ML17213A475

From kanterella
Jump to navigation Jump to search
Forwards Joint Ebasco & C-E Task Force Engineering Verification Program Weekly Status Summary for 820913-18
ML17213A475
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/20/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-114-SL-2, NUDOCS 8209240244
Download: ML17213A475 (10)


Text

1+ 4,j~

REGULATOR NFO T ION DISTRIBUTION S 'EM DS) 4 AGCESSION NBR:8209240244 HE DOC ~ DATE: 82/09/20 NOTARIZED: NO DOCKET FACIL:50 389 St ~ Lucie Planti Unit 2i Florida Power 8 Light Coo 05000389 AUTHNAME AUTHOR AFFILIATION .

BLOOGETTrT ~

~RECIP ~ NAthE Ebasco Servicesi Inc.

RECIPIENT AFFILIATION (sub'f Enserch Corp,)

EISENHUTiD,G, Division of Licensing

SUBJECT:

Forwards Joint Ebasco 8 C E Task For ce engineering verification program weekly status summary for 820913-18.

DISTRIBUTION CODE: eooiS COPIES RECEIVED:LTR J ENCL ~ SIZE: I TITLE: Licensing Submittal! PSAR/FSAR Amdts 8 Related Correspondence NOTFS:

RECIP IENT COPIES 'RECIPIENT COPIES ID CODE/NAPE LTTR ENCL ID CODE/NAME LTTR ENCL A/0 LICENSNG 1 '0 LIC BR P3 Bc 1 0 LIC BR 03 LA 1 0 NERSEsgV ~ Oi, 1 INTERNAL+ ELD/HDS?- 1 0 IE FILE 1 1 IE/DEP EPDS 35 1 1 IE/DEP/EPLB 36 3 3 NRR/DE/AEAB ,

1 0 NRR/DE/CEB 11 1 1 NRR/DE/EQB 13 3 3 NRR/DE/GB 28 2  ?

NRR/DE/HGEB 30 2 2, NRR/DE/MEB 18 '1 1 NRR/DE/MTEB 17 1 1 NRR/DE/QAB 21 1 1 NRR/OE/SAB 24 1 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFEB40 1 NRR/DHFS/LQB 3?. 1 1 NRR/DHFS/OLB 34 1 NRR/DHFS/PTRB20 1 1 NRR/OSI/AEB 26 1 1 NRR/OS I/ASB ?7 1 1 ERR/DSI/CPB 10 1 1 NRR/DS I/CSB 09 1 1 NRR/DSI/ETSB 12 1 1 NRR/DSI/ICSB 16 1 1 NRR/DSI/PSB 19 1 1 NRR/DSI/RAB 22 1 1 N /RSB 23 1 1 NRR/DST/LGB 33 1 1 FIL 04 1 1 RGN2 '? 2

/t IB -0 EXTERh'AL: ACRS 41 6 -6 BNL(AMDTS ONLY)

DMB/Dss (AMOTS) 1 1 FEMA~REP DIY 39 LPDR 03 1 NRC PDR 02 NSIC 05 1 1 NTIS TOTAL NUMBER OF COPIES REQUIRED: LTTR 55 Et<CL 49

<O}ll" I' n>), }) j

<<II'<<qf} t },r c} '1r ~ I X (1 ~

'<<el'l '

X r(214<< li

'1 (t,n T eg ~

I <<jl 1 III I '2

$ l I }II }I ~ ,) f} I 141 f 1('} rhh>> 4

~ 1 r 1 X'h X J

<< XX'<<,> l7 X}>h X }le 4~ ail Ih }l I I'.(}'ll 1 f I 'X' Ir<" f ' 2( f riI <<}1(i I ghr I'

~ J Z jX4}<<

I,'<<}'I '}~) }(2 rj rjh'jr<<I}

Tr(I << I<<

4 '~ f '1 24

'1fIl)}I 'll j X 8 ~ SW

~<<

Ijrk r<<$ rgl' ~ X (r<<I lj <<rr$ 4 ',if Ir(2 I I 'li r<<4 tn 4 (<<,((hrr r 2 }(I ( Xlrl jp, fc<< [2, j(;il f', i

