Log # TXX 96482

==

File # 10010.2 1

4 7

Ref. # 10CFR50.36

_=

=__

October 15, 1996 7UELECTRIC C. lance Terry Group Vice Presided U. S. Nuclear Regulatory Commission Document Control Desk Washington. DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50 445 AND 50 446 MONTHLY OPERATING REPORT FOR SEPTEMBER 1996 Gentlemen-Attached is the Monthly Operating Report for September 1996, prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the Comanche Peak Steam Electric Station Units 1 and 2, Operating License Nos. NPF 87 and NPF 89, respectively.

Should you have any questions, please contact Jacob M. Kulangara at (817) 897 0124.

Sincerely, N.

C. L. Terry

/-

By:

M Roger"D'. Walker Regulatory Affairs Manager JMK/jmk Attachment cc:

Mr. L. J. Callan, Region IV Mr. J. I. Tapia, Region IV Mr. T. J. Polich, NRR Resident Inspectors 9610220371 960930

/

ADOCK0500g4

{]L (/

DR 2.?O103 P.O. Box 1002 Glen Rose. Texas 76043

Attachment to TXX 96482 Page 1 of 8 C0HANCHE PEAK STEAM ELECTRIC STATION UNIT 1 NRC HONTHLY OPERATING REPORT DOCKET NO.:

50 445 UNIT:

CPSES 1 DATE:

10/ 7/96 COMPLETED BY:

Mark Samuel TELEPHONE:

817 697-5793 OPERATING STATUS 4

1.

REPORTING PERIOD:

SEPTEMBER 1996 GROSS HOURS IN REPORTING PER00:

720 l

2.

CURRENTLY AUTHORIZED POWER LEVEL (HWt):

3411 MAX. DEPEND. CAPACITY (HWe Net):

1150 DESIGN ELECTRICAL RATING (HWe Net):

1150

.3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):

NONE 4

j 4.

REASON FOR RESTRICTION (IF ANY):

THIS HONTH YR TO DATE CUMULATIVE 5.

NUMBER OF HOURS REACTOR WAS CRITICAL 720 6.127 44,878 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 2.604 7.

HOURS GENERATOR ON LINE 720 6.083 44,272 8.

UNIT RESERVE SHUTD0'AN HOURS 0

0 0

9.

GROSS THERHAL ENERGY GENERATED (HWH) 2,449,157 20.211.833 143,637.085

10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 818.306 6.833,706 47.899.909
11. NET ELECTRICAL ENERGY GENERATED (HWH) 785.257 6.535.569 45.702.762
12. REACTOR SERVICE FACTOR 100.0 93.2 83.5
13. REACTOR AVAll>BILITY FACTOR 100.0 93.2 88.3
14. UNIT SERVICE FACTOR 100.0 92.5 82.3
15. UNIT AVAILABILITY FACTOR 100.0 92.5 82.3
16. UNIT CAPACITY FACTOR (USING HDC) 94.8 86.4 73.9
17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 94.8 86.4 73.9
18. UNIT FORCED OUTAGE RATE 0.0 7.5 4.9
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTliS (TYPE. DATE, AND DURATION OF EACH):

Rsfueling outage (1RF05) began on October 4.1996 with an estimated duration of 44 Days.

20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (FAIOR TO COMMERCIAL OPERATION):

ACHIEVED COMMERCIAL OPERATION:

900813 ESTIMATED

4 Attachment to TXX 96482 Page 2 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:

50 445 UNIT:

CPSES 1

DATE:

10/ 7/%

COMPLETED BY:

Mark Samuel TELEPHONE:

817 897 5793 MONTH:

SEPTEMER 1996 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe Net)

DAY (MWe Net) 1 1010 17 1092 2

1091 18 1093 3

1091 19 1093 4

1091 20 1095 5

1091 21 1097 6

1090 22 1098 7

1089 23 1097 8

1088 24 1098 9

1088 25 1101 10 1089 26 1098 11 1088 27 1100 12 1090 28 1102 13 1087 29 1102 14 1087 30 1102 15 1089 16 1092 l

i i

l 1

i Attachment to TXX 96482

. Page 3 of 8 f

SUMMARY

OF OPERATING D PERIENCE FOR THE MONTH l

I DOCKET NO.:

50 445 UNIT:

CPSES 1

DATE:

10/ 7/%

1 COMPLETED BY:

Mark Samuel TELEPHONE:

817 897 5793 MONTH:

SEPTEMBER 19%

(

DAY TIME REMARK / MODE 09/01 0000 Unit began the month at 801 power for performance of routine turbine stop and control valve testing.

1040 Unit returned to 1001 power.

d 09/30 2400 Unit ended the month at 100* power.

4 4

k 4

l i

}.

j i

e 1

1 1

3 R

w

-r-,.

.n.-,

. _ _.... ~.

~

Attachment to TXX-96482 Page 4 of 8 UNIT SHUTDOWNS AE POER REDUCTIONS DOCKET NO.:

50-445 UNIT:

CPSES 1

DATE:

10/ 7/%

COMPLETED BY:

Mark Samuel TELEPHONE:

817-897-5793 REPORT MONTH:

SEPTEEER 1996 l

ETHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS /C0194ENTS NONE 1)

REASON 2)

METHOD A:

EQUIPMENT FAILURE (EXPLAIN)

E:

OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:

MAINT OR TEST F:

ADMINISTRATIVE 2: MANUAL SCRAM C:

REFUELING G:

OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:

REGULATORY RESTRICTION H:

OTHER (EXPLAIN) 4: OTHER (EXPLAIN)

I t

. Attache *nt to TXX 96482 Page 5 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC HONTHLY OPERATING REPORT DOCKET NO.:

50 446 UNIT:

CPSES 2 DATE:

10/ 7/%

COMPLETED BY:

Mark Samuel TELEPHONE:

817 897 5793 OPERATING STATUS 1.

