.t mesumummmme Log # TXX 96460
==
File # 10010.2 P7 Ref. # 10CFR50.36
~-.
.~~
.=
=
7t# ELECTRIC September 13, 1996 C. Lance Terry Groq Vice Presidens U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50 445 AND 50 446 MONTHLY OPERATING REPORT FOR AUGUST 1996 Gentlemen:
Attached is the Monthly Operating Report for August 1996, prepared and submitted pursuant to Technical Specification 6.9.1.5 contained in Appendix A to the Comanche Peak Steam Electric Station Units 1 and 2, Operating License Nos. NPF 87 and NPF 89, respectively. Should you have any questions, please contact Jacob M. Kulangara at (817) 897 0124.
Sincerely, 6,4%
C. L. Terry By:
M
'W R6g'er V. Walker Regulatory Affairs Manager JMK/jmk Attachment cc:
Mr. L. J. Callan, Region IV Ms. J. I. Tapia, Region IV Mr. T. J. Polich, NRR Resident Inspectors e
J {- /
T' L
9609190247 960831
/
PDR ADOCK 05000445 i
g PDR P.O. Box 1002 Glen Rose, Texas 76043 1
l Attachment to TXX 96460 Page 1 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKET NO.:
50 445-UNIT:
CPSES 1 DATE:
9/ 6/%
COMPLETED BY:
Mark Samuel TELEPHONE:
817 897-5793 OPERATING STATUS 1.
REPORTING PERIOD:
AUGUST 19%
GROSS HOURS IN REPORTING PEROD:
744 I
2.
CURRENTLY AUTHORIZED POWER LEVEL ( Wt):
3411 MAX. DEPEND. CAPACITY (MWe Net):
1150
- DESIGN ELECTRICAL RATING (We Net):
1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net):
NONE 4.
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 727 5.407 44.158 6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 2.604 7.
HOURS GENERATOR ON LINE 719 5,363 43,552 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
l 9.
GROSS THERMAL ENERGY GENERATED (MWH) 2,324,479 17,762,676 141,187,929
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 767.641 6.015,400 47,081.603 4
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 732,670 5,750,312 44.917.505
- 12. REACTOR SERVICE FACTOR 97.7 92.3 83.2
- 13. REACTOR AVAILA8ILITY FACTOR 97.7 92.3 88.1
- 14. UNIT SERVICE FACTOR 96.7 91.6 82.1 1
- 15. UNIT AVAILABILITY FACTOR 96.7 91.6 82.1
- 16. UNIT CAPACITY FACTOR (USING MDC) 85.6 85.4 73.6
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 85.6 85.4 73.6
- 18. UNIT FORCED OUTAGE RATE 3.3 8.4 5.0
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):
Refueling Outage scheduled to begin October 4,19% with an estimated duration of 42 Days.
- 20. IF SHU190WN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 900813 ESTIMATED
Attachment'to TXX 96460 Page 2 of 8~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
50 445 UNIT:
CPSES 1
DATE:
9/ 6/96 COMPLETED BY:
Mark Samuel TELEPHONE:
817 897 5793 MONTH:
AUGUST 1996 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (We-Net)
DAY (We-Net)
-1 1085 17 1090 2
1084 18 1090 3
1084 19 1090 4
1084 20 1090 5
1085 21 1089 6
1086 22 1089 7
1086 23 1090 8
1085 24 1091 9
526 25 1090 10 38 26 1089 11 302 27 1089 i
12 755 28 1089 13 730 29 1090 14 988 30 1091 15 1084 31 1081 16 1088
_. ~. _ - - _ _. _ -. _. - - _ _ _. _. _
m M
- Attachment to TXX 96460 Page 3 of 8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.:
50 445 UNIT:
.CPSES 1
DATE:
9/ 6/96 COMPLETED BY:
Mark Samuel TELEPHONE:
817-897 5793 MONTH:
-AUGUST 1996 DAY TIME REMARK / MODE 08/01" 0000
. Unit began the month at 100% power.
08/09 1203 Reactor tripped due to a lightning strike causing N 16 instrument loop spike while N 16 loop 3 was out of service for Analog Channel Operational Test. Reactor entered Mode 3.
08/10 0515 Reactor critical: unit in Mode 2.
)
1223 Unit entered Mode 1.
1245 Unit synchronized to the grid.
08/12 1431 While unit at Et power level, manually tripped Heater Drain Pump 102 due to high inboard bearing temperature: reduced power to 70% by turbine runback.
08/14-0340 Heater Drain Pump 1-02 bearing replaced initiated action to ramp up power level to 100*.
08/15 1250 Unit achieved 100* power.
08/31
'2400 Unit ended the month at 801 power for routine turbine stop and control valve testing.
