l M'
Log # TXX-96516
--""" 7 File # 10010.2
~_
Ref. # 10CFR50.36 1
M1ELECTR/C' December 13, 1996 C. Lance Terry Gmup Mce PresrJent U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446 MONTHLY OPERATING REPORT FOR NOVEMBER 1996 Gentlemen:
Attached is the Monthly Operating Report for November 1996, prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the Comanche Peak Steam Electric Station Units 1 and 2.
Operating License Nos. NPF 87 and NPF 89, respectively. Should you have j
any questions, please contact Jacob M. Kulangara at (817) 897 0124.
i Sincerely, j
l C. L. Terry By:
i D. R. Woodlan Docket Licensing Manager i
JMK/jmk Attachment cc:
Mr. L. J. Callan, Region IV Mr. J. I. Tapia, Region IV Hr. T. J. Polich, NRR
(
Resident Inspectors h/
/
\\
\\
9612180172 961130 PDR -ADOCK 05000445 R
PDR 4
P. O. Box 1002 Glen Rcme Tesas 76043
Attachment to TXX %516 Page 1 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC HONTHLY OPERATING REPORT DOCKET NO.:
50 445 UNIT:
CPSES 1 DATE:
12/11/96 COMPLETED BY:
MARK SAMUEL TELEPHONE:
897-5793 OPERATING STATUS 1.
REPORTING PERIOD:
NOVEMBER 1996 GROSS HOURS IM REPORTING PER00:
720 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
3411 MAX. DEPEND. CAPACITY (MWe Net):
1150 DESIGN ELECTRICAL RATING (MWe Net):
1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):
NONE 4.
REASON FOR RESTRICTION (IF ANY):
THIS HONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 372 6,599 45,350 6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 2,604 7.
HOURS GENERATOR ON LINE 339 6,521 44,710 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERGY GENERATED (MWH) 957,662 21,488,085 144,913,338 l
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 319,506 7,260,458 48,326,661 1
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 294,453 6,928,035 46,095,228
- 12. REACTOR SERVICE FACTOR 51.7 82,1 82.1
- 13. REACTOR AVAILABILITY FACTOR 51.7 82.1 86.8
- 14. UNIT SERVICE FACTOR 47.0 81.1 80.9
- 15. UNIT AVAILABILITY FACTOR 47.0 81.1 80.9 l
- 16. UNIT CAPACITY FACTOR (USING MDC) 35.6 74.9 72.6 l
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 35.6 74.9 72.6
- 18. UNIT FORCED OUTAGE RATE 0.0 7.0 4.8
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 900813 ESTIMATED
i i Attachment t@ TXX %516 Page 2 of 8 AVERAGE DAILY UNIT POWER LEVEL 3
DOCKET NO.:
50 445
^
UNIT:
CPSES 1
DATE:
12/11/ %
COMPLETED BY:
MARK SAMUEL j.
TELEPHONE:
817/897 5793 MONTH:
NOVEMER 19%
j AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (We Net)
DAY
-(MWe Net) 1 0
17 194 l
'2 0
18 265 i
{
3 0
19 5%
l
'4 0
20 859 5
0 21 861 6
0 22 991 1
]
7 0
23 1115 8
0 24 1114 1
9 0
25 1114 i
10 0
26 1114 l
11 0
27 1114 i
12 0
28 1113 13 0
29 1117 i
14 0
30 1114 e
15 0
31 16 0
Attachment to TXX %516 Page 3 of 8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.:
50 445 UNIT:
CPSES 1
DATE:
12/11/ %
COMPLETED BY:
MARK SAMUEL TELEPHONE:
817/897 5793 I
MONTH:
NOVEMBER 1996 DAY TIME REMARK / MODE 11/01 0000 Unit began the month in MODE 6: refueling outage IRF05 continued.
11/03 0333 Unit entered MODE 5.
11/11 0636 Unit entered MODE 4.
11/12 2210 Unit entered MODE 3.
l 11/15 0929 Unit entered MODE 2.
l l
l 1137 Reactor critical.
r l
11/16 2046 Unit entered MODE 1.
2122 Unit synchronized main generator to the grid.
11/22 1810 Unit at 100t power.
