Forwards Joint Ebasco & C-E Task Force Engineering Verification Program Weekly Status Summary for 821213-17
ML17213A916
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 12/21/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-133-SL-2, NUDOCS 8212280187
Download: ML17213A916 (11)


Text

REGULATORY I ORMATION DISTRIBUTION SYS i (RIDS)

ACCESSION NBR:8212280187 DOCSDATE: 82/12/21 NOTARIZED:

NO FACIL:50"389 St, Lucie P lant'ni t 2<

F 1 or ida Power 8 Light Co.

AUTH NAME AUTHOR AFFILIATION BLODGETTET.H.

Ebasco Set vices, Inc,, (subs

~ of Enserch Corp,)

RECIPE NAME RECIPIENT AFFILIATION EISENHUTiD.G, Division of Licensing

SUBJECT:

Forwar ds Joint Ebasco 8

C'-E task force engineer ing verification program weekly status summary for 821213 17.

DISTRISUTION CODE:

SOOIS COPIES RECEIVED:LTR f ENCL L

SIZE:

TITLE: Licensing Submittal:

PSAR/FSAR Amdts 8, Related Correspondence NOTES:

DOCKET 05000389 REC IP IENT ID CODE/NAME A/D LICENSNG LIC BR 03 LA INTERNAL'LD/HDS2

'E/DEP'PDS 35 NRR/DE/AEAB NRR/DE/EQB NRR/DE/HGEB 30

'RR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB,34 NRR/DS I/AEB 26 NRR/DSI/CSB 09 NRR/DS I/HETB 12 N

RAB 22 EG F IL 04

/MIB EXTERNAL: ACRS 41 DMB/DSS (AMDTS)

LPDR 03 NSIC 05 COPIES LTTR ENCL 0

0 1

0 1

1 1

0 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

0 6

1 1

1 1

1 1

REC IP IENT ID CODE/NAME LIC BR 03 BC NERSESgV

~

01 IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/CPB 10 NRR/DS I/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23 RGN2 BNL(AMDTS ONLY)

FEMA<<REP DIV 39 NRC PDR 02 NTIS COPIES LTTg ENCL 1

0 1

1 1

1 3

1 1

2 2

1 1

1 1

1 1

1 1

0 1

1 1

1 1

1 1

1 3

3 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 52 ENCL 45

li

,u 1

4 I(, ~

1 4)

'I) '<<

i J

) t,",F,

~

W u

tl<<1<<

4) f W>>u

>>4 Wu t

>>lt W 1 4

~

~ fl

~

I

'I lt I

Jr) lfitJ 1 q

a)

II t ~

~

JJ 1<<>>

I 4

Q')ll 1 ll

>>l)4 JJJ u

N >><<

'<<)>>'W f'l f W<> NI rfu')tf I if f>>

) f

'NI)g 4>> I>>>>

ui",uf<<FWI lt<<'))

i<<rlu N

i Wr> W<<

) g'<<W" Nii )>>JJ

't)'Iill a

Wl<<

N 4

RW JJ jf IJ<<W 'tuf)f>>'ll I'f,l 1

Nil 4

I,

,i>>i.

1 I

>>)TR,R Fr' lr ) lr.>>

N il, I

fk, f Nut fll

,<<I W

ui ui,)

R R

R iI R

R F

<<JJ t <<r

<<J I'X i

X J

Jt WQ tt 't'lit I

IJt i il ljuuh 'i l JJ]l W>>

Nl t Iu Ji

>R

'.>R

',JN I

)WW, ut I

1 W uu'I'J l

'u~

'i N

ut ilrl I,, II) w/

R 1

wtf Ju

>> 'u Fll N

4

Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y.

10048 December 21, 1982 Ltr No. EVP-133/SL-2 Office of Nuclear Regulation Attention:

Mr Darrell G Eisenhut, Director Division of Licensing U

S Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Mr Eisenhut:

Re:

ST LUCIE UNIT NO.

2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD DECEMBER1'3ECEMBER 1'7 1982 Attached for your information is the Weekly Status Summary of the joint Ebasco and Combustion Engineering Task Force for the period December 13 through December 17, 1982.

Very truly yours, T H Blodgett Joint Task Force Chairman THB/sac Attachment cc:

Robert E Uhrig, FPL, w/att D L Christian, FPL, w/att r

8212280187 821221

-"-PDR ADOCK 05000389 R,,

PDP>

C'

~

hect 1 of 2

ENGINEERING VERIFICATION PROGRAM/SL-2 EBASCO TASK FORCE WEEKLY STATUS

SUMMARY

FOR PERIOD DECEMBER 13 DECEMBER 17 II 1.

On Dec.

13 and 14 the ETF received and evaluated the remaining Project Team responses for all outstanding unresolved item (discrepancy) reports (UIRs).

2.

Of the twenty-one UIRs still to be resolved, the ETF considered Project Team responses to thirteen as being satisfactory and the items ready to closeout.

Responses to the remaining eight were considered to be conditionally acceptable.

3.

On Dec.

15, the EVP Review Committee convened in Combustion Engineering's

Bethesda, Maryland office to address all remaining unresolved items generated by the Task Force during the engineering verification program.

NRC representatives were invited and attended the meeting.

4.

Review Committee action on the twenty-one UIRs was as follows:

a.

Committee concurred with ETF on resolution of thirteen UIRs and the items were closed out.

b.

Committee classified seven UIRs as observations and transmitted them to Project Team for action.

c.

Committee classified one UIR as closed unless reopened following Task Force review of additional information to be provided by Project Team.

5.

A total of fifty-six UIRs were prepared by the ETF during the program.

They were broken down as follows by program phase:

PHASE NO.

OF UIRs Independent Design Review Field Installation Verification Start-up Operation Verification 45 6.

The majority of ETF-generated draft material for the program final report was completed prior to the Dec.

15 Review Committee meeting.

(Refer to the C-E Task Force Weekly Status Summary for additional related information)

P

Sh 2 of 2 7.

Previously requested, but then unavailable, vendor shop test data for the HEPA Filter (Item 8) is now being provided by the Project Team.

Receipt of this information will enable the ETF to update start-up operation verification comparison sheets early next period for incorporation in the program final report.

8.

With the work now essentially

complete, the Task Force has started to disband.

ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

C-E TASK FORCE DECEMBER 13 DECEMBER 17 l.

Additional technical information received from the Project, Team prior to the final Review Committee Meeting enabled the C-E Task Force to resolve all but one of the remaining discrepancy items.

2.

The majority of report draft material was completed in prepara-tion for the final EVP Review Committee Meeting scheduled for December 15 in Bethesda, MD. It was decided by FP&L that the EVP report would be submitted to NRC as an attachment to a package covering the several aspects of St.'ucie Unit 2 design and construction quality assurance.

A draft package was delivered to NRC/DL (at Bethesda)

Friday, December 17.

3.

A total of twenty-eight discrepancy reports were issued by the C-E EVP Task Force during the span of this program.

Following is a numerical breakdown of differences (discrepancy reports) by program phase:

PHASE NUMBER Design Design/Field Installation'esign/Startup Operation Field Installation 21 5

1 1

EPHONE: CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM SL2

~EK PF l2/l3/82 DATE OF TELECON PARTICIPATING ORGANIZATIONS GENERAL SUBJECT OF TELECON PREPARER OF TELECON RECORD December l4 S.

Segarra (Ebas)

R. Birtwistle (C-Ebasco UIR g4l, 42,

,)

43, 6

44 for SIT Isolation Valve C-E EVP Task Force Engineer (R Birtwistle)

I I

A<q II if