REPORTING PERIOD:

SEPTEMBER 19%

GROSS HOURS IN REPORTING PER00.

720 2,

CURRENTLY AUTHORIZED POWER LEVEL (HWt):

3411 MAX. DEPEND. CAPACITY (HWe Net):

1150 DESIGN ELECTRICAL RATING (HWe Net):

1150 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):

NONE j

4.

REASON FOR RESTRICTION (IF ANY):

THIS HONTH YR TO DATE CUMULATIVE 5.

NUMBER OF HOURS REACTOR WAS CRITICAL 685 4,775 22.319 i

6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 2,229 7.

HOURS GENERATOR ON LINE 655 4,734 22,056 j

8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

4 9.

GROSS THERHAL ENERGY GENERATED (HWH) 2,011,807 15,401.212 70,964.123

10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 671,025 5.188,663 23,893,284
11. NET ELECTRICAL ENERGY GENERATED (HWH) 638,507 4,968,005 22,826,363
12. REACTOR SERVICE FACTOR 95.1 72.6 80.5
13. REACTOR AVAILABILITY FACTOR 95.1 72.6 88.6
14. UNIT SERVICE FACTOR 90.9 72.0 79.6
15. UNIT AVAILABILITY FACTOR 90.9 72.0 79.6 i
16. UNIT CAPACITY FACTOR (USING HDC) 77.1 65.7 71.6
17. UNIT CAPACITY FACTOR (USING DESIGN HWe) 77.1 65.7 71.6
18. UNIT FORCED OUTAGE RATE 9.1 10.6 8.0 1
19. SHUTDOWNS SCHEDULED OVER NEXT 6 HONTHS (TYPE, DATE. AND DURATION OF EACH)-

l

20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARRIP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

ACHIEVED COMMERCIAL OPERATION:

930803 ESTIMATED

)

Attachment to TXX 96482 Page 6 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:

50 446 UNIT:

CPSES 2

DATE:

10/ 7/96 COMPLETED BY:

Mark Samuel TELEPHONE:

817 897 5793 HONTH:

SEPTEMBER 1996 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (HWe Net)

DAY (HWe Net) 1 1110 17 1105 2

1109 18 574 3

1109 19 0

4 1109 20 0

5 1108 21 175 6

1107 22 542 7

1106 23 516 8

1106 24 516 9

1105 25 516 10 1105 26 603 11 1105 27 1093 12 1105 28 1117 13 1103 29 1117 14 1104 30 1116 15 1104 16 1105

E.

4 Attachment to TXX %482 Page 7 of 8

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH 00CKET NO.:

50 446 UNIT:

CPSES 2

DATE:

10/ 7/%

COMPLETED BY:

Mark Samuel TELEPHONE:

817 897-5793 HONTH:

SEPTEMBER 1996 DAY TIME REMARX/H00E 09/01 0000 Unit started the month at 100% power.

09/18 1245 Unit tripped after a reactor coolant system instrument spike that resulted from a lightning strike. Unit entered Mode 3.

09/20 2257 Commenced reactor startup, 2351 Unit in Mode 2.

Reactor entered criticality.

09/21 0517 Unit entered Mode 1.

0608 Unit synchronized to the grid: unit began ramping up power.

09/22 0354 Unit held at 61t power due to high bearing temperature of Heater Drain Pump 2 02. Began overhaul of Heater Drain Pump 2-02.

1407 Reduced power to 56% due to Main Feedwater Pump 2 01 high bearing temperature. Power maintained at 56% to repair the bearing on the Main Feedwater Pump. Also during this time Turbine Plant Cooling Water Pump 2 02 was realigned to resolve high bearing temperature on this pump.

09/26 1650 Repairs completed on all pumps and initiated unit ramp up.

09/27 0553 Unit achieved 100% power.

09/30 2400 Unit ended the month at 100% power.

~ -.

Attachment to TXX-96482 Page 8 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

50-446 UNIT:

CPSES 2

DATE:

10/ 7/%

COMPLETED BY:

Mark Samuel TELEPHONE:

817-897-5793 REPORT MONTH:

SEPTE)BER 1996 METHOD OF TYPE SHUTTING DOW F: FORCED DURATION THE REACTOR OR

-NO DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER COPRECTIVE ACTIONS /COPMENTS 8

% 0918 F

65.4 H

3 Reactor tripped due to lightning strike causing reactor coolant system instrument spike.

Reference:

LER 446/%-006.

9

% 0922 F

A 4

While rasping up, held power at 611 due to Heater Drain Pump 2-02 high bearing temperature.

Reduced power level to 56% due to high bearing temperature on Main Feedwater Pump 2-01.

Continued the power ramp up after completing all the pump repairs.See previous page for additional details.

1)

REASON 2)

METHOD A:

EQUIPMENT FAILURE (EXPLAIN)

E:

OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:

MAINT OR TEST F:

ADMINISTRATIVE 2: MANUAL SCRAM C:

REFUELING G:

OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:

REGULATORY RESTRICTION H:

OTHER (EXPLAIN) 4: OTHER (EXPLAIN)

-