' ' 5 f.' I } f X; X I X I }

,)'f 'j*),X 'XX }X l

'<<lX li jl ,Xh <<X X 4 l IE

)} X I ii Jt XT jj l TII }l, r<<

X' I( 4 ll "Xl44XX}

Ii (T

\

I It I JL II I'

J

<<rl rr<<k I'I,

, I ', lk jj, "I

'X

'j II 2

h, lhh X i (I Jh<,X i rp X <<i} ., IA 'll 3 I XA hj Jf, 44 1'l lt

'X}2

Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y. 10048 September 20,1982 Ltr No. EVP -114/SL-2 Office of Nuclear Reactor Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr Eisenhut:

Re: ST. LUCIE UNIT NO 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD SEPTEMBER 13 SEPTEMBER 18 1982 Attached for your information is the Weekly Status Summary of the Joint Ebasco and Combustion Engineering Task Force for the period September 13 through September 18, 1982.

Very truly yours, T H Blodgett Joint Task Force Chairman THB/rob Attachment cc: Robert E Uhrig, FPL w/att D L Christian, FPL w/att 8209240244 BZiHZO PDR ADOCiC 05000389' R ,

PDR

~ ~

~ ~ 0 Engineering Verification ProgramlSL2 C-E Task Force Meekly Status Summary September 13 - September 17 A meeting was held with NRC on Tuesday, September 14, to discuss the independence of the EVP Task Force and its mode of operation.

The Safety Ingection Tank Isolation Valve independent design package was completed with the exception of minor. details awaiting receipt of additional design input.

3. Status of the independent design packages was discussed during a Review Committee meeting held at the SL2 site'Thursday, Se tember 16. The P s e too b egin assembly of existing design information for comparison was re q uested with the EVP design.

~ ~ a

~ I li Engineering Verification Program/SL-2 Ebasco Task Force Weekly Status Summary For Period September 13 September 18, 1982 On Septemher 14, the FPL, Ebasco and C-E EVP Task Force Managers met with the NRC in Bethesda, Maryland, and discussed the, engineering verification program, including the measures being followed,to ensure program independence.

A meeting summary is being prepared by the NRC.

2. The Hydrogen Recombiner.independent design package (Verification Item 4) was completed, and copies are undergoing review for completeness by Review Committee members. Upon Review Committee approval, the existing design will be released for ETF comparison of designs
3. The Main Steam Isolation Valve (Item 7), Control Room Emergency Clean-Up System Valve (Item 3), and ECCS Area Ventilation System HEPA Filter (Item 8) independent design packages are all scheduled for completion during the coming period..As completed, copies will be forwar'ded to Review Committee members for approval to release existing designs for comparison.
4. The Review Committee met at the 5obsite on September 16 to discuss completion of the first Ebasco and C-E independent designs and release of existing designs for comparison. Copies of the Hydrogen Recombiner design package were distributed to the Review Committee, with a completion of review requested by September 21.

Written request has been made for'Project Team- to assemble existing design documents in advance of authorization to r'elease in order to minimize turnover time when Review Committee I

approval is granted.

0 ~ ~

TELEPltONE 'ONVERSATION LOG 0

ENGINEERING VERIFICATION PROGRAM SL2 0

VEEK OF DATE OF PARTICIPATING GENERAL SUBJECT PREPARER OF TELECON ORGANIZATIONS OF TELECON TELECON RECORD Sept, 13 NRC/Ebasco NRC meeting w/EVP Ebasco EVP Task Task Force Mgrs Force Mgr.

Sept. 13 FPL/C-E NRC meeting w/EVP C-E EVP Task Task Force Mgrs Force Mgr. h Sept. 13 FPL/Ebasco NRC meeting w/EVP Eba"co EVP Task Task Force Mgrs Force Mgr.

Sept. 15 C-E/FPL SI Tank Isolation C-E EVP Task Valve Force Mgr.

~ ~

~ ~

4}