WAmeren MISSOURI October 24, 2012 ULNRC-05920 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
10 CFR 2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF -30 Callaway Plant RESPONSES TO RAI SET #11 & #12 AND AMENDMENT 13 TO THE CALLA WAY LRA
References:
- 1) ULNRC-05830 dated December 15,2011 2) NRC Letter, "Request for Additional Information for the Review of the Callaway Plant, Unit 1 License Renewal Application, Set 11 (TAC No. ME7708)," dated September 20,2012. 3) NRC Letter, "Request for Additional Information for the Review of the Callaway Plant, Unit 1 License Renewal Application, Set 12 (TAC No. ME7708)," dated September 25,2012. By the Reference 1 letter, Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. Reference 2 dated September 20, 2012 and Reference 3 dated September 25, 2012 transmitted the eleventh and twelfth Requests for Additional Information (RAI) related to our application.
Enclosure 1 contains Ameren Missouri's responses to the individual requests contained in the September 20,2012 and September 25,2012 RAis. Enclosure 2 contains LRA Amendment 13 to reflect changes made as a result of the RAI responses for Sets 11 and 12. **************************************************************************************************************************
..........................................................................................................................
..........................................................................................................................
PO Box 620 Fulton, MO 65251 AmerenMissouri.com ULNRC-05920 October 24, 2012 Page 2 It should be noted that changes to three (3) commitments (Items #3, #34, and #35) are reflected in Table A4-l (within Enclosure 2). Commitment
- 3 and LRA Section B2.1.4 (Boric Acid Corrosion)
LRA have been revised to reflect completion of Element 1, Element 4, and Element 7 enhancements.
If you have any questions with regard to these RAI responses, or Amendment 13, please contact me at (314) 954-4319 or Ms. Sarah Kovaleski at (314) 225-1134.
I declare under penalty of perjury that the foregoing is true and correct. Sincerely, Executed on: fk/o k Z<> f Z--
Gregory S. Kremer Manager, Engineering Programs DS/SGK/nls
Enclosures:
- 1) Request for Additional Information (RAI) Set #11 and #12 Responses
- 2) Amendment 13, LRA Changes from RAI Responses ULNRC-05920 October 24, 2012 Page 3 cc: U.S. Nuclear Regulatory Commission (Original)
Attn: Document Control Desk Washington, DC 20555-0001 Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Samuel Cuadrado De Jesus Project Branch 1 Division of License Renewal Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Fred Lyon Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Gregory A. Pick U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 ULNRC-05920 October 24, 2012 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:
A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle J. S. Geyer S. A. Maglio R. Holmes-Bobo NSRB Secretary L. H. Kanuckel S. G. Kovaleski T. B. Elwood G. G. Yates E. Blocher (STARS PAM COB) Mr. Bill Muilenburg (WCNOC) Mr. Tim Hope (Luminant Power) Mr. Ron Barnes (APS) Mr. Tom Baldwin (PG&E) Mr. Mike Murray (STPNOC) Ms. Linda Conklin (SCE) Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP) Missouri Public Service Commission Mr. Dru Buntin (DNR)