ML13046A306

From kanterella
Jump to navigation Jump to search

Response to RAI Set #21 and Amendment 21 to the Callaway LRA
ML13046A306
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/14/2013
From: McLachlan M A
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC ME7708, ULNRC-05957
Download: ML13046A306 (4)


Text

WAmeren MISSOURI Callaway Plant :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::

February 14, 2013 ULNRC-05957 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

10 CFR 2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 RESPONSE TO RAI SET #21AND AMENDMENT 21 TO THE CALLAWAY LRA

References:

1) ULNRC-05830 dated December 15,2011 2) NRC Letter, "Request for Additional Information for the Review of the Callaway Plant, Unit 1 License Renewal Application, Set 21 (T AC No. M£7708)," dated January 30, 2013 By the Reference 1letter, Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. Reference 2 dated January 30, 2013 transmitted the twenty-first Request for Additional Information (RAI) related to our application.

Enclosure 1 contains Ameren Missouri's responses to the individual requests contained in the January 30,2013 RAI. Enclosure 2 contains LRA Amendment 21 to reflect changes made as a result of the RAI responses.

If you have any questions with regard to these RAI responses, or Amendment 21, please contact me at (573) 544-8272 or Ms. Sarah Kovaleski at (314) 225-1134.

PO Box 620 Fulton, MD 65251 AmerenMissouri.com ULNRC-05957 February 14, 2013 Page2 I declare under penalty of perjury that the foregoing is true and correct. Sincerely, Mark McLachlan Director, Systems Engineering DS/SGK/nls

Enclosures:

1) Request for Additional Information (RAI) Set #21 Responses
2) Amendment 21, LRA Changes from RAI Responses ULNRC-05957 February 14, 2013 Page 3 cc: U.S. Nuclear Regulatory Commission (Original)

Attn: Document Control Desk Washington, DC 20555-0001 Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Samuel Cuadrado De Jesus Project Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Gregory A. Pick U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 ULNRC-05957 February 14, 2013 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the foUowing can be made via Tech Spec ULNRC Distribution:

A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle J. S. Geyer S. A. Maglio R. Holmes-Bobo NSRB Secretary L. H. Kanuckel G. S. Kremer S. G. Kovaleski T. B. Elwood G. G. Yates E. Blocher (STARS PAM COB) Mr. Mike Westman (WCNOC) Mr. Tim Hope (Luminant Power) Mr. Ron Barnes (APS) Mr. Tom Baldwin (PG&E) Mr. Mike Murray (STPNOC) Ms. Linda Conklin (SCE) Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP) Missouri Public Service Commission Mr. Dru Buntin (DNR)