Text
. Attachment to' TXX 93261 j
Page 9 of 14 j
j COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT REV.2 DOCKET NO:
50 4 UNIT:
CPSES 1 DATE:
July 14,1993 COMPLETED BY:
Janet Hughes TELEPHONE:
817497-5331 OPERATING STATUS 1.
Reporting Period: JANUARY 1993 Gross hours in reporting period:
141 2.
Currently authorized power level (MWI):
3111 Max. depend. capacity (MWe-Net): 1150 Design Electrical Rating (MWe-Net):
1150 3.
Power level to which restricted (if any) (MWe-Net):
NONE 4,
Reasons for restriction (if any):
TMS MONTH YRTO DATE CUMULATIVE 704.4 704.4 16,223 5.
Number of hours reactor was critical 39E 39.6 2.298.2 6.
Reactor reserve shutdown hours 6888 6882 15,847.3 7.
Hours generator on line 0
0 8.
Unit reserve shutdown hours 1,950,103 1,950,103 40,245,930 9.
Gross thermal energy generated (MWH) 667,267 667,267 16,302,432 10.
Gross electrical energy generated (MWH) 11.
Net electrical energy generated (MWH) 633.961 633,961 15,476,337 12.
Reactor Service factor 94.7 94.7 74.9 13.
Reactor availability factor 100.0 100.0 95.9 14.
Unit service factor 92.6 92.6 73.2 15.
Unit availability factor 92.6 92.6 73.2 74.1 74.1 62.1 16.
Unit capacity factor (Using MDC) 74.1 74.1 62.1 17.
Unit capacity factor (Using Design MWe) 7.4 7.4 7.9 18.
Unit forced outage rate 19.
Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
20.
If shutdown at end of report period, estimated date of startup:
21.
Units in test status (prior to commercial operation):
ACHIEVED Commercial Operation 900813 JANUARY 1993 Estimated REVISION 2 9307200392 930715 fM PDR ADOCK 05000445 h R