TXX-9708, Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 2
ML20137X910
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/31/1997
From: John Marshall, Reible B, Terry C
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-97082, NUDOCS 9704220247
Download: ML20137X910 (9)


Text

_ __ _ _ _ - - . _ - _ . . - _ _ _ _ _ _ ._ .

, p*

== Log # TXX 97082 File # 10010.2 79 Ref. # 10CFR50.36

7UELECTR/C' April 15, 1997 C. Lance Terry Group Mce President U. S. Nuclear Regulatory Commission Document Control Desk Washington. DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50 445 AND 50 446 i MONTHLY OPERATING REPORT FOR MARCH 1997 Gentlemen:

~

Attached is the Monthly Operating Report for March 1997, prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in  !

Appendix A to the Comanche Peak Steam Electric Station Units 1 and 2, l Operating License Nos. NPF 87 and NPF 89, respectively. Should you have  !

any questions, please contact Jacob M. Kulangara at (817) 897 0124.

Sincerely, C. L. rry By:

J. S. Marshall Generic Licensing Manager JMK/jmk Attachment cc: Mr. E. W. Herschoff, Region IV Mr. J. I. Tapia. Region IV Mr. T. J. Polich, NRR Resident Inspectors 9704220247 970331  ?

\

PDR ADOCK 05000445! g

.R PDR ! \

IIIhh%I)lh P. O. Box 1002 Glen Rose Texas 76043

.J

- -- = - . _ . _ _

Attachment to TXX 97082 Page 1 00 8

. a COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1

,. . NRC HONTHLY OPERATING REPORT DOCKET NO.: 50 445 UNIT: CPSES 1 DATE: 4/8/97 COMPLETED BY: Bob Reible TELEPHONE: 817 897 0449 OPERATING STATUS

1. REPORTING PERIOD: MARCH 1997 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (HWt): 3411 MAX. DEPEND. CAPACITY (HWe Net): 1150
  • DESIGN ELECTRICAL RATING (HWe Net): 1150
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net): NONE
4. REASON FOR RESTRICTION (IF ANY):

THIS HONTH YR TO DATE CUHULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 744 2.160 48,254
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 2,604
7. HOURS GENERATOR ON LINE 744 2.160 47.614
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSd BIERHAl 'tNERGY GENERATED (HWH) 2.529.482 7.338.017' 154.787.468
10. GROSS ELECTRICAL ENERGY GFNERATED (HWH) 859,801 2,492,728 51.681.258 i
11. NET ELECTRICAL ENERGY GENERATED (HWH) 826.276 2.395.828 49,319,257
12. REACTOR SERVICE FACTOR 100.0 100.0 83.0
13. REACTOR AVAILABILITY FACTOR 100.0 100.0 87.5
14. UNIT SERVICE FACTOR 100.0 100.0 81.9
15. UNIT AVAILABILITY FACTOR 100.0 100.0 81.9

, 16. UNIT CAPACITY FACTOR (USING HDC) 96.6 96.5 73.8

17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 96.6 96.5 73.8
18. UNIT FORCED OUTAGE RATE 0.0 0.0 4.6
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE, AND DURATION OF EACH):

l 20. SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:

i

21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED t

i COMMERCIAL OPERATION : 900813

  • ESTIMATED l

Attachment to TXX.'7082 9

Page 2 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50 445 UNIT: CPSES 1 DATE: 4/8/97 COMPLETED BY: Bob Reible TELEPHONE: 817-897 0449 MONTH: MARCH 1997 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (HWe Net) DAY (HWe Net) 1 1115 17 1113 2 1114 18 1114 3 1115 19 1115 4 1114 20 1115 5 1114 21 1116 6 1115 22 1114 7 1115 23 1114 8 1115 24 1114 9 1115 25 1114 10 1115 26 1114 11 1114 27 1113 12 1114 28 1105 13 1113 29 1015 14 1113 30 1113 15 1112 31 1113 16 1113 i

l I

l Attachment to TXX 97082 l

> .Page 3 00 8 ,

i

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH I DOCKET NO.: 50 445 j UNIT: CPSES 1 i DATE: 4/8/97  !

COMPLETED BY: Bob Reible i l

TELEPHONE: 817 897-0449 MONTH: MARCH 1997 DAY TIME REMARK / MODE j 03/01 0000 Unit began the month at 100* power.  !

l i

03/31 2400 Unit ended the month at 1001 power.- -

l-l l

l 1

1 l

i l

s l

l l  !

i i

I - . - . . _ _ . . . . . _ - _ , ~ . _ . - , _ _ . . -

Attachment to TXX-97082 .

Page 4 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS .

