Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2
ML20195F316
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/31/1998
From: Reible B
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20195F301 List:
References
NUDOCS 9811190236
Download: ML20195F316 (8)


Text

Attachme'nt to TXX-98243 Pa,ge 1 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKET NO. 50-445 UNIT: CPSES 1 DATE: 11/ 9/98 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 OPERATING STATUS

1. REPORTING PERIOD: OCTOBER 1998 GROSS HOURS IN REPORTING PERIOD: 745
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX, DEPEND CAPACITY (MWe-Net). 1150
  • DESIGN ELECTRICAL RATING (MWe-Net): 1150
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): NONE 4 REASON FOR RESTRIC(ION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE 5 NUMBER OF HOURS REACTOR WAS CRITICAL 745 6,410 61.171 6 REACTOR RESERVE SHUTDOWN HOURS 0 0 2,632 7 HOURS GENERATOR ON LINE 745 6.385 60.495 6 UNIT RESERVE SHUTDOWN HOURS 0 0 0 9 GROSS THERMAL ENERGY GENERATED (MWH) 2.532.029 21,474,062 198,253,846

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 848,644 7,195.465 66,267,425
11. NET ELECTRICAL ENERGY GENERATED (MWH) 814.091 6.888,029 63.290.341
12. REACTOR SERVICE FACTOR 100.0 87.8 84.9
13. REACTOR AVAILABILITY FACTOR 100.0 87.8 88.6
14. UNIT SERVICE FACTOR 100.0 87.5 84.0 1
15. UNIT AVAILABILITY FACTOR 100.0 87.5 84.0
16. UNIT CAPACITY FACTOR (USING MDC) 95.0 82.1 76.4
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 95.0 82.1 76.4
18. UNIT FORCED OUTAGE RATE 0.0 0.0 3.8 )
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
20. IF SHUTDOWN A ~ END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP.
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION 900813 98111b h6 81113 "

PDR ADOCK 05000445 R pm

.. . . ~. . . . . . . - - ~ ..

AttachndnttoTXX- 98243

~Page' 2 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.. 50-445 UNIT
CPSES 1 l DATE: 11/ 9/98 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 MONTH: OCTOBER 1998 l

l AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net) 1 1083 17 1097 2 1083 18 1096 L

3 1085 19 1098 4 1085 20 1098 5 1088 21 1098 6 1091 22 1099 7 1091 23 1083 l 8 1094 24 1053 9 1094 25 1100 10 1095 26 1104 j l_

11 1094 27 1105 12 1093 28 1101 13 1093 29 1100 l- 14 1089 30 1100 15 1091 31 1101 L 16 1093 I-i

+

Attachment to TXX- '98243 Pa;ge' 3 of. 8 t

SUMMARY

OF OPERAllNG EXPERIENCE FOR THE MONTH DOCKET NO.: 50-445 UNIT: CPSES 1 DATE: 11/ 9/98

, COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 MONTH: OCTOBER 1998 DAY TIME REMARK / MODE 10/01 0000 Unit began the month at 100% power'(1130 MWe Gross) 10/31 2400- Unit ended the month at 100% power (1147 MWe Gross) 1 i

l

. l l-l l

l l

i

Attacheant to TXX- 98243 Page ;4, of 8- .

UNIT SHUTDOWNS AND PO' 5 R REDUCTIONS ,

00CKFT NO.. 50-445 UNIT: CPSES 1 DATE: 11/ 9/98 '

COMPLETED BYi Bob Reible

-TELEPHONEi 254-897-0449 REPORT MONTH: OCTOBER 1998 METHOD OF ,

TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS i

None None

1) REASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL.  ;

B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN) i I

i

. _ ~ - -- .- . _ _ _ - - - . . - - _ . . . . . .. . _ - . - . . - . . . . . . - . -

' Attachment to TXX-98243 Pqge. 5 of.- 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO. 50-446 UNIT: CPSES 2 DATE: 11/ 9/98 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 OPERATING STATUS

1. REPORTING PERIOD: OCTOBER 1998 GROSS HOURS IN REPORTING PERIOD: 745
2. CURRENTLY AUTHORIZED FJWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150
  • l DESIGN ELECTRICAL RATING (MWe-Net): 1150 3, POWER LEVE' TO WHICH RtSTRICTED (IF ANY) (MWe-Net): NONE 4' REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE 5 NUMBER OF HOURS REACTOR WAS CRITICAL 745 7,281 39,385 6 REACTOR RESERVE SHUTDOWN HOURS 0 15 2,326 7 HOURS GENERATOR ON LINE 745 7.277 39,066 8 UNIT RESERVE SHUTDOWN HOURS 0 0 0 i j

9 GROSS THERMAL ENERGY GENERATED (MWH) 2,532.718 23,774,719 126.880.605 l 10, GROSS ELECTRICAL ENERGY GENERATED (MWH) 859,456 8.031,898 42,833,210 l 1

11. NET ELECTRICAL ENERGY GENERATED (MWH) 826,306 7,710.650 41,001,431
12. REACTOR SERVICE FACTOR 100.0 99.8 85.7
13. REACTOR AVAILABILITY FACTOR 100.0 100.0 90.7 l I
14. UNIT SERVICE FACTOR 100.0 99.7 85.0

.15. UNIT AVAILABILITY FACTOR 100.0 99.7 85.0

'16. UNIT CAPACITY FACTOR (USING MDC) 96.4 91.9 77.5

17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 96.4 91.9 77.5 18 ' UNIT FORCED OUTAGE RATE 0.0 0.3 4.8 l
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:

i

( 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATED l

l l,

' Attachment to TXX-' 98243 Page-6 -of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 11/ 9/98 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449

-HONTH: OCTOBER 1998 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-Net) DAY (MWe-Net) i 1 1099 17 1112 2 1101 18 1113 3 1101 19 1114 4 1102 20 1115 5- 1104 21 1116 6 1109 22 1116 7 1109 23 1117 8 1109 24 1117 9 1105 25 1117 10 :1063 26 1112 11 1110 27 1110 l

12 1110 28 1114 13 1109 29 1114 14 1114 30 1114 l '

15 1113 31 1114 16 1111 l

l t

Attachment to TXX- 98243

-Pa,ge 7 of 8

.9 *

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO., 50-446 ,

UNIT: CPSES 2  !

DATE: 11/ 9/98 )

COMPLETED BY: Bob Reible I TELEPHONE: 254-897-0449

. MONTH: OCTOBER 1998 DAY TIME REMARK / MODE 10/01 0000 Unit began the month at 100% reactor power (1143 MWe Gross) l l

10/31 2400 Unit ended the month at 100% reactor power.(1158 hde Gross) 1 l

.. 1

)

)

l I

l l

i ll l

l l

t

CSCH s M._ Cio M - LtL4J Page 8 of 8

  • UNIT SHUTDOWNS AND POWER REDUCTIONS .

DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 11/ 9/98 COMPLETED BY: Bob Reible TELEPHONE: 254-897-0449 REPORT MONTH: - OCTOBER 1998 METHOD OF TYPE SHUTTING DOWH F: FORCED DURATION THE REACTOR OR NO DALE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS None None

1) REASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN) o