Forwards Joint Ebasco & C-E Task Force Engineering Verification Program Status Summary for 2-wk Period, 821122-1204
ML17213A904
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 12/09/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-130-SL-2, NUDOCS 8212170243
Download: ML17213A904 (11)


Text

REGULATORY l RMATION DISTRIBUTION SYS' (RIDS)

ACCESSION NBR: 8212170243 DOC ~ DATE: 82/12/09 NOTARIZED: NO DOCKET ¹ FACIL:50"389 St. Lucie Plantg Unit 2< Florida Power L Light Co ~ 05000389 AUTH ~ NAME AUTHOR AFFILIATION BLODGETT~T.H, Eba'sco Services~ Inc, (subs, of Enserch Corp.)

RECIP NAME RECIPIENT AFFILIATION EISENHUT~D.G. Division of Licensing S UBJECT: Forwar ds joint Ebasco 8 C E Task For ce engineer ing verification progt am status summary for 2 wk per iodi 821122 1204 0 N CODE: B001S

'ISTRIBUTI COPIES RECEIVED:LTR ENCL g SIZE:

TITLE: Licensing Submittal: PSAR/FSAR Amdts 8, Related Correspondence NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A/D LICENSNG 1 0 LIC BR ¹3 BC 1 0 LIC BR ¹3 LA '1 0 NERSESgV, 01 1 1

'NTERNAL: ELD/HDS2 1 0 IE. FILE 1 1 IE/DEP EPDS 35 1 1" IE/DEP/EPLB 36 3 3 NRR/DE/AEAB 1 0 NRR/DE/CEB 11 1 1 NRR/OE/EQB 13 2 2 NRR/DE/GB 28 2 2 NRR/DE/HGEB 30 1 1 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 24 1 NRR/DE/SEB 25 1 1 NRR/OHFS/HFEB40 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 34 1 1 NRR/DL/SSPB 1 0 NRR/OS I/AEB 26 1 NRR/DS I/CPB'0 1 1 NRR/DS I/CSB 09 1 1 NRR/DS I/ICSB 16 1 1 NRR/DSI/METB 12 1 1 NRR/DS I/PSB 19 1 1 N /D /RAB 22 1 NRR/DS I/RSB 23 1 1

04. 1 1 RGN2 3 RM/DOAMI/MlB 1 0 EXTERNAL: ACRS 41 6 6 ,,

BNL(AMDTS ONLY) 1, 1 DMB/DSS (AMOTS) 1 1 FEMA REP OIV 39 1 LPOR 03 1 1 NRC POR 02 1 1 NSIC 05 1 1 NTIS 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 52 ENCL 45

<<f ) '),)>>) g" ) f )

) I) fi )ri)<<f I," ) ) <<>> )

If

'r, I, l,g

'll>>y li I )') if)i I ) $ y) f) .))r J ] ~ q,r'r) I) lf f fl-I f<< J I ))<<

f)II) f << I),') f II

~ iy,f )

) )))+ ')

)f Iyf f ), lf)+)).I 'I

)I )

')fi)I)tl, )

I I

) I)I) I' yyl-f~", ')I')t g')F <fr ) i i il')rI<<<<))q )af )II >r I f .)r i)y t ll'.>> '

>'aIf<< l;1 ) l J. igY l )"'I '",:ll']'f,) ]if) l y>l.ll, I:) f)')ll)f)y>>ir )<) <<j ) ') 6,l f)y) f f'J f <<) )

J>>IV

)<<) c'>>r I')>>

I II

<<IA), t>>) '1fat, f ~ II fii)f p r<<

y f ".)

c.',f>>')

Il

)

h

'I li liIl

)'i) J IT<

l l

T,J il,'fg I>>'I) )(f))

JI 'l II IIl )')V lf lg i'fl)> )<.-

j][ f r f Ijf f. II;,i 'lii if lg

'I

>IX ) i')I), 3l l l . tf ,

I l Ilg r II i >

f'r ir">>11)

') rr

11) i .(

f f,)i~ i I 0r, Ir ")) '3 t<<)

I IIil >>I II<<"~>>-)"

)g,rjri i I'p)ryi X J'If)1,r<<l l

')

A'II I, )QJ,I

)N I" <')XI<,'<<X>>, Iy>> 'fprg(I.

'>>)XVyI .'<<")IXX i I <<<<' Q $ i <<" I, >>)

i il i

') l II II<<I'XlI<<y)%' I .iif ) l>>1) l, <'I>>>> )I,,

ri )l i

j)

If f $ Ally r,~ i "'I IFL ) lrriy" hrf Iii i

')'l 5 ) lrir.'<<l

'I ) 'I rf f

f) f 'Iii t QI << << Ir,,'

Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center-15th Floor New York, N. Y. 10048 December 9,1982 Ltr No. EVP-130/SL-2 Office of Nuclear Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr Eisenhut:

Re: ST. LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS SE'MARY FOR TWO-WEEK PERIOD NOVEMBER 22-DECEMBER 4,1982 Attached for your information is the Status Summary of the joint Ebasco and Combustion Engineering Task Force covering the two-week period November22 through December 4,1982. Both November 25 (Thanksgiving Day) and November 26 were observed as holidays in the Ebasco New York and C-E Windsor offices.

