ML14223A602

From kanterella
Revision as of 18:31, 5 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary of Telephone Conference Call Held on December 18, 2013, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri)
ML14223A602
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/20/2014
From: Daily J
License Renewal Projects Branch 1
To:
Union Electric Co
CuadradoDeJesus S, 415-2946
References
TAC ME7708
Download: ML14223A602 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 20, 2014 LICENSEE: Union Electric Company (Ameren Missouri)

FACILITY: Callaway Plant, Unit 1

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 18, 2013, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND UNION ELECTRIC COMPANY (AMEREN MISSOURI),

CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE CALLAWAY PLANT UNIT 1, LICENSE RENEWAL APPLICATION (TAC. NO. ME7708)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on December 18, 2013, to discuss and clarify the applicants technical comment No. 41 on Callaways Safety Evaluation Report with Open Items. The discussion is also associated with Ameren Missouris responses to the staffs requests for additional information concerning the Callaway Plant Unit 1 license renewal application. The discussion is a followup to the telephone conference call held on November 26, 2013. provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant. A brief description on the status of the items is also included.

The applicant had an opportunity to comment on this summary.

/RA/

John W. Daily, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-483 Enclosures

1. List of Participants
2. List of Requests for Additional Information cc w/encls: ListServ

ML14223A602 *Concurred via e-mail OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR PM:RPB1:DLR NAME *YEdmonds JDaily YDiaz-Sanabria JDaily DATE 8/19/14 8/20/14 8/20/14 8/20/14

SUMMARY

OF TELEPHONE CONFERENCE CALL CALLAWAY PLANT, UNIT 1 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS December 18, 2013 PARTICIPANTS AFFILIATIONS Samuel Cuadrado de Jesús U.S. Nuclear Regulatory Commission (NRC)

James (Jim) Gavula NRC Dave Shafer Union Electric Company (Ameren Missouri)

Sarah Kovaleski Ameren Missouri Eric Blocher STARS Bruce Huhmann Ameren Missouri Ed Vaughn Ameren Missouri Andrew Burgess Ameren Missouri Jeremey Claunch Ameren Missouri Roger Reedy Reedy Engineering ENCLOSURE 1

SUMMARY

OF TELEPHONE CONFERENCE CALL CALLAWAY PLANT, UNIT 1 LICENSE RENEWAL APPLICATION December 18, 2013 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on December 18, 2013, to discuss and clarify the applicants technical comment on the Safety Evaluation Report with Open Items and associated response to requests for additional information (RAIs) concerning the Callaway license renewal application (LRA). This was a followup to the telephone conference call held on November 26, 2013.

Technical Comment No. 41: Flow-Accelerated Corrosion Program Discussion: The staff stated that based on additional internal agency discussions, Ameren Missouris use of a 10 percent increase in allowable stresses within Engineering Design Guide ME-013 for evaluations of wall thickness due to corrosion and erosion appeared to be inconsistent with the American Society of Mechanical Engineers Code.

The applicant stated that it now recognized its response to RAI B2.1.7-5a was not clear with respect to the 10 percent increase and proposed to supplement the RAI response to provide additional clarification.

Action: The applicant will supplement its response to RAI B2.1.7-5a.

ENCLOSURE 2

SUBJECT:

Summary of Telephone Conference Call conducted on December 18, 2013 DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource JDaily SCuadrado FLyons YDiaz GPick (RIV)