B 4 Reduced unit power level to 50t to troubleshoot Main Feedwater (MFW) pump 2A oscillations. See previous page.
11 % 1018 F 31.0 H 3 Lock out on non-safeguards bus 2A3 caused the Reactor Coolant Pump 2-03 to de-energize resulting in automatic reactor trip.
Reference:
LER 446/% 007.
- 1) REASON 2) ETH00 A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING APO LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESlRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)