. ~ _

- 4tW4nwnl b IRX ffA2(p g /}g

' W. =

Peviu.)

wjie(97 COMANCHE PEAK STEAM ELECTRIC ST ATION, UNIT 2 b, g; NRC MONTHLY OPERATING REPORT DOCKET NO.:

50446 UNIT:

CPSES 2 DATE:

918.17 COMPLETED BY:

Bob Reible TELEPHONE:

254 8974449 OPERATING STATUS 1.

REPORTING PERIOD:

AUGUST 1997

' GROSS HOURS IN REPORTING PER00:

744 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWth 3411 MAX. DEPEND CAPACITY (MWe Noth 1150 l

DESIGN ELECTRICAL RATING IMWe Neth 1150 3

j

. 3.

POWER LEVEL TO WHICH RESTRICTED OF ANY)(MWe Neth NONE 4.

REASON FOR idSTRICT10N OF ANY):

e THIS MONTH YR TO DATE CUMULATIVE 4

5.

. NUMBER OF HOURS REACTOR WAS CRITICAL 744 5.749 30,230 6.

REACTOR RESERVE SHUTDOWN HOURS 0

82 2.311 i

7.

HOURS GENERATOR ON LINE 744 5.728 29,962 8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

1 4

9.

GROSS THERMAL ENERGY GENERATED (MWH) 2,536.238 18,966,446 97.250,073 P

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 850.680 6,428,140 32.820.240 11.

NET ELECTRICAL ENERGY GENERATED (MWH) 817,440 6.172,460 31,401.191 12.

REACTOR SEHVICE FAC' TOR 100.0 98.6 84.6 1

13.

REACTOR AVAILABILITY FACTOR 100.0 100.0 91.0 14.

UNIT SERVICE FACTOR -

100.0 98.2 83.8 15.

UNIT AVAILABILITY FACTOR 100.0 98.2 83.8 16.

UNIT CAPACITY FACTOR (USING MDC) 95.5 92.0 76.4

[

17. : UNIT CAPACITY. TACTOR IUSING DESIGN MWe) 95.5 92.0 76.4 I

18.

UNIT FORCED OUTAGE RATE 0.0 0.0 6.1 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHSITYPE. DATE. AND DURATION OF EACHh 20.

IF SHUT 00WN AT END OF SF.PORTMG PER100. ESTIMATED DATE OF STARTUP:

21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)-

ACHIEVED COMMERCIAL 0PERATION 030803 ESTIMATED 9710290252 971024 PDR ADOCK 05000445 R

PDR.

L

44Ic/4ws[Y 774 -474;?/.,

ag

,,. Atteehment te-UN-9M91 k V'5td N lo[po[9y A

b had CDMANCE PEAK STEAM ELECTRIC STATION, UNIT 2 (Aqd letC lomt.Y OPERATING REPORT

@"-f-.

DOCKET NO.:

50 446 UNIT:

CPSES 2 DATE:

9/ 8/97 COMPLETED BY:

Bob Reible TELEPHOE:

254 897 0449 OPERATING STATUS 1.

REPORTING PERIOD:

AUGUST 1997 GROSS HOLRS IN REPORTING PER00:

744 2.

CURRENTLY AUTHORIZED POER LEVEL (Wt):

3411 MAX. DEPElc. CAPACITY (We Net):

1150 DESIGN ELECTRICAL RATING (We Net):

1150 3.

POWER LEVEL TO WHICH RESTRILTED (IF ANY) (We Net):

NONE 4.

REASON FOR RESTRICTION (IF ANY):

THIS MONTH YR 1D DATE CUMULATIVE N

(Sg 5.

NUMBER OF HOURS REACTOR WAS CRITICAL 744 6.

REACTOR RESERVE SHUTDOW HOURS 0

82 2.311 744 MJ

( 29.218_]

7.

HOURS GENERATOR ON LIE N

8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERMAL ENERGY GEERATED (M)

(z576 238) h4.542.0ici) h.825.637) h f_32.098.350)

10. GROSS ELECTRICAL ENERGY GEERATED (M)

N 850.680 N 817.440

[5.483.134 J (30.711.865]

11. NET ELECTRICAL ENERGY GENERATED (M)
12. REACTOR SERVICE FACTOR M 100.0 h
13. REACTOR AVAILABILITY FACTOR

\\100.0 N 100.0

/ 90_.8/

14. UNIT SERVICE FACTOR

" 100.0 M

15. UNIT AVAILABILITY FACTOR h 100.0 M
16. UNIT CAPACITY FACTOR (USING M)C)

\\ 95.5

[93.7 }

}76.3j

17. yNIT CAPACITY FACTOR (USING DESIGN We) 95.5 M

l 76.3]

j

~

\\

18. UNIT FORCED OUTAGE RATE 0.0 N 0.0
19. SHUTDOWNS SCHEDULED OVER NEXT 6 NONTHS (TYPE. DATE. AND DURATION OF EACH):

20.

IF SHtm)CWN AT END OF REPORTING PERICO. ES) MATED DATE OF STARTUP:

21.

UNITS IN TEST STATUS (PRIOR TO CDP 9tERCIAL OPERATION):

ACHIEVED COP 9ERCIAL OPERATION 930803 ESTIMATED}