11/30 2400 Unit ended the month at 100* power.
i l
)
4
Attachment to TXX-%516 Page 4 of 8 I
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-445 UNIT:
CPSES 1
DATE:
12/10/96.
COMPLETED BY:
Mark Samuel TELEPHONE:
817-897-5793 REPORT MONTH.
NOVEEER 1996 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION 1NE REACTOR OR NO DATE S:SCHFDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS /COMENTS 9
% 1101 S
381.4 C
1 Unit continued IRF05 Refueling Outage. Unit completed the outage and returned to power on 11/16/%. (See additional information on previous page).
1)
REASON 2)
ETH00 A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN) t
Attachment to TXX-%516 Page 5 pf 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC HONTHLY OPERATING REPORT DOCKET NO.:
50 446 UNIT:
CPSES 2 i
DATE:
12/11/96 COMPLETED BY:
MARK SAMUEL TELEPHONE:
817/897 5793 OPERATING STATUS 1.
REPORTING PERIOD:
NOVEMBER 19%
GROSS HOURS IN REPORTING PER00:
720 2.
CURRENTLY AUTHORIZED POWER LEVEL (HWt):
3411 MAX. DEPEND. CAPACITY (HWe Net):
1150 J
DESIGN ELECTRICAL RATING (HWe Net):
1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):
NONE 4.
REASON FOR RESTRICTION (IF ANY):
THIS HONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 720 6,193 23,737 6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 2.229 7.
HOURS GENERATOR ON LINE 720 6,168 23,490 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERHAL ENERGY GENERATED (HWH) 2.449,903 20.205.067 75,767,978
'10.
GROSS ELECTRICAL ENERGY GENERATED (HWH) 837,815 6.827,208 25.531,829
- 11. NET ELECTRICAL ENERGY GENERATED (HWH) 806,956 6,541,635 24.399,993
- 12. REACTOR SERVICE FACTOR 100.0 77.0 81.4
- 13. REACTOR AVAILABILITY FACTOR 100.0 77.0 89.0
- 14. UNIT SERVICE FACTOR 100.0 76.7 80.5 1;
UNIT AVAILABILITY FACTOR 100.0 76.7 80.5
- 16. UNIT CAPACITY FACTOR (USING HDC) 97.5 70.8 72.7
- 17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 97.5 70.8 72.7
- 18. UNIT FORCED OUTAGE RATE 0.0 8.8 7.7
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE, AND DURATION OF EACH):
NONE
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED C0HMERCIAL OPERATION 930803 ESTIMATED
Attachment to TXX %516 Page 6 of 8
]
AVERAGE DAILY UNIT POWER LEVEL
(
DOCKET NO.:
50 446 UNIT:
CPSES 2
DATE:
12/11/ %
COMPLETED BY:
MARK SAMUEL TELEPHONE:
817/897 2265 MONTH:
NOVEMBER 19%
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe Net)
DAY
-(MWe Net) 1 1118 17 1124 2
1122 18 1125 3
1124 19 1124 l
l 4
1122 20 1125 i
5 1122 21 1124 6
1122 22 1123
'7 1122 23 1124 8
1123 24 1123 9
1124 25 1123
)
10 1123 26 1124 i
l 11 1124 27 1123 12 1124 28 1125 13 1122 29 1118 14 1124 30 1054 15 1123 31 16 1123 L
4 f
- i Attachment to TXX 96516 i
Page 7 of 8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MCNTH DOCKET NO.:
50 446 UNIT:
CPSES 2
DATE:
12/11/96
)
COMPLETED BY:
MARK SAMUEL TELEPHONE:
817/897 5793
]
MONTH:
NOVEMBER 1996 DAY TIME REMARK / MODE 11/01 0000 Unit began the month at 100t power.
11/30 2400 Unit ended the month at 100t power.
I j
Attachment to TXX-%516 Page'8 of 8 9
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-446 UNIT:
CPSES 2
DATE:
.12/11/%
COMPLETED BY:
Mark Samuel TELEPHONE:
817-897-5793 i
REPORT MONTH.
NOVEEER 19%
METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR i
NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS /COMENTS
[
NONE NONE 1)
REASON 2)
METHOD A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADMINISTRATIVE' 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN) v P