Forwards Weekly Status Summary of Joint Ebasco & C-E Task Force Engineering Verification Program for 820816-20
ML17213A365
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/20/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-107-SL-2, NUDOCS 8208250111
Download: ML17213A365 (7)


Text

REGULATOR'I i%FORMATION DISTRIBUTION S

'EM (RIDS)

AC1CESSION NBR:8208250111 OOC ~ DATE: 82/08/20 NOTARIZED:

NO FACIL:50-389 St, Lucie Plant< Unit 2< Florida Power 5 Light Co.

AUTH ~ NAME AUTHOR AFFILIATION BLODGETTiTSH, Ebasco Servicesi

Inc, (subs, of Enserch Corp,)

REICIP,NAME RECIPIENT AFFILIATION EISENHUTiD G, Division of Licensing

SUBJECT:

Forwards weekly status summary of Joint Ebasco 8

C"E Task Force engineering verification program for 820816-20

'IST RISUTION CODE:

S001S

.COPIES RECEIVED:LTR I ENCL g SIZE:.

TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES:

DOCKET ¹ 05000389 RECIPIENT ID CODE/NAMIE A/O LICENSNG LIC BR ¹3 LA INTERNAL'LD/HDS?

IE/DEP EPDS 35 NRR/OE/CEB li NRR/DE/GB 28 NRR/OE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/L.QB 32 NRR/DHFS/PTRB20 NRR/OSI/ASB 27 NRR/OS I/CSB 09 NRR/DSI/ICSB 16 NRA/DSI/RA8 2d NRR/OST/LGB 33 RGN2 EXTERNAL: ACRS OMB/OSS (AMDTS)

LPDR 03 NSIC 05 COPIES LTTR ENCL 0

0 1

0 1

1 1

2 2

1 1

1

'1 1

1 1

1 1

1 1

1 1

1 1

1 2

2 10 10 1

1 1

1 1

1 RECIPIENT ID CODE/NAME LIC BR ¹3 BC NERSESPV

~

01 IE FILE IE/DEP/EPLB 36 NRR/OE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OL,B 34 NRR/DS I/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ETSB 12 NRR/DSI/PSB 19 N

RSB 23 REG F ILE 04 BNL (AMDTS ONlY)

FEMA REP OIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 0

1 1

1 1

3 3

3 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 0

1 1

1 1

1 1

1 1

TOTAL NUMBER OF COPIES HEQUIRhD0 LTTR 58 ENCL 53

1 p

lt II l

g o

~

H I

l

~

~

e I

I

)

]1 III K

M H

fu!

e

<V u fl II h

1l w

q g

'K k

~

t II 4I

'i

~

~

Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N Y 10048 August 20, 1982 Ltr No. EVP-107/SL-2 Office of Nuclear Reactor Regulation Attention:

Mr Darrell G Eisenhut, Director Division of Licensing U

S Nuclear Regulatory Commission Washington, D

C 20555

Dear Mr Elsenhut:

Re:

ST LUCIE UNIT NO.

2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD AUGUST 16 AUGUST 20, 1982 Attached for your information is the Weekly Status Summary of the Joint Ebasco and Combustion Engineering Task Force for the period August 16 through August 20, 1982.

Very truly yours, T H Blodgett Joint Task Force Chairman THB/McG Attachment cc:

Robert E Uhrig, FPL w/att D L Christian, FPL w/att yon I 8208250iii 820820 PDR ADOCN, 05000389 R

PDR

ENGINEERING VERIFICATION PROGRAM/SL-2 EBASCO TASK FORCE WEEKLY STATUS

SUMMARY

FOR PERIOD AUGUST 16 AUGUST 20, 1982 1 Finalized design boundaries for the six A/E verification items and formally transmitted the component-specific boundary sketches.

2 Completed and transmitted a third information request for design inputs.

3 Started preparation of detailed workday estimates and related time-phased schedules for each verification item.

ENGINEERING VERIFICATION PROGRAM/SL-2 C-E TASK FORCE WEEKLY STATUS

SUMMARY

August 16 August 20 Hi hli hts 1.

Upon receipt of Revision 1 of the basic program procedure (EVP-001/SL-2),

C-E's Administrative and Technical Program Procedures were updated" to in-corporate related changes.

2.

Formal transmittal of boundary sketches for both C-E verification items was completed on August 13.

Status 1.

C-E task force engineers continue to assemble interface and design re-quirements for the pump. and valve data sheets.

2.

Preliminary calculations for pump performance curve parameters were com-pleted.

I TELEPHONE'CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM SL2 DATE OF TELECON PARTICIPATING ORGANIZATIONS GENERAL SUBJECT OF TELECON PREPARER OF TELECON RECORD August 16 August 16 August 19 Ebasco/C-E C-E/FPL Ebasco/FPL Meeting minutes Task Force Mgrs. Aug.

12 meeting EVP design input Clarified re omission of worK in recent request-for-information letter Ebasco,EVP.Task Force Mgx.

C-E EVP Task Force Manager Ebasco EVP Task Force Manager