ML17208A904

From kanterella
Revision as of 15:06, 4 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Jul 1980
ML17208A904
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 08/10/1980
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A903 List:
References
NUDOCS 8008180391
Download: ML17208A904 (15)


Text

AVERAGE DAILYUNIT POWER LEVEL DOCKET VO COMPLETED BY TELEPHONE Lllla=

h(ONTH JULY 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL (MWe.Net) (MWe->%et)

I 645 17 647 650 l8 652 654 20 654 647 655 646 653 642 13 651 570 24 649 442 95 646 IO 16 638 634 7't 640 2g l3 637 19 645 30 IS 640 l6 645 INSTRUCTIONS On this format, list the avera((c daily unit p>>wer!eve( in MWe.Net for each day in the rep<>rtintt n>>>nth. C>>>npute to the nearest whole megawat t.

('>r77 j 80081 8031/

OPERATING DATA REPOR'T DOCKET NO.

~1980 DATE hug COMPLETED BY TELEPHONE

~~son

~i~3824 OPERATING STATUS I. Unit Name Turke Point Unit No. 3 Notes-Unit No. 3 operated at

2. Reporting Period:

approzimately 100% R.P.,

3. Licensed Thermal Power (MWt):

ex'cept for outage of July 760 8-9, 1980.

4. Nameplate Rating (Gross a(We):
5. Design Electrical Rating (Net MWe): 693
6. Lblaximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power'Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, lf Any'his Month Yr. to-Date Cumulative I I. Hours In Reporting Period 67 112.6
12. Number Of Hours Reactor Was Critical 744. 51 505.2
13. Reactor Reserve Shutdown Hours 213.3
14. Hours Generator On-Line 737.0 4 071.6 49 761.7 IS. Unit Reserve Shutdown Hours 121.8

'6. Gross Thermal Energy Generated (MWH) 1 612 271 8 797 278 100 265 912

<'JL 31 852 845 47 164 30 148 198

19. Unit Service Factor 74.1
20. Unit Availability Factor 99.1 79.7 74.3 68.0
22. Unit Capacity Factor (Using DER Net) 64.8
23. Unit Forced Outage Rate 0.9 1.4 '.5
24. Shutdowns Scheduled Over Next 6 Months IType. Date. and Duration of Each I:

Steam Generator Tube Tnsoection Program Oct. 5 Hov. 1, 1980.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION I'>/77 )

UNIT SIIUTDOIVNS AND POPOVER REDUCTIONS REPOR.I h(ONTII JUI.Y 1980 COhlPLETED UY a~ 2- 2 L

o Q ~

t Llccf<sec Cause Sc Coffel:tive Nii.

4l 4J o u Dale ~ A Evc>>l ~ n Acliu>> to u

Repi)fl )< o Pieveol Rccuffcoce

~ <I) 80-07-08 7.0 N/A HOTORX Unit No. 3 was removed from service due to low oil level in reactor coolant pump motor -No. 38. Cor-rective actions included adding oil.

(Nuclear system) 3 4 I 'ofced Reasoo: hletl<od: Exl)ibil G - Instructions S; Sclicd<<led A-EII>>ipo<e>>t Failure (Explain) I-hlaoual lof I (cpafalloo ol Data U.hlaiote<uioce or Test ~ 2.hlaoual Scram. Eolry Sl)eels I'oi Liccosee

( -Rct'ucli>>I, 3-Auloo<at <c Serio)<. Event Repi)rl (I.ER) File (NURI!G-D.RCII>>lalo<y Rcslrlclloo 4-Otl<er (Lxplalo) OI6))

I: 0pcfalo< Tfalolog k. Llccosi: I:xJ>>ll>>JI<o>>

I'.Adioioislralive G.Operalio>>al Lrrur (lixplai<i) Ex l lib it I - Saute Source (I/77) I I.OII<cf (Expl J>><)

0 AVERAGE DAlLY UNIT POWER LEVEL DOCKET iVO. 50 251 Turkey. Point IUI!t .

TELEPHONE MONTH JULY 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL

!MWe Net) (i'e-Net )

I 640 642 649 l8 647 645 l9 647 644 20 647 644 2I 642 646 22 641 23 645 641 24 643 641 25 638 lp 641 631 636 629 633 28 629 l3 4 79 631 636 30 IS 635 31 591

!6 638 INSTRUCTIONS On this form>>a. list the average daily unit power!evel in MWe Net for each day i>> the reporting tnonth. Cot>>pote to the nearest whole ...egawat!.

