Forwards Weekly Status Summary of Joint Ebasco & C-E Task Force for 820802-06
ML17213A326
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/06/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-103-SL-2, NUDOCS 8208120061
Download: ML17213A326 (8)


Text

REGULATO INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:8208120061 DOC ~ DATE: 82/08/06 NOTARIZED; NO FACIL:50-389 St, Lucie Planti Uni~t 2< Florida Power L Light Co.

AUTH ~ NAME AUTHOR AFFILIATION BLODGETT~T,H.

Ebasco Services>

Inc, (sub'f Enserch Corp,)

~RECIP,NAME RECIPIENT AFFILIATION EISENHUT~D,G ~

Division of Licensing DOCKET 05000389

SUBJECT:

Forwards weekly s,tatus suummary of Joint Ebasco 8

C>>E Task Force for 82080?-06, DISTRIBUTION CODE 8 00 1 S COPIES RECEIVED ~ LTR ENCL ~

SIZE ~

~~em~

~~>>>>>>>>

l TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES:

RECIPIENT ID CODE/NAME A/D L ICE NSNG LIC BR P3 LA INT>ERNAL~

ELD/HDS?

IE/DEP EPDS 35 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21

- NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DSI/ASB 27 NRR/DSI/CSB 09 NRR/DSI/ICSB 16 NRR/DSI/RAB 22 NRR/DST/LGB 33 RGN2 EXTERNAL ACRS 41 DMS/DSS (AMDTS)

LPl)R 03 NSIC 05 COPIES LTTR ENCL 1

"0 1

0 1

0 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

2 2

10 10 1

1 1

1 RECIPIENT ID CODE/NAME LIC BR 03 BC

NERSESiV, 01 IE FILE IE/DEP/EPLB 36 NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DS I/AEB 26 NRR/DS I/CPB 10 NRR/DSI/ETSB 12 NRR/DS I/PSB 19 N

SB 23 REG F

04 RM

/MI8 BNL(AMDTS ONLY)

FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1

0 1

1 1

1 3

3 3

3 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

0 1

1 1

1 1

1 1

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 58 ENCL 53

0 I

II e

a

'i I

x X

J t

'a x'

a x

K x

I I

Xa ~

a a

0 Tr x

(

('

I

'I I

I x

v I

'XX x

I,

)I

'I I,

Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y.

10048 August 6, 1982" Ltr No. EVP-103/SL-2 Office of Nuclear Reactor Regulation Attention:

Mr Darrell G Eisenhut, Director Division of Licensing U

S Nuclear Regulatory Commission Washington, D

C 20555

Dear Mr Eisenhut:

Re:

ST. LUCIE UNIT NO.

2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD AUGUST 2 AUGUST 6, 1982 Attached for your information is the Weekly Status Summary of the Joint Ebasco and Combustion Engineering Task Force for the period August 2

through August 6, 1982.

Very truly yours, THB:mg Attachment T H Blodgett Joint Task Force Chairman cc:

Robert E Uhrig, FPL w/attach D L Christian, FPL w/attach 82081'200hi 820806 PDR ADOCK. 05000389 R

PDR

I,

ENGINEERING VERIFICATION PROGRAM SL2 EBASCO TASK FORCE WEEKLY STATUS

SUMMARY

FOR PERIOD AUGUST 2 AUGUST 6, 1982 1 Progress was made in establishing design boundaries for the verification items.

2 Received a portion of the initially requested design inputs.

Additional required inputs are being identified prior to submitting a formal request.

3 Request for assistance from another engineering discipline resulted in the assignment of two more qualified engineers,to the Task Force, bringing the total number to eleven plus Task Force Manager and Clerk-Typist.

4 A meeting of the Task Force Managers has been scheduled for:August 12 at the Combustion Engineering office in Windsor, Conn.

C-E ENGINEERING VERIFICATION TASK FORCE/ St. Lucie 2 WEEKLY STATUS

SUMMARY

AUGUST 2 AUGUST 6 Hi hli hts The C-E Engineering Verification Program Technical Procedure (EVP Procedure No.

2) was completed.

This procedure will guide C-E technical activities and, in conjunction with previously issued Administrative'rocedures, will coordinate C-E activities with the Joint Task Force..

A Task Force technical and administrative document filing system has been instituted in compliance with EVP-001/SL2.

Status Although design inputs (requested July 26 through FPL) have not yet been received from the Project Team, engineering design work has continued, utilizing FSAR reference information as design basis.

All presently available information will be cross-checked for validity against the formal design input when received.

J h

)

TELEPHONE"CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM SL2

~Eg OF 08/02/82 DATE OF TELECON PARTICIPATING ORGANIZATIONS GENERAL SUBJECT OF TELECON PREPARER OF TELECON RECORD August 5

August 5

August 6.

'FPL(C~

C-.E/Ebasco

FPL/C-, E/Ebasco EVP Approval/Design Input EVP Admi'nistrative Details Program Progress; Tentati>e Meeting W'/NRC;. Joint Task Force Meeting Scheduled C-E EVP Task Force Manager C-E EVP Task Force Manager

,=Ebasco EVP Task Force Manager