MONTHYEARML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20202H0431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Cpses,Units 1 & 2 ML20198N7141997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Cpses,Units 1 & 2 ML20197J0941997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for CPSES Units 1 & 2 ML20199D2261997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Cpses,Units 1 & 2 TXX-9721, Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station ML20212C4851997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for CPSES Unit 2 ML20210V2101997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CPSES ML20141J3911997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CPSES ML20149E2991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for CPSES TXX-9713, Monthly Operating Repts for May 1997 for CPSES1997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CPSES TXX-9710, Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station1997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station TXX-9708, Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 2 ML20137B9781997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for CPSES Units 1 & 2 ML20134Q2521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20137B9901997-01-31031 January 1997 Revised MOR for Jan 1997 CPSES Unit 2 ML20133M1971996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20132C1631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Comanche Peak Steam Electric Station TXX-9650, Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station1996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station ML20129F1601996-09-30030 September 1996 Revised Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20129B2401996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station ML20117N5201996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Comanche Peak Steam Electric Station ML20116N6651996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Comanche Peak Unit 1 & 2 TXX-9640, Monthly Operating Rept for June 1996 for Comanche Peak Electric Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Comanche Peak Electric Station TXX-9638, Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20112A1951996-04-30030 April 1996 Monthly Operating Repts for April 1996 for CPSES ML20101D0461996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Comanche Peak Steam Electric Station Units 1 & 2 TXX-9601, Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20101D0511996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Comanche Peak Steam Electric Station Unit 1 ML20096E7381995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Comanche Peak Steam Electric Station TXX-9530, Monthly Operating Repts for Nov 1995 for Comanche Peak Steam Electric Station1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Comanche Peak Steam Electric Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] |
Text
- - .- - -_
M lllllllll"" = Log # TXX 96002
.:' . File # 10010.2
=_ =_ Ref. # 10CFR50.36 illELECTRIC January 15, 1996
- c. i.ance Terry Gramp W e Prr.shlent U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) UNITS 1 AND 2 DOCKET NOS. 50 445 AND 50 446 MONTHLY OPERATING REPORT FOR DECEMBER 1995 Gentlemen:
Attached is the Monthly Operating Report for December 1995, prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the Comanche Peak Steam Electric Station Units 1 and 2, Operating License Nos. NPF 87 and NPF-89, respectively. Should you have any questions, please contact Jacob M. Kulangara at (214)812 8818.
Sincerely, C. L. Terry By: !
l U. S. Marshall Generic Licensing Manager JMK/jmk Attachment c Mr. L. J. Callan. Region IV ,
Mr. W. D. Johnson, Region IV Resident Inspector CPSES (1) i Mr. T. J. Polich, NRR l
NO R.
$NN N f / f Energy Plaza 1601 Bryan Street Dallas, Texas 75201 3411
,' Attachment to TXX.96002.
. Page ' l ' of 8 '
j COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1
NRC MONTHLY OPERATING REPORT .
1 DOCKET NO.: 50 445 UNIT: CPSES 1 l DATE: 1/.9/96 COMPLETED BY: Bob Reible .
TELEPHONE: 817 897 0449 OPERATING STATUS-
- 1. REPORTING PERIOD: DECEMBER 1995 GROSS HOURS IN REPORTING PERIOD: 744 1150 *
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 HAX. DEPEND. CAPACITY (MWe Net): ;
DESIGN ELECTRICAL RATING (We Net): 1150 ;
- 3. POWER LEVEL TO WICH RESTRICTED (IF ANY) (MWe Net): NONE f
- 4. REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE- CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 744 7,539 38,752
- 6. REACTOR RESERVE SHUTDOWN HOURS 0 164 2.604 7.- HOURS GENERATOR ON LINE 744 7,443 38,189
- 8. UNIT RESERVE SHUTDOW HOURS 0 0 0 ,
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 2,411,782 24,490,147 123,425,253 i
'10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 811,676 8,169,576 41.066.203 f
- 11. ' NET ELECTRICAL ENERGY GENERATED (MWH) 778,049 7,803,746 39.167,193
- 12. REACTOR SERVICE FACTOR 100.0 86.1 82.1
- 13. REACTOR AVAILA8ILITY FACTOR 100.0 87.9 87.6
- 14. UNIT SERVICE FACTOR 100.0 85.0 80.9
- 15. UNIT AVAILABILITY FACTUR 100.0 85.0 8') . 9
, 16. UNIT CAPACITY FACTOR (USING MDC) 90.9 77.5 72.2
- 17. UNIT CAFACITY FACTOR (USING DESIGN MWe) 90.9 77.5 72.2 18.- UNIT FORCED OUTAGE RATE 0.0 3.1 4.5
-19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
. 20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COM ERCIAL OPERATION): ACHIEVED
)
COMERCIAL OPERATION 900813
)
b j
+
Attachment to TXX 96002 Page 2 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50 445 UNIT: CPSES 1 DATE: 1/ 9/96 ;
COMPLETED BY: Bob Reible ,
TELEPHONE: 817 897 0449 MONTH: DECEMBER 1995 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY. (MWe-Net) DAY (MWe Net) 1 979 17 1113 2 491 18 1109 3 523 19 1108 4 552 20 1108 5 1048 21 1108 6 1109 22 1107 7 1108 23 1107 8 1108 24 1107 9 1107 25 1107 10 1109 26 1107
. 11 1109 27 1108 12 1109 28 1109 13 1110 29 1110 14 1110 30 1110 15 1109 31 1111 16 1109 t
l.