(o lii)

OPERATING DATA REPORT DOCKET NO.

DATE 4~~~80 COMPLETED BY ~~hi3.son TELEPHONE ~05 552-382E OPERATING STATUS Turkev Point Unit No. 4 Notes- Unit No. 4 operated at I. Unit Name: approximately 100% R.P.,

2. Reporting Period: a except for load reduction
3. Licensed Thermai Power (MWt): of July 30-31, 1980.
4. iVameplate Rating (Gross iPIWe): 7 0 S. Design Electrical Rating (iVet MWe):
6. iiPIaximum Dependable Capacity (Gross SIWe):
7. maximum Dependable Capacity (Viet MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):

IO. Reasons For Restrictions, lf Any:

This Month Yr. to-Date Cumulative I I. Hours In Reporting Period 744. 0 5 111.0 60 840.0

12. Number Of Hours Reactor Was Critical 744.0 3 788.1 44 615.9 l3. Reactor Reserve Shutdown Hours 1 6.
14. Hours Generator On-Line IS. Unit Reserve Shutdown Hours 12.3 31.2 o 4 Ig. Net Electrical Energy Generated (MWH) 474 472 2 366 113 26 896 109 l9. Unit Service Factor
20. Unit Availability Factor 100.0 72.6 70.5
22. Unit Capacity Factor (Using DER Net) 6 .8
23. Unit Forced Outage Rate 0.4 3.0
4. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Re e in maintenance and inspections Nov. 9 1980 Jan. 10 1981.

25. If Shut Down At End Of Report Period. Estimated Date of Startup.'6.

Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (o j77)

I)OCKET NO.

UNIT SIIUTDO)VNS ANI) PO'iVER REI)UCTIONS REPORT hlONTII I

i CI o Cause Er. Corrective o .) Ltccnscc o 4l o ~

iVii. l)ate ~ A Event ~ A Action lo o Repiwt > I Icvcnt I(ecurlcncc o

~ C/l 80-07-30 B N/A HA VAI.VEX Load reduction to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves. (Non-nuclear system)

I 3 I': Forced Reason: Method: llxliibitG - Instructions S: Scbcdulcil A.l!quipu)ent Failure (Explain) I.hla>>ual I )r I ri'pJr Jlii)n ol Data B.hlaiiileiiance or Test . 2.hlanual Scram. I:))try Sliecls I'or l.icensee

( -Reflieliilg 3 Ault)IAJtiC SCrani. Evcol Report (LER) File (NUREG.

I) ltegiilaiory Rcslfti;lion 4.Oilier (llxplain) 016I )

I:.Operali)r Training k. Ltcciisc Exainiiialion I "Ad))III)IstralIvc G Operation Jl L'irI>r (Explain) I'xliibll I - Saine Source I'>/77) I I Oilier (Lxplaui)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT COMPLETED IIY <- T. Chilson MONTH JULY 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-iVet) (il(We.iVe t )

I 767 l7 790 733 l8 658 789 791 30 796 788 13 716 34 789 '75 793 IO 16 797 793 797 3S 7 6 l3 791 59 792 733 30 793 15 782 3l 795 l6 791 NOTE: Ave age daily power level greater than 777 NWe due to cooler condenser cooling water.

INSTRUCTIONS On this format. list the averaile daily unit power level in MWe.Net for each day tn the reportintt tnonth. Coittpute to the nearest whole ate(Iawat t.

'0 0 OPERATING DATA REPORT DOCKET NO.