Very truly yours, T H Blodgett Joint Task Force Chairman THB/rob Attachment cc: Robert E Uhrig, FPL w/att D L Christian, FPL w/att 82i2i70243 821209 PDR ADOCK 05000389 R PDR

ENGINEERING VERIFICATION PROGRAM/SL-2

'EBASCO TASK FORCE STATUS

SUMMARY

FOR TWO-WEEK PERIOD NOVEMBER 22 DECEMBER 4,1982

l. During the holiday-shortened three-day work week (Nov 22 through nov 24) the following activities were in progress:
a. Started the electrical and IGC independent vs existing design comparisons for the interface with C-E Task Force re expansion of component boundaries for the HPSI Pump (Item 1) and SIT Isolation Valve (Item 2).
b. Completed preparing lists of documents required for field installation verification and start-up operation verification phases. Transmitted requests to Project Team.
c. Prepared comparison sheet forms to be used during the Site verification phases.
2. Site verification work started November 29 with the arrival at St.Lucie jobsite of ETF manager and four engineers. The remaining three ETF engineers involved in the site verification phases reported on November 30.
3. The following activities took place during the six-day period in Florida starting November 29:
a. Completed electrical and IGC independent vs existing design comparisons for interface items 1 and 2.and provided copies to the C-.E Task Force.
b. Obtained documents required to perform the field installation verification and start-up operation verification activities for items 3-8 plus C-E interface items 1 and 2.
c. Verified the field installations and prepared comparison sheets for record purposes. It was found that installation work in varying degrees remained to be completed for:

.Item 4 - Hydrogen Recombiner

.Item 6 Tornado Missile Shield Door

.Item 8 HEPA Filter for ECCS Area Ventilation System A total of nine UIRs resulted from this phase of the engineering verification program.

d. Verified the start-up testing operations completed to date and prepared comparison sheets for record purposes. Testing was noted to be incomplete for:

.Item 3 Cntrl Rm Emergency Cleanup System Valve

.Item 4 Hydrogen Recombiner

.Item 5 Area Radiation Monitor

.Item 8 HEPA Filter Two UIRs resulted from this phase of the program.

e. At the December 2 Review Committee Meeting, eight additional UIRs generated by the ETF during the design review phase of the program were presented to the Committee for resolution. Six of these UIRs resulted from the electrical and I6C design interface with C-E Task Force for items 1 and 2. All previous UIRs which were still open were also addressed.

'L 4

4. Following is overall status of the'56 UIRs prepared by the ETF during the three phases of the engineering verification 'program:
a. Total No. of UIRs

. Phase 1 45

. Phase 2 9-

. Phase 3 2 Total 56

b. UIRs addressed b Review Committee

. Phase 1 (Nov 17-18; Dec 2-3) 45

. Phase 2 0 Phase 3 0

'I Total 45 UIRs closed out (as of'Dec 4)

Phase,l 35

. Phase 2 0=

. Phase 3 0 Total 35

d. UIRs still o en (as of Dec 4)

Phase 1 10

. Phase 2 9

. Phase 3 2 Total 21

5. Concentrated efforts to close out all open UIRs as quickly as possible will be continued during the week of December 6.

~ C ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

C-E TASK FORCE NOVEMBER 29 DECEMBER 3 (INCLUDES PREVIOUS WEEK'S STATUS)

l. On-Site verification checklists were completed during the in preparation for the performance of installation and start-up phases.

previous'eek

2. Independent on-site verification of the field installation of EVP Items 1 and 2 (HPSI Pump and SIT Isolation Valve) was completed during this safety related deficiencies were found during our investigation. The report'eriod.

No Review Committee was notified of a single maintainability-related discrepancy.

3. Thr reactor containment was inaccessible until December 2 because of integrated leak rate baseline testing in progress. However, investigative work, during this period focused on Item 1 (located in the Auxiliary Building) and upon Task Force review of site documentation.

4.. Operational testing verification work was completed by December 3. All documents requested were made available by the St. Lucie Site Construction and Start-up Groups. Copies of hydraulic test data which were acquired on site were returned to C-E Windsor and will be evaluated and =compared with design requirements developed earlier in the program.

5. Program status and differences identified to date were discussed at Review Committee meetings held on December 2 and 3. Most of the design differences previously reported and held open from earlier Review Committee meetings have been successfully resolved at this point, but Project Team response is required on 2 differential. items related to the SIT Isolation Valve and one item related to the HPSI'ump.

g e EPHONE CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM - SL2 VEEKS OF ll 22/82 & 11 29 82 DATE OF PARTICIPATING GENERAL SUBJECT PREPARER OF TELECON ORGANIZATIONS OF TELECON TELECON RECORD Nov 22 Ebasco/FPL Inviting NRC to Dec 2 Ebasco EVP Task .

Review Committee Mtg; Force Mgr Administrative planning for on-site verification Nov 22 C-E/FPL 'dministrative planning C-E EVP Task for on-site verification Force Mgr phase Nov 23 FPL/C-E/Ebasco Administrative planning C-E EVP Task for on-site verification Force Mgr phase Note: No teleco s logged during on-site verificat'on phase wk og 11/29 vi>>'

'J eac