Attachment to TXX %002 Page 3 of_ 8 SUPNARY OF OPERATING EXPERIENCE FOR THE MONLi DOCKET NO.: 50 445 UNIT: CPSES 1 DATE: 1/ 9/96 COMPLETED BY: Bob Reible TELEPHONE: 817 897-0449 MONTH: DECEMBER 1995 DAY TIME REMARK / MODE 12/01 0000 Unit started month in MODE 1 at 100* power, 1300 Unit power level reduced to 53% to troubleshoot Main Feedwater Pump 1A vibrations.
12/04 1930 Main Feedwater Pump 1A bearings replaced: initiated power ascension.
12/05 1121 Unit returned to 100% power.
12/31 2400 Unit ended the month at 100% power.
l 1
j l
l l
l l
_m..m.._m__ - _ - . _ _ _ _ _ _ _ _ . - _ _
. - ~. . .- - .
f Attachment to TXX-%002 Fage 4 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-445 UNIT: CPSES 1 DATE: 1/ 9/%
COMPLETED BY: Bob Reible TELEPHONE: 817-897-0449 REPORT MONTH. DECEMBER 1995 METHOD OF TYPE SHUTTING DOWi <
F: FORCED DURATION THE REACTOR OR NO DATE 5: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS /C0letENTS 11 951201 F A 4 Reduction in power required to troubleshoot MFWP-1A vibrations. Replaced MFWP-1A bearings.
See previous page.
- 1) REASON 2) METil00 <
A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
. Attachment to TXX 96002 Page 5 of 8 COMANCHE PEAK STEAM ELECTRIC STATION.-UNIT 2 NRC MONTHLY OPERATING REPORT DOCKET NO.: 50 446 UNIT: CPSES 2 DATE: 1/ 9/96 COMPLETED BY: Bob Reible TELEPHONE: 817 897 0449 OPERATING STATUS
- 1. REPORTING PERIOD: DECEMBER 1995 GROSS HOURS IN REPORTING PERIOD: 744 1150 *
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe Net):
DESIGN ELECTRICAL RATING (MWe Net): 1150 3, POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net): NONE
- 4. REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUKJLATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL 669 8,427 17,544
- 6. REACTOR RESERVE SHlffDOWN HOURS 75 75 2,229
- 7. HOURS GENERATOR ON LINE 663 8,382 17,322
- 8. UWIT RESERVE SHUTDOWN HOURS 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWH) 2,115,914 28,262,985 55,562,911 10, GROSS ELECTRICAL ENERGY GENERATED (MWH) 717,201 9,548,566 18,704,621
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 685,402 9,163,402 17,858,358 12, REACTOR SERVICE FACTOR 89.9 96.2 82.0
- 13. REACTOR AVAILABILITY FACTOR 100.0 97.0 93.6
- 14. UNIT SERVICE FACTOR 89.1 95.7 82.0
- 15. UNIT AVAILABILITY FACTOR 89.1 95.7 82.0
- 16. UNIT CAPACITY FACTOR (USING MDC) 80.1 91.0 73.5
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 80.1 91.0 73.5
- 18. UNIT FORCED OUTAGE RATE 10.9 1.6 7.3
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
Refueling Outage scheduled to begin February 22, 1996 with an estimated duration of 42 days.
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): ACHIEVED COMMERCIAL OPERATION 930803
- _ .. . - . _ - . .= . - . . .
Attachment to TXX 96002-
. Page 6 of 8 AVERAGE DAILY LHIT POWER LEVEL DOCKET N0..: 50 446 UNIT: CPSES 2 DATE: 1/ 9/96 COMPLETED BY: Bob Reible TELEPHONE: 817 897 0449 MONTH: DECEMBER 1995 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe Net) DAY (MWe-Net) 1 1119 17 1125 2 1120 18 1122 3' 1120 19 1121 4 1120 20 1122 5 609 21 1121 6' 0 22 1121
-7 0 23 1123 8 0 24 1123 9 344 25 1123 10 436 26 1123 11 576 27 1123 12 917 28 1124 13 1112 29 1124 14 1113 30 1125 15 1120 31 1124 16 1120 l
1
Attachment to TXX 96002 Page - 7 of 8 StMIARY OF OPERATING EXPERIENCE FOR THE MONTH
~
DOCKET NO.: 50 446 UNIT: CPSES 2 DATE: 1/ 9/96
- COMPLETED BY: Bob Reible TELEPHONE: 817-897-0449 HONTH: DECEMBER 1995 DAY TIME REMARK / MODE 12/01 0000 Unit started month at 100% Power.
12/05 1311 Reactor Tripped on a Steam Generator 2 03 Lo-Lo Level due to Main 2
Feedwater Pump 2A speed oscillations.
12/08 1528 Repairs completed to Main Feedwater Pump 2A speed controller:
unit entered MODE 2.
1607 Reactor Critical.
2200 Entered MODE 1.
2211 Unit synchronized to the grid; began power ascersion.
12/09 1028 Unit held at 47% power to complete repairs on Main Feedwater Pump 2B speed controller.
12/12 0000 Resumed power ascension.
1800 Unit at 100% power.
l 12/31 2400 Unit ended month at 100% power. I I
l l
1 i
l
. _ _ _ __ .. . ~ . . _ . . _ . _ . . . . . - -
Attachment to TXX-96002 '
Page 8 of 8 .
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-446 UNIT: CPSES 2 DATE: 1/ 9/96 COMPLETED BY: Bob Reible TELEPHONE: 817-897-0449 REPORT MONTH: DECEMBER 1995 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS) REASON REDUCING PGWER CORRECTIVE ACTIONS /COPMENTS 6 951205 F 81.0 A 3 Reactor Tripped due to Lo-Lo level on steam generator 2-03. See previous page. Reference LER 2-95-004-00.
7 951209 F A 4 Held reactor power at 47% to complete repair on Main Feedwater Pump 28 speed controller.
- 1) REASON 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
.