DOCKET NO.: 50-445 UNIT: CPSES. 1 DATE: 4/8/97

  • COMPLETED BY: Bob Reible TELEPHONE. 817-897-0449 REPORT HONTH: MARCH 1997 METHOD OF  ;

TYPE SHUTTING DOWN  :

F: FORCED DURATION THE REACTOR OR  !

NO DATE. S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS /COINENTS i None I i

t

1) REASON 2) METHOD i

A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM l C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM i D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN) '

i l

t i

t i

I L

i i

Attachment to TXX 97082 l Page 5 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2

,. . NRC HONTHLY OPERATING REPORT DOCKET NO.: 50 446 UNIT: CPSES 2 DATE: 4/8/97 COMPLETED BY: Bob Reible l TELEPHONE: 817 897 0449 l OPERATING STATUS l 1

1. REPORTING PERIOD: MARCH 1997 GROSS HOURS IN REPORTING PERIOD: 744
2. 3411 1150
  • CURRENTLY AUTHORIZED POWER LEVEL (HWt): MAX. DEPEND. CAPACITY (HWe Net):

DESIGN ELECTRICAL RATING (HWe Net): 1150 1 l

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net): NONE  !
4. REASON FOR RESTRICTION (IF ANY):

THIS HONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 744 2.078 26.559
6. REACTOR RESERVE SHUTDOWN HOURS 0 82 2.311
7. 744 26,291 I HOURS GENERATOR ON LINE 2.057
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERHAL ENERGY GENERATED (HWH) 2.536.639 6.936.516 85,220.142
10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 868.282 2.370.574 28.762.674 i i
11. NET ELECTRICAL ENERGY GENERATED (HWH) 835.763 2.278.076 27.506.807 i 12. REACTOR SERVICE FACTOR 100.0 96.2 82.8 l
13. REACTOR AVAILABILITY FACTOR 100.0 100.0 90.0
14. UNIT SERVICE FACTOR 100.0 95.3 82.0
15. UNIT AVAILABILITY FACTOR 100.0 95.3 82.0
16. UNIT CAPACITY FACTOR (USING HDC) 97.7 91.7 74.6

'17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 97.7 91.7 74.6 1

18. UNIT FORCED OUTAGE RATE 0.0 0.0 6.9
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
20. IF SHUTDOWN AT END OF REPORTING PERI 00. ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION : 930803
  • ESTIMATED

. . . . _ . . . _ . . . _ _ _ . . _ . _ . . _ . ~ _ _ . . - _ . ..._____. __.__._. ___ _ _._ _ __ _ _ -

Attachment to TXX 97082

' Page,6 of 8 AVERAGE DAILY UNIT POWER LEVEL

l. .- -

DOCKET NO.: 50 446 ,

UNIT: CPSES 2 DATE: 4/8/97

, COMPLETED BY: Bob Reible TELEPHONE: 817 897 0449  :

HONTH: MARCH 1997 ,

l

~

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL-DAY (HWe Net) DAY (HWe Net) ,

i ,

! 1 1125 17 1123 l

2 1125 18 1123 3 1124 19 1122 4 1125 20 1119 .!

l 5 1124 21 1123 l

6 1125 22 1123 7 1125 23 1123

i 8 1125 24 1122 9 1125 25 1121 i

i 10 1125 26 1122

! 11- 1125 27 1122

, 12 1125 28 110.3 i l

13: 1125 29 1123

-14 1124 30 1123 15 1123 31 1123 i

16 1123 P

i i

i

'-w-w-t-------

=. .- )

, Attachment to TXX 97082 i Pa,ge,7 of 8 )

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH

i. ,. .

DOCKET NO.: 50 446 UNIT: CPSES 2

!' DATE: 4/8/97 COMPLETED BY: Bob Reible l TELEPHONE: 817 897-0449 l l 1 4 HONTH: MARCH 1997 l

} l 4

DAY TIME REMARK / MODE l i

03/01 0000 Unit began the month at 100t power.

! l 03/31- 2400 Unit ended the month at 100* power, l 1

i l 1

f J

j

~

}

l l

1 4

i 4

l ,

5 s

a w

-i -

i 1

I t

I' j

1

' Attachment to TXX-97082 ,

f Page 8 of 8 .  !

UNIT SHUTDOWNS AND POWER REDUCTIONS .

DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 4/8/97

  • COMPLETED BY: Bob Reible -

TELEPHONE: 817-897-0449  :

REPORT MONTH: MARCH 1997 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NC DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS i None

1) REASON 2) METHOD i

A: . EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMO RTION 1: MANLI?1 i B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM  !

C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM '!

D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN) i I

i 4 .

_ . . _ _ _ _ . _ _ _ . _ . _ _ _ . . _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ - . < - - - - nvv - e, . , , . . 4 < .-wi