DATE COMPLETED BY

~~80

~~~son TELEPHONE ~~~3824 OPERATING STATUS St. Lucie Unit No. 1 Notes - Unit operated at

l. Unit Name:

approxiataeely 100% R.P.,

2. Reporting Period: 'ezcept for load reduction
3. Licensed Thermal Power (MW:): 2560 850 of July 2-3, 1980.
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 2
6. tglaximum Dependable Capacity (Gross agWe): 822
7. Maximum Dependable Capacity (Net MWe): 777
8. If Changes Occur in Capacity Ratings (Items ltlumber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period '11.0 3I 655.0
12. Number Of Hours Reactor Was Critical 744.0 3 280.2 24 789.9
13. Reactor Reserve Shutdown Hours 129.5
14. Hours Generator On. Line 24 8.

IS. Unit Reserve Shutdown Hours 32.0 it. Grata Electrical Energy Generated (gtWH) 25 18 844 750

18. Net Electrical Energy Generated (MWH) 579 531 2 395 835 17 723 731
19. Unit Service Factor 100. 0 62.4 75.9
20. Unit Availability Factor 100.0 62.4 76.0
21. Unit Capacity Factor (Using MDC Net) 100.2 60.3 72.1
22. Unit Capacity Factor (Using DER Net) 58.4 69.8
23. Unit Forced Outage Rate 13. 2 6.5
24. Shutdowns Scheduled Over Next 6 i4Ionths(Type. Date, and Duration of ch) e
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

UNIT SIIUTI)0'IVNS AND POIVER RE!)(ICTIONS l)OCKET NO.

UNIT NAhIE St. Lucie 0 I . No.l r)

Llcc))sec Cause Ec Curreclive Ni). l)alc IA Event Action lo Q

Rcport > Prevent Recurrc>>ce 10 80-07-02 -G- N/A FILTER Load reduction Lo approximately 50% R.F . to clean condensate pun)p suction st:rainers.. (Non-nuclear system) 4 I': I o)ced Reason: hlelhod: I.xl)ibit G - Instructions S: Scl)cduled A-L'Iluipment Failure (Explain) I 4lanual II)r I rcpafall)nl ol Data It hlaintenance nr Test ~ 2 h4nual Sera)n. Lnlry Sl)cuts for Licensee C-Ref) li)t', 3 Au)on>atic Sera>>). Event Report (I.ER) File (NUR-l).)let,ulatory Restriction 4 Oll)cf (Lxplau)) EG f> I )

I .Opelalol' ran))l)g 8c License I:xan)u)i)lion

'F.Administrative G.Ot>erational E)rur (Expl>>in) Exl)ibil I - Sa)nc Source Il Oll)er t Explain)

P.O. BOX 5291GO,'IAiiII, FL 33152 FLOAIOA POWER 5 LIGHT COMPANY August 10, 1980 Office oz Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the July, 1980, Ope ating Summary Reports zor Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.

Very truly yours, A. D. Schmidt.

Vice President Power Resources VTC/DDC cc: Nr. James P. 0"Reilly Robert Lowenstein, Esquire PBOPLB... SBRVI'VG P"=C~LB

SUMMARY

OF OPERATiNG EXPERiENCE DOCKET NO '0 250 Turkey Point UNIT Unit No. 3 DATE August 10, 1980 COMPLETED BY V. T.. Chilson TELEPHONE (305) 552-3824 REPORT MONTH JULY, 1980 Unit No. 3 operated at approximately 100% R.P., except for outage of .

July 8-9, 1980. Refer to "Unit Shutdowns and Power Reductions" section of July, 1980, Operating Status Report =or additional infor-mation.

Major Sa ety-related maintenance activities performed during the month included:

inspections'nd reauirements of'E Bulletins and NUREG-0578 are'ontinuing.

Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

SUMMARY

OF OPERATlViG EXPERIENCE DOCKET NO. 50 251 Turkey Point UNIT Unit No. 4 DATE Au ust 10, 1980 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT i~!ONTH JULY, 1980 Unit, No. 4 operated at approximately 100% R.P., except for load reduction of July 30-31, 1980. Refer to "Unit. Shutdowns and Power Reductions" section of the July, 1980, Operating Status Report for additional infor-mation.

Major Safety-related maintenance activities performed during the month included:

inspections and requirements fo ZE Bulletins and NUREG-0578 in progress.

Florida, Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

SUMMARY

OF OPERATiNG EXPERiENCE DOCKET NO. 50 - 335 St. Lucie UNiT Unit No. 1 DATE A'u ust 10, .1980 COMPLETED BY V. T. Chilsc~n TELEPHONE (305) 552- 3824 REPORT MONTH JULY 1980 Unit operated at approximately 100% R.P., except for load rec;uction of July 2-3, 1980. Refer to "Unit Shutdowns and Power Reductioris" section of the July, 1980, Operating Status Report for additional inf'ormation.

Major Safety-related maintenance activities pe formed du ing the month included:

inspections and reauirements of iE Bulletins and NUREG-0578 are continuing.

Florida Power & Light Com.-.,any commitments for NUREG-0578 implementation are continuing: Refer to correspondence between FPL and NRC for ad-ditional information.

!