ML17213A365

From kanterella
Jump to navigation Jump to search
Forwards Weekly Status Summary of Joint Ebasco & C-E Task Force Engineering Verification Program for 820816-20
ML17213A365
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/20/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-107-SL-2, NUDOCS 8208250111
Download: ML17213A365 (7)


Text

REGULATOR'I i%FORMATION DISTRIBUTION S 'EM (RIDS)

AC1CESSION NBR:8208250111 OOC ~ DATE: 82/08/20 NOTARIZED: NO DOCKET ¹ FACIL:50-389 St, Lucie Plant< Unit 2< Florida Power 5 Light Co. 05000389 AUTH ~ NAME AUTHOR AFFILIATION BLODGETTiTSH, Ebasco Servicesi Inc, (subs, of Enserch Corp,)

REICIP,NAME RECIPIENT AFFILIATION EISENHUTiD G, Division of Licensing

SUBJECT:

Forwards weekly status summary of Joint Ebasco 8 C"E Task Force engineering verification program for 820816-20 RISUTION CODE: S001S .COPIES RECEIVED:LTR TITLE: PSAR/FSAR AMDTS and Related Correspondence I ENCL g SIZE:.

'IST NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAMIE LTTR ENCL ID CODE/NAME LTTR ENCL A/O LICENSNG 0 LIC BR ¹3 BC 0 LIC BR ¹3 LA 0 NERSESPV ~ 01 1 1 INTERNAL'LD/HDS? 1 0 IE FILE 1 1 IE/DEP EPDS 35 IE/DEP/EPLB 36 3 NRR/OE/CEB NRR/DE/GB li 28 1

2 1

1 2

NRR/OE/EQB NRR/DE/HGEB 30 13 3 2

3 2

NRR/OE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/QAB 21 1

'1 NRR/DE/SAB 24 1 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/L.QB 32 1 NRR/DHFS/OL,B 34 1 1 NRR/DHFS/PTRB20 1 1 NRR/DS I/AEB 26 1 1 NRR/OSI/ASB 27 NRR/DSI/CPB 10 1 NRR/OS I/CSB 09 1 1 NRR/DSI/ETSB 12 1 1 NRR/DSI/I CSB 16 1 NRR/DSI/PSB 19 1 1 NRA/DSI/RA8 2d 1 1 N RSB 23 1 1 NRR/OST/LGB 33 1 1 REG F ILE 04 1 1 RGN2 2 2 1 0 EXTERNAL: ACRS 10 10 BNL (AMDTS ONlY) 1 1 OMB/OSS (AMDTS) 1 1 FEMA REP OIV 39 1 1 LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05 1 1 NTIS 1 1 TOTAL NUMBER OF COPIES HEQUIRhD0 LTTR 58 ENCL 53

lt 1

p II l g o ~

e H I l ~ ~

I

)

I ]1 III K M H

<V u II i

fl h

1l k w

'K q g

~

t II 4I

'i

~ ~

Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N Y 10048 August 20, 1982 Ltr No. EVP-107/SL-2 Office of Nuclear Reactor Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D C 20555

Dear Mr Elsenhut:

Re: ST LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD AUGUST 16 AUGUST 20, 1982 Attached for your information is the Weekly Status Summary of the Joint Ebasco and Combustion Engineering Task Force for the period August 16 through August 20, 1982.

Very truly yours, T H Blodgett Joint Task Force Chairman THB/McG Attachment cc: Robert E Uhrig, FPL w/att D L Christian, FPL w/att yon I 8208250iii 05000389 820820 PDR ADOCN, R PDR

ENGINEERING VERIFICATION PROGRAM/SL-2 EBASCO TASK FORCE WEEKLY STATUS

SUMMARY

FOR PERIOD AUGUST 16 AUGUST 20, 1982 1 Finalized design boundaries for the six A/E verification items and formally transmitted the component-specific boundary sketches.

2 Completed and transmitted a third information request for design inputs.

3 Started preparation of detailed workday estimates and related time-phased schedules for each verification item.

ENGINEERING VERIFICATION PROGRAM/SL-2 C-E TASK FORCE WEEKLY STATUS

SUMMARY

August 16 August 20 Hi hli hts

1. Upon receipt of Revision 1 of the basic program procedure (EVP-001/SL-2),

C-E's Administrative and Technical Program Procedures were updated" to in-corporate related changes.

2. Formal transmittal of boundary sketches for both C-E verification items was completed on August 13.

Status

1. C-E task force engineers continue to assemble interface and design re-quirements for the pump. and valve data sheets.
2. Preliminary calculations for pump performance curve parameters were com-pleted.

I TELEPHONE'CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM SL2 DATE OF PARTICIPATING GENERAL SUBJECT PREPARER OF TELECON ORGANIZATIONS OF TELECON TELECON RECORD August 16 Ebasco/C-E Meeting minutes Ebasco,EVP.Task Task Force Mgrs. Aug. 12 Force Mgx.

meeting August 16 C-E/FPL EVP design input C-E EVP Task Force Manager August 19 Ebasco/FPL Clarified re omission Ebasco EVP Task of worK in recent request- Force Manager for-information letter

f.