Revised Monthly Operating Rept for Jan 1993 for Comanche Peak Steam Electric Station,Unit 1
ML20045H570
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 01/31/1993
From: Julie Hughes
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20045H567 List:
References
NUDOCS 9307200392
Download: ML20045H570 (1)


Text

. Attachment to' TXX 93261 j Page 9 of 14 j j

COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT REV.2 DOCKET NO: 50 4 UNIT: CPSES 1 DATE: July 14,1993 COMPLETED BY: Janet Hughes TELEPHONE: 817497-5331 OPERATING STATUS

1. Reporting Period: JANUARY 1993 Gross hours in reporting period: 141
2. Currently authorized power level (MWI): 3111 Max. depend. capacity (MWe-Net): 1150
  • Design Electrical Rating (MWe-Net): 1150
3. Power level to which restricted (if any) (MWe-Net): NONE 4, Reasons for restriction (if any):

TMS MONTH YRTO DATE CUMULATIVE ,

704.4 704.4 16,223

5. Number of hours reactor was critical 6.

39E 39.6 2.298.2 Reactor reserve shutdown hours 6888 6882 15,847.3

7. Hours generator on line 0 0
8. Unit reserve shutdown hours 1,950,103 1,950,103 40,245,930
9. Gross thermal energy generated (MWH) 667,267 667,267 16,302,432
10. Gross electrical energy generated (MWH) 633.961 633,961 15,476,337
11. Net electrical energy generated (MWH)
12. Reactor Service factor 94.7 94.7 74.9
13. Reactor availability factor 100.0 100.0 95.9
14. Unit service factor 92.6 92.6 73.2
15. Unit availability factor 92.6 92.6 73.2 74.1 74.1 62.1
16. Unit capacity factor (Using MDC) 74.1 74.1 62.1
17. Unit capacity factor (Using Design MWe)
18. Unit forced outage rate 7.4 7.4 7.9
19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
20. If shutdown at end of report period, estimated date of startup:
21. Units in test status (prior to commercial operation): ACHIEVED Commercial Operation 900813 JANUARY 1993 Estimated REVISION 2 9307200392 930715 fM PDR ADOCK 05000445 h R PDR y