ML17213A475
| ML17213A475 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 09/20/1982 |
| From: | Blodgett T EBASCO SERVICES, INC. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| EVP-114-SL-2, NUDOCS 8209240244 | |
| Download: ML17213A475 (10) | |
Text
1+4,j~
REGULATOR NFO T ION DISTRIBUTION S
'EM DS) 4 AGCESSION NBR:8209240244 DOC ~ DATE: 82/09/20 NOTARIZED:
NO FACIL:50 389 St ~ Lucie Planti Unit 2i Florida Power 8 Light Coo AUTHNAME AUTHOR AFFILIATION.
BLOOGETTrT ~
HE
Ebasco Servicesi Inc. (sub'f Enserch Corp,)
~RECIP ~ NAthE RECIPIENT AFFILIATION EISENHUTiD,G, Division of Licensing
SUBJECT:
Forwards Joint Ebasco 8
C E Task For ce engineering verification program weekly status summary for 820913-18.
DISTRIBUTION CODE: eooiS COPIES RECEIVED:LTR J ENCL
~
SIZE:
I TITLE: Licensing Submittal!
PSAR/FSAR Amdts 8 Related Correspondence NOTFS:
DOCKET 05000389 RECIP IENT ID CODE/NAPE A/0 LICENSNG LIC BR 03 LA INTERNAL+ ELD/HDS?-
IE/DEP EPDS 35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/OE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/OSI/AEB 26 ERR/DSI/CPB 10 NRR/DSI/ETSB 12 NRR/DSI/PSB 19 N
/RSB 23 FIL 04
/t IB EXTERh'AL:
ACRS 41 DMB/Dss (AMOTS)
LPDR 03 NSIC 05 COPIES LTTR ENCL 1
'0 1
0 1
0 1
1 1
0 3
3 2
2, 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1
-0 6
-6 1
1 1
1 1
'RECIPIENT ID CODE/NAME LIC BR P3 Bc NERSEsgV
~
Oi, IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 3?.
NRR/DHFS/PTRB20 NRR/OS I/ASB
?7 NRR/DS I/CSB 09 NRR/DSI/ICSB 16 NRR/DSI/RAB 22 NRR/DST/LGB 33 RGN2 BNL(AMDTS ONLY)
FEMA~REP DIY 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1
0 1
1 1
3 3
1 1
2
?
'1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
'?
2 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 55 Et<CL 49
<<II'<<qf} t (t,n T eg
~
I
<<jl 1 III I
'2
$ l I
}II }I ~
Ih
<O}ll" I'
X r(214<< },r c} li '1r
'1
'<<el'l '
,) f} I 141 f 1('} rhh>>
XX'<<,> l7 X}>h X
}le 4~ ail
}lI I'.(}'ll1 f I
'X' Ir<" f '
2( f n>), }) j
~ I X (1 ~
4 ~
1 r
1 X'h X
J riI <<}1(i I ghr I'
I,'<<}'I '}~) }(2 rj rjh'jr<<I}
~
J Z jX4}<<
4 '~ f '1 24 Tr(I I<<
'1fIl)}Ij X
'll
~<<
8 ~ SW I I 'li r<<4 tn 4 r (<<,((hrr 2 }(I
( Xlrljp, fc<<
Ijrk r<<$
rgl'
~
X (r<<I lj
<<rr$
4
',if Ir(2
[2, j(;il f',
i '
5 f.'
I } f X; X I X I }
,)'f 'j*),X
'<<lX li jl l
- )}
X TII
,Xh
<<X I
ii X 4 l Jt
}l, r<<
'XX XT
}X l
IE jj X'
(T\\
I(
I II I'
2 JL J
h, 4
Ii It I
<<rl rr<<k
, I I'I,
', lk jj,
'X "I
II lhh X
ll "Xl44XX}
'j i
(I Jh<,X i rp X
hj Jf, 44
<<i}
., IA 'll 3 I XA 1'l lt
'X}2
Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y. 10048 September 20,1982 Ltr No.
EVP -114/SL-2 Office of Nuclear Reactor Regulation Attention:
Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr Eisenhut:
Re:
ST.
LUCIE UNIT NO 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS
SUMMARY
FOR PERIOD SEPTEMBER 13 SEPTEMBER 18 1982 Attached for your information is the Weekly Status Summary of the Joint Ebasco and Combustion Engineering Task Force for the period September 13 through September 18, 1982.
Very truly yours, T H Blodgett Joint Task Force Chairman THB/rob Attachment cc:
Robert E Uhrig, FPL w/att D L Christian, FPL w/att 8209240244 BZiHZO PDR ADOCiC 05000389' R
~
~
~
Engineering Verification ProgramlSL2 C-E Task Force Meekly Status Summary September 13 - September 17
~ 0 A meeting was held with NRC on Tuesday, September 14, to discuss the independence of the EVP Task Force and its mode of operation.
The Safety Ingection Tank Isolation Valve independent design package was completed with the exception of minor. details awaiting receipt of additional design input.
3.
Status of the independent design packages was discussed during a Review Committee meeting held at the SL2 site'Thursday, Se tember 16. The P was re uested to b q
s e
o egin assembly of existing design information for comparison with the EVP design.
~
~
a
~ I li Engineering Verification Program/SL-2 Ebasco Task Force Weekly Status Summary For Period September 13 September 18, 1982 2.
On Septemher 14, the FPL, Ebasco and C-E EVP Task Force Managers met with the NRC in Bethesda,
- Maryland, and discussed the, engineering verification program, including the measures being followed,to ensure program independence.
A meeting summary is being prepared by the NRC.
The Hydrogen Recombiner.independent design package (Verification Item 4) was completed, and copies are undergoing review for completeness by Review Committee members.
Upon Review Committee approval, the existing design will be released for ETF comparison of designs 3.
The Main Steam Isolation Valve (Item 7), Control Room Emergency Clean-Up System Valve (Item 3),
and ECCS Area Ventilation System HEPA Filter (Item 8) independent design packages are all scheduled for completion during the coming period..As completed, copies will be forwar'ded to Review Committee members for approval to release existing designs for comparison.
4.
The Review Committee met at the 5obsite on September 16 to discuss completion of the first Ebasco and C-E independent designs and release of existing designs for comparison.
Copies of the Hydrogen Recombiner design package were distributed to the Review Committee, with a completion of review requested by September 21.
Written request has been made for'Project Team-to assemble existing design documents in advance of authorization to r'elease in order to minimize turnover time when Review Committee approval is granted.
I
0
~
~
TELEPltONE 'ONVERSATION LOG 0
ENGINEERING VERIFICATION PROGRAM SL2 0
VEEK OF DATE OF TELECON PARTICIPATING ORGANIZATIONS GENERAL SUBJECT OF TELECON PREPARER OF TELECON RECORD Sept, 13 Sept. 13 Sept.
13 Sept.
15 NRC/Ebasco FPL/C-E FPL/Ebasco C-E/FPL NRC meeting w/EVP Task Force Mgrs NRC meeting w/EVP Task Force Mgrs NRC meeting w/EVP Task Force Mgrs SI Tank Isolation Valve Ebasco EVP Task Force Mgr.
C-E EVP Task Force Mgr.
h Eba"co EVP Task Force Mgr.
C-E EVP Task Force Mgr.
~
~
~
~
4}