)
Attachment to TXX 96460 Page 4 of 8 UNIT SHUTDOWNS AM) POWER REDUCTIONS DOCKET NO.:
50 445 UNIT:
CPSES 1
DATE:
9/ f/95 COMPLETED BY:
Mark samuel TELEPHONE:
817-897-5793 REPORT MONTH.
AUGUST 1996 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS /C0m4ENTS 7
% 0809 F
24.70 H
3 Reactor tripped due to lightning strike causing N-16 instrument spike while N-16 loop 3 was down for testing.
(Reference-LER-1-%-007) 8 960812 F
A 4
During the ramp to 1001 Power, the Heater Drain Pump 1-02 was manually tripped due to high bearing temperature. The inboard bearing was replaced and the unit continued the ramp up to 1001 Power. (see previous page).
1)
REASON 2)
METHOD A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
~
Attachment to TXX 96460 Page 5 of 8 COMANCHE PEAK STEAM ELECTRIC STATION UNIT 2 NRC HONTHLY OPERATING REPORT DOCKET NO.:
50 446 UNIT:
CPSES 2 DATE:
9/ 6/96 COMPLETED BY:
Mark Samuel TELEPHONE:
817 897 5793 OPERATING STATUS 1.
REPORTING PERIOD:
AUGUST 1996 GROSS HOURS IN REPORTING PER0D:
744 2.
CURRENTLY AUTHORIZED POWER LEVEL (HWt):
3411 MAX. DEPEND. CAPACITY (MWe Net):
1150 DESIGN ELECTRICAL RATING (MWe Net):
1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (HWe Net):
NONE 4,
REASON FOR RESTRICTION (IF ANY):
j THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 744 4.090 21.634 i
6.
REACTOR RESERVE SHlITDOWN HOURS 0
0 2.229 l
7.
HOURS GENERATOR ON LINE 744 4.079 21.401 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERGY GENERATED (MWH) 2.532.626 13.389.405 68.952.316
- 10. GROSS ELECTRICAL ENERGY GENERATED (HWH) 854.521 4.517.638 23.222.259
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 821.059 4.329.498 22.187.856
- 12. REACTOR SERVICE FACTOR 100.0 69.8 80.2
- 13. REACTOR AVAILABILITY FACTOR 100.0 69.8 88.4
- 14. UNIT SERVICE FACTOR 100.0 69.7 79.3
- 15. UNIT AVAILABILITY FACTOR 100.0 69.7 79.3
- 16. UNIT CAPACITY FACTOR (USING MDC) 96.0 64.3 71.5
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 96.0 64.3 71.5
- 18. UNIT FORCED OLITAGE RATE 0.0 10.9 8.0
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
NONE
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD. ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 930803 ESTIMATED
Attachment to TXX-96460 Pa9e 6 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO :
50 446 UNIT:
CPSES 2
DATE:
9/ 6/%
COMPLETED BY:
Mark Samuel TELEPHONE:
817 897 5793 MONTH:
AUGUST 1996 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY
( % Net)
DAY (MWe Net) 1 1102 17 1105 2
1101 18 1105 3
1101 19 1110 4
1102 20 1107 5
1103 21 1106 6
1104 22 1106 7
1104 23 1106 8
1105 24 1108 1
9 1104 25 1108 10 1105 26 1107 11 1107 27 1107 12 1106 28 1107 13 1106 29 1108 14 1105 30 1102 i
15 1106 31 1052 16 1106 l
l i
1
'~
\\
c I
-Attachment to TXX-96460 Page 7 of 8
SUMMARY
OF OPERATING EXPERI~NCE FOR THE MONTH DOCKET NO.:
50 446 UNIT:
CPSES 2
DATE:
9/ 6/96 COMPLETED BY:
Mark Samuel TELEPHONE:
817 897 5793 MONTH:
AUGUST 1996 DAY TIME REMARK / MODE 08/01 0000 Unit began the month at 100% Power.
08/31-2400 Unit ended the month at 1001 Power.
i l
i l
l l
l l
l l
l.
i
I 1
1 l
Attachment to TXX-96460 Page 8 of 8 l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-446 UNIT:
CPSES 2
DATE:
9/ 6/%
COMPLETED BY:
Mark Samuel TELEPHONE:
817-897-5793 REPORT MONTH-AUGUST 1996 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COP 9 TENTS NONE 1)
REASON 2)
METHOD A:
EQUIPMENT FAILURE (EXPLAIN)
E:
OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B:
MAINT OR TEST F:
ADMINISTRATIVE 2: MANUAL SCRAM C:
REFUELING G:
OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM D:
REGULATORY RESTRICTION H:
OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
-