Forwards Weekly Status Summary of Joint Ebasco & C-E Task Force for 820809-13.Remaining Design Input Received.Revision 1 to Program Procedure EVP-001/SL-2 Issued
ML17213A348
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/13/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-105-SL-2, NUDOCS 8208190193
Download: ML17213A348 (9)


Text

REGULATOR'NPORMATION DISTRIBUTION "0'EM (RIDSI ACCE'S SION NBR: 8? 08190193 DOC ~ DATE: 82/08/13 NOTARIZED:

NO FACIL:50"389 St, Lucie Pl anti Uni~t '2P Florida Power 8 Light Co.

AUTH~ NAME AUTHOR 'AFFILIATION BLODGETTrT.H.

Ebasco Servicesi Inc, (subs.

of Enserch Corp.)

RECIP ~ NAME RECIPIENT AFFILIATION EISENHUTEDSG, Division of Licensing DOCKET 05000389

SUBJECT:

For wards weekly >status summary of Joint Ebasco 8

C E -Task Force for 820809"13 'emaining design input. receivedsRevision 1 to program Procedure EVP 001/SL '2 =issued, DISTRIBUTION CODE:

BOOIS iCOPIES RECEIVED:LTR g ENCL /

TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES; RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR 03 LA INT1ERNAL: ELO/HDS2 IE/DEP EPOS 35 NRR/OE/CEB il NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 3?.

NRR/DHFS/PTRB20 NRR/OS I/ASB 27 NRR/DS I/CSB 09 NRR/DSI/ICSB 16 NRR/DSI/RAB 22 NRR/DST/LGB 33 RGN2 EXTiERNAL: ACRS 41 DMB/DSS (AMDTS)

LPDR 03 NSIC 05 COPIES LTTR ENCL 1

"0 1

0 1

~ 0 1

1 1

1 2

2 1

1 1

1 1

1-1 1

1 1

1 1

1 1

1 1

1 1

1 2

2 10 10 1

1 1

1 1

RECIPIENT ID 'CODE/NAME LIC BR P3 BC NERSESPV

~

01 IE FILE IE/DEP/EPLB 36 NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/OS I/AEB 26 NRR/DSI/CPB 10 NRR/DS I/ETSB 1'2 NRR/DS I/PSB 19 NRR I/RSB 23 04 RM/DDAMI/MIB BNL(AMDTS ONLY)

FEMA REP OIV 39 NRC 'PDR 02 NTIS COPIES LTTR,ENCL 1

0 1

1 1

1 3

3 3

3

'2 2

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

0 1

1 1

1 1

1 1

1

.TOTAL NUMBER OF COPIES REQUIRED ~

LTTR 58 ENCL,53

)I 11 4

L:

O f

~

fI 1

O II'

}

I')

f1 lg

'l5

En eering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y.

10048 August 13 1982 Ltr No. EVP-105/SL-2 Office of Nuclear Reactor Regulation Attention:

Mr Darrell G Eisenhut, Director Division of Licensing U

S Nuclear Regulatory Commission Washington, D

C 20555

Dear Mr Eisenhut:

Re:

ST LUCIE UNIT NO.

2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS StR1MARY FOR PERIOD AUGUST 9 AUGUST 13, 1982 Attached for your information is the Weekly Status Summary of the Joint Ebasco and Combustion Engineering Task Force for the period August 9

through August 13, 1982.

Very truly yours, THB/McG Attachment T H Blodgett Joint Task Force Chairman cc:

Robert E Uhrig, FPL w/attach D L Christian, FPL w/attach 8208i90193 820813 PDR ADOCK 05000389 R

PDR

ENGINEERING VERIFICATION PROGRAM << SL2 EBASCO TASK FORCE WEEKLY STATUS

SUMMARY

FOR PERIOD AUGUST 9 AUGUST 13,'982-1 The Task Force received the remaining existing design inputs in response to its initial request for'nformation list. References'o the FSAR were pro-vided where specifically requested documents'were not generated for the St Lucie Project.

i 2 - A second information request was submitted August,13, with preparation of a third nearing completion.

E 3 Completion of the design boundaries for all six A/E verification items will be realized early next period.

4 A meeting of the FPL, C-E and Ebasco EUP Task Force Managers was held on August 12 in Windsor, Conn.

5 - Revision 1 to the overall program procedure EVP-001/SL-2 was issued during the period.

1 I*

F 1,I

. ~

U l~

ENGINEERING VERIFICATION PROGRAM/SL 2 C-E TASK FORCE WEEKLY STATUS

SUMMARY

August 9 August 13 Hi hli hts l.

A joint. Task Force meeting was held atiWindsor.August.12, to discuss design verification boundaries and formal design input status.

This meeting: provided the FPL Task Force Manager an. opportunity to observe the C-E EVP facilities and.

to confirm independence of the 'operation.

2.

Agreement has been,reached'on C-E verification item boundaries transmitted with original design input request.

3.

The C-E Engineering Verification Program Technical'Procedure, will be updated to include any revisions in the progiam basic procedure (EVP-001/SL2) but will remain an internal document designed to guide C-"E's EVP activities.

Status E

A review of HPSI Pump safety interface requirements is complete.

Calculation of the'inimum flow vs. head requirements to satisfy controlling accident conditions is in process.

Design basis accident conditions affecting the SI Tank Isolation Valve design are being reviewed.

p I'l' I

I 4 V.H n'v-.c:~ i<

1

+!'

P

('~

ENGINEERING VERIFICATION PROGRAM SL2 WEEK OF 08/09/82 DATE OF TELECON PARTICIPATING ORGANIZATIONS GENERAL SUBJECT OF TELECON PREPARER OF TELECON RECORD August 9

C-E/FPL Arrangements for.FPL/Ebascq',~rC-E EVP Task C-E, EVP Task Force Manager's Force Mgr meeting August 10 August ll August 13 C-E/Ebasco Ebasco/FPI, FPL/Ebasco EVP administrative details; meeting agenda P

Request clarification of verification item equipment tag no.

Verification item equipment tag no.'larified Ebasco EVP Task Force Mgr Ebasco EVP Task Force Mgr Ebasco EVP Task Force Mgr