Attachme'nt to TXX-98243 Pa,ge 1 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKET NO.
50-445 UNIT:
CPSES 1 DATE:
11/ 9/98 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 OPERATING STATUS 1.
REPORTING PERIOD:
OCTOBER 1998 GROSS HOURS IN REPORTING PERIOD:
745 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt):
3411 MAX, DEPEND CAPACITY (MWe-Net).
1150 DESIGN ELECTRICAL RATING (MWe-Net):
1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
NONE 4
REASON FOR RESTRIC(ION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5
NUMBER OF HOURS REACTOR WAS CRITICAL 745 6,410 61.171 6
REACTOR RESERVE SHUTDOWN HOURS 0
0 2,632 7
HOURS GENERATOR ON LINE 745 6.385 60.495 6
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9 GROSS THERMAL ENERGY GENERATED (MWH) 2.532.029 21,474,062 198,253,846
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 848,644 7,195.465 66,267,425
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 814.091 6.888,029 63.290.341
- 12. REACTOR SERVICE FACTOR 100.0 87.8 84.9
- 13. REACTOR AVAILABILITY FACTOR 100.0 87.8 88.6
- 14. UNIT SERVICE FACTOR 100.0 87.5 84.0 1
- 15. UNIT AVAILABILITY FACTOR 100.0 87.5 84.0
- 16. UNIT CAPACITY FACTOR (USING MDC) 95.0 82.1 76.4
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 95.0 82.1 76.4
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 3.8
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
20.
IF SHUTDOWN A ~ END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP.
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 900813 98111b h6 81113 PDR ADOCK 05000445 R
pm
~.
~
AttachndnttoTXX-98243
- ~Page' 2 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO..
50-445 UNIT:
CPSES 1
l DATE:
11/ 9/98 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 MONTH:
OCTOBER 1998 l
l AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 1083 17 1097 2
1083 18 1096 L
3 1085 19 1098 4
1085 20 1098 5
1088 21 1098 6
1091 22 1099 7
1091 23 1083 l
8 1094 24 1053 9
1094 25 1100 l_
10 1095 26 1104 j
11 1094 27 1105 12 1093 28 1101 13 1093 29 1100 l-14 1089 30 1100 15 1091 31 1101 L
16 1093 I-i
+
Attachment to TXX- '98243 Pa;ge' 3 of.
8 t
SUMMARY
OF OPERAllNG EXPERIENCE FOR THE MONTH DOCKET NO.:
50-445 UNIT:
CPSES 1
DATE:
11/ 9/98 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 MONTH:
OCTOBER 1998 DAY TIME REMARK / MODE 10/01 0000 Unit began the month at 100% power'(1130 MWe Gross) 10/31 2400-Unit ended the month at 100% power (1147 MWe Gross) 1 i
l l-l l
i
Attacheant to TXX-98243 Page ;4, of 8-UNIT SHUTDOWNS AND PO' R REDUCTIONS 5
00CKFT NO..
50-445 UNIT:
CPSES 1
DATE:
11/ 9/98 COMPLETED BYi Bob Reible
-TELEPHONEi 254-897-0449 REPORT MONTH:
OCTOBER 1998 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS i
None None 1)
REASON 2)
METHOD A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL.
B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN) i I
i
~
' Attachment to TXX-98243 Pqge. 5 of.- 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO.
50-446 UNIT:
CPSES 2 DATE:
11/ 9/98 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 OPERATING STATUS 1.
REPORTING PERIOD:
OCTOBER 1998 GROSS HOURS IN REPORTING PERIOD:
745 2.
CURRENTLY AUTHORIZED FJWER LEVEL (MWt):
3411 MAX. DEPEND. CAPACITY (MWe-Net):
1150 l
DESIGN ELECTRICAL RATING (MWe-Net):
1150 3,
POWER LEVE' TO WHICH RtSTRICTED (IF ANY) (MWe-Net):
NONE 4'
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5
NUMBER OF HOURS REACTOR WAS CRITICAL 745 7,281 39,385 6
REACTOR RESERVE SHUTDOWN HOURS 0
15 2,326 7
HOURS GENERATOR ON LINE 745 7.277 39,066 8
UNIT RESERVE SHUTDOWN HOURS 0
0 0
i j
9 GROSS THERMAL ENERGY GENERATED (MWH) 2,532.718 23,774,719 126.880.605 l
10, GROSS ELECTRICAL ENERGY GENERATED (MWH) 859,456 8.031,898 42,833,210 1
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 826,306 7,710.650 41,001,431
- 12. REACTOR SERVICE FACTOR 100.0 99.8 85.7
- 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 90.7
- 14. UNIT SERVICE FACTOR 100.0 99.7 85.0
.15.
UNIT AVAILABILITY FACTOR 100.0 99.7 85.0
'16.
UNIT CAPACITY FACTOR (USING MDC) 96.4 91.9 77.5
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 96.4 91.9 77.5 18 ' UNIT FORCED OUTAGE RATE 0.0 0.3 4.8 l
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20.
IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
i
(
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 930803 l
ESTIMATED l
l,
' Attachment to TXX-'
98243 Page-6 -of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
50-446 UNIT:
CPSES 2
DATE:
11/ 9/98 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449
-HONTH:
OCTOBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 1099 17 1112 i
2 1101 18 1113 3
1101 19 1114 4
1102 20 1115 5-1104 21 1116 6
1109 22 1116 7
1109 23 1117 8
1109 24 1117 9
1105 25 1117 10
- 1063 26 1112 11 1110 27 1110 l
12 1110 28 1114 13 1109 29 1114 14 1114 30 1114 l '
15 1113 31 1114 16 1111 l
l t
Attachment to TXX-98243
-Pa,ge 7 of 8
.9
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.,
50-446 UNIT:
CPSES 2
DATE:
11/ 9/98 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449
. MONTH:
OCTOBER 1998 DAY TIME REMARK / MODE 10/01 0000 Unit began the month at 100% reactor power (1143 MWe Gross) 10/31 2400 Unit ended the month at 100% reactor power.(1158 hde Gross) 1 1
)
)
l i
ll l
l t
CSCH s M._ Cio M -
LtL4J Page 8 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-446 UNIT:
CPSES 2
DATE:
11/ 9/98 COMPLETED BY:
Bob Reible TELEPHONE:
254-897-0449 REPORT MONTH: -
OCTOBER 1998 METHOD OF TYPE SHUTTING DOWH F: FORCED DURATION THE REACTOR OR NO DALE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS None None 1)
REASON 2)
METHOD A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN) o
-