REGULATORNFOWT ION DISTRIBUTION '8OTEN OIDS)

"AOCBSS I ON NBR s 8209030220 DOG ~ DATE: 82/08/31 NOTARIZKD: NO DOCKET

,'FAGIL!50~389 'St, Lucie Plahti UniIt 2<,Florida Power 8 Light CoB 05000389

'AUTH NAME

~ AUTHOR AFFILIATION BLODGETT< T H ~ ~ Ebasco Services< Inc, (subs, of Enser ch '.Cor p,)

~RBC I.P ~ NAME RECLP lENT AFFILIATION EISENHUTgD G, ~ Division of Licensing

SUBJECT:

"Submits interim r ept rq Tengineering ver i,f i cation pr ogr ami in .response Ito 820817 requests Program i.ndependence

-pneserved~Ebasco 'L ~C E task .force members iscreened 'to prior involvement 'in ~ver ification matter s, insure'o DI'STRIBUTION CODE! '8001S <COPIES RECEIVED: LTR, ~ ENCL . / SIZE'

<<TITLE: Licensing "SUbmittals PSAR/FSAR Amdts 8, Related ~Correspondence NQTES:

RECIPIENT ~COPIES RKCIP IENT )COPIES

-ID CODE/NAME L,TTR ENCL ID >CODE/NAME L'ttTR ENCL A/D LICENSNG iQ LIC BR ¹3 ~BC iQ LZC BR ¹3 LA 1 0 NERSESpY ~ -01 1 INTERNALS ELD/HDS2 1 0 IE FILE 1 1 IE/DEP EPDS 35 1 1 =IE/DEP/EPLB I36 3

.NRR/DE/AEAB 1 0 NRR/DE/CEB 11 1 1 NRR/DE/EQB 3 '3 NRR/DE/GB 28 '2 2 NRR/DE/HGKB 2 '2 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/GAB 21 1 1 NRR/DE/SAB 24 1 NRR/DE/SEB 25 1 NRR/DHFS/HFIEBQQ 1 1 NRR/DHFS/L'QB 32 1 1 NRR/DHFS/OLB '34 1 1 NRR/DHFS/ipTRB20 1 1 NRR/DS I/AEB 26 1 1 NRR/DSI/ASB 27 ,1 NRR/DSI/OPB 10 1 1 NRR/DSI/CSB 09 1 1 NRR/DSI/ETSB 12 1 1 NRR/DSI/IOSB 16 1 1 NRR/DS I/PSB 19 1 NRR/DSI/RAB 22 1 1 N /RSB "23 1 1 NRR/DST/LGB 33 1 00 1 1 RGN2 '2 2 RM/DDAMI/MI 8 1 0

~BXT>KRNAL~ ACRS 41 10 10 BNL(AMDTS ONLY) 1 1 DMB/DSS (AMDTS) 1 1 FEMA~REP DIV 39 1 1 LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05. 1 1 NTIS 1 1

)TOTAL NUMBER .OF COPIES REQUIRED: LTTR 59 ENCL 53

~ ~ ~"

h, 1 yA I, PW hf

~ t IRtltt, ~

., ~

R' P 'Rr)RJ itl 1 I PRP f $

Rr P) II tg IrRrR "P Rtkk tlk P 9t1t 'r<<4 R t4) t~') '3r~f'j $ )~) r ,

Q>>" R klan rkrt)RP Rri tg l fr I-.,E Pk~l ERE RP I'"lgRP PIP g<R R ",iV llr

~ew ~~aaeesssrm 1k 1" la~ RE'0 ll R tl tk

.)' fkk I i ('l tDt I ~t 'ff"I Rk~',k",k ~ ~ I,EIQ P P r'.rR ll Ei

'P,(X'Ill 1,3rI k 7 tl IkR 4R J Nl fi' kk I,"Et hkifk )JR j'I R

~ E/pi t /'. R rii;

)I,.$ $  ;, ~'~<<<<t ll g II I Ilk lkk IE(ERR'g,il, I I tLI g) I kk I RR I I ll r Il Elk

