. ~ _
- 4tW4nwnl b IRX ffA2(p g /}g
' W. =
Peviu.)
wjie(97 COMANCHE PEAK STEAM ELECTRIC ST ATION, UNIT 2 b, g; NRC MONTHLY OPERATING REPORT DOCKET NO.:
50446 UNIT:
CPSES 2 DATE:
918.17 COMPLETED BY:
Bob Reible TELEPHONE:
254 8974449 OPERATING STATUS 1.
REPORTING PERIOD:
AUGUST 1997
' GROSS HOURS IN REPORTING PER00:
744 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth 3411 MAX. DEPEND CAPACITY (MWe Noth 1150 l
DESIGN ELECTRICAL RATING IMWe Neth 1150 3
j
. 3.
POWER LEVEL TO WHICH RESTRICTED OF ANY)(MWe Neth NONE 4.
REASON FOR idSTRICT10N OF ANY):
e THIS MONTH YR TO DATE CUMULATIVE 4
5.
. NUMBER OF HOURS REACTOR WAS CRITICAL 744 5.749 30,230 6.
REACTOR RESERVE SHUTDOWN HOURS 0
82 2.311 i
7.
HOURS GENERATOR ON LINE 744 5.728 29,962 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
1 4
9.
GROSS THERMAL ENERGY GENERATED (MWH) 2,536.238 18,966,446 97.250,073 P
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 850.680 6,428,140 32.820.240 11.
NET ELECTRICAL ENERGY GENERATED (MWH) 817,440 6.172,460 31,401.191 12.
REACTOR SEHVICE FAC' TOR 100.0 98.6 84.6 1
13.
REACTOR AVAILABILITY FACTOR 100.0 100.0 91.0 14.
UNIT SERVICE FACTOR -
100.0 98.2 83.8 15.
UNIT AVAILABILITY FACTOR 100.0 98.2 83.8 16.
UNIT CAPACITY FACTOR (USING MDC) 95.5 92.0 76.4
[
- 17. : UNIT CAPACITY. TACTOR IUSING DESIGN MWe) 95.5 92.0 76.4 I
18.
UNIT FORCED OUTAGE RATE 0.0 0.0 6.1 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHSITYPE. DATE. AND DURATION OF EACHh 20.
IF SHUT 00WN AT END OF SF.PORTMG PER100. ESTIMATED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)-
ACHIEVED COMMERCIAL 0PERATION 030803 ESTIMATED 9710290252 971024 PDR ADOCK 05000445 R
PDR.
L
44Ic/4ws[Y 774 -474;?/.,
ag
,,. Atteehment te-UN-9M91 k V'5td N lo[po[9y A
b had CDMANCE PEAK STEAM ELECTRIC STATION, UNIT 2 (Aqd letC lomt.Y OPERATING REPORT
@"-f-.
DOCKET NO.:
50 446 UNIT:
CPSES 2 DATE:
9/ 8/97 COMPLETED BY:
Bob Reible TELEPHOE:
254 897 0449 OPERATING STATUS 1.
REPORTING PERIOD:
AUGUST 1997 GROSS HOLRS IN REPORTING PER00:
744 2.
CURRENTLY AUTHORIZED POER LEVEL (Wt):
3411 MAX. DEPElc. CAPACITY (We Net):
1150 DESIGN ELECTRICAL RATING (We Net):
1150 3.
POWER LEVEL TO WHICH RESTRILTED (IF ANY) (We Net):
NONE 4.
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR 1D DATE CUMULATIVE N
(Sg 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 744 6.
REACTOR RESERVE SHUTDOW HOURS 0
82 2.311 744 MJ
( 29.218_]
7.
HOURS GENERATOR ON LIE N
8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERGY GEERATED (M)
(z576 238) h4.542.0ici) h.825.637) h f_32.098.350)
- 10. GROSS ELECTRICAL ENERGY GEERATED (M)
N 850.680 N 817.440
[5.483.134 J (30.711.865]
- 11. NET ELECTRICAL ENERGY GENERATED (M)
- 12. REACTOR SERVICE FACTOR M 100.0 h
- 13. REACTOR AVAILABILITY FACTOR
\\100.0 N 100.0
/ 90_.8/
- 14. UNIT SERVICE FACTOR
" 100.0 M
- 15. UNIT AVAILABILITY FACTOR h 100.0 M
- 16. UNIT CAPACITY FACTOR (USING M)C)
\\ 95.5
[93.7 }
}76.3j
- 17. yNIT CAPACITY FACTOR (USING DESIGN We) 95.5 M
l 76.3]
j
~
\\
- 18. UNIT FORCED OUTAGE RATE 0.0 N 0.0
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 NONTHS (TYPE. DATE. AND DURATION OF EACH):
20.
IF SHtm)CWN AT END OF REPORTING PERICO. ES) MATED DATE OF STARTUP:
21.
UNITS IN TEST STATUS (PRIOR TO CDP 9tERCIAL OPERATION):
ACHIEVED COP 9ERCIAL OPERATION 930803 ESTIMATED}