',l, 'I I

"'il, II't)+E I ]-rt IRk m

I ,i ERR g I( "ll '- kk R,RRk j(

i II,' 'tt t I ($ E

] kIR>> L I Ir 0g p',) I R Rk

'>>'I li t flgi.l il~ I I lk,'lRR, RI';~" 'kR,' It" rIg I 'II It kk EE I ig'Y 4,

CllkikR

~'RIRR, tt >~g,lRR,Ek kk CR Rk tl

)

(,I fir tt,' IQ $ III II I

'k I I ko I 1

il r tl 'I

]ri R

'tl 4

o Engineering Verification Task Force

~ 0 Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N Y 10048 August 31, 1982 Ltr. No. EVP-110/SL-2 Office of Nuclear Reactor Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D C 20555

Dear Mr Eisenhut:

Re: ST LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM TASK FORCE INDEPENDENCE INTERIM REPORT Copies of your August 17, 1982 letter, "St Lucie Unit No. 2 Engineering Verification Program (EVP)," addressed to Mr Robert E Uhrig, Vice President of Florida Power & Light Company, have been forwarded to the Ebasco and Combustion Engineering Task Force Managers. This letter is in response to the second paragraph of your letter which requested an interim report of how the activities of the Task Force conducted to date have preserved the independence of the program.

1. The Ebasco and C-E Task Force members had no participation in the random selection by FPL of the items to be verified.
2. The Ebasco and C-E Task Force members performing the engineering verification have been screened by the respective Task Force managers to ensure no prior involvement in the design, installation or start-up testing of the items being verified. Resumes of Task Force members are on file and will remain as part of the program documentation.
3. The existing design is not available to the Task Force during preparation of the independent design. Review Committee's approval will be required as a prerequisite to receipt of the existing design for comparison.
4. The Ebasco and C-E Task Force members are located in special Task Force working areas physically separated from the respective St Lucie Project Teams.

~~ jjgpg3i ggp9030 gDOC +

pgppQSQ9'i

@gal pDR..

II Office of Nuclear Reactor Regulation August .31, 1982

a. The Ebasco Task .Force is located on .the 15th. floor of the Company's New York office., The. Pxoject Team is located on the 80th floor.
b. The C-E Task Force is located in three inter-connected office trailers adjacent to Building No, 24 at the Company's Windsor office. The Project Team is located in Building No. 4 approximately 1/4 mile away.
c. When Task Force members are temporarily relocated to the plant site for- the field installation verification or start-up operation'erification phases, appropriate arrangements will be made to maintain Task Force inde-pendence.
5. Ebasco and C-.E Task Force members are required to perform all home office verification work in the respective special Task Force working areas. This requirement covers those working on the program on a part-time basis as well as those working on a full-time basis.
6. Ebasco and C-E Task Force engineers are not permitted to communicate directly with the FPL, Ebasco or C-E .Project teams or with FPL Plant Operations on any. matters concerning the verification program. The respective Task Force managers are consulted when it is felt is a need to communicate, e.g. questions to be answered, requests there for. information/data, etc, and they determine the action to be taken.

Such communications are processed through the FPL, EVP Task Force Manager (who is functioning as the program coordinator) by the respective Task Force managers.

7. Outoging correspondence is controlled and signed by the respective Task Force managers. Incoming EVP-related correspondence is addressed to the -respective Task Force managers.
8. Documents received or generated by the Ebasco and C-E Task Forces axe controlled by means of special"filing systems established by the respective Task Force managers. Security measures include utilization of checkout cards, locked files, Authorized Access Personnel Lists for file access, and file custodian.

We have been advised by the FPL EVP Task Force Manager, Mr D L Christian, that the meeting suggested in the third paragraph of your letter has been scheduled for September 14,"in Bethesda.

Very truly yours, T H Blodgett Joint Task Force Chairman THG:mg cc: Robert E Uhrig, FPL D L Christian, FPL

~

pa i