Forwards Weekly Status Summary Rept of Joint Ebasco & C-E Engineering Task Force for 820906-11
ML17213A443
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/10/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-112-SL-2, NUDOCS 8209150254
Download: ML17213A443 (9)


Text

DOCKET 05000389 NOTES:

REGULATOR NFORMATION DISTRIBUTION TEM (RIDS)

AOCE'BSION NBR;8209150254 DOC DATE; 82/09/10 NOTARIZED; NO FAGIL:50 389 St, Lucie Planti Uni~t 2i Florida Power 8 Light Co,

'AUTH,NAME AUTHOR AFF ILIATION BLODGETTiTiH, Ebasco ServicesE Inc.

(subs, of Enserch Corp.)

REPCIP ~ NAME RECIPIENT AFFILIATION EISENHUTgDEG, Di.vision of Licensing V

SUBJECT:

Forwards weekly Istqtus >>summary rept of,joint Ebasco 8 IC~E engineering Itask

.force for 820906 11, OISTRISUTI N:COOE:

8001S COPIES 'RECEIVES:LTR. P ENCL, f,

'SIZE:

TITLE; Licensing Submi,t.tal:

PSAR/FSAR Amdts L Related Correspondence~i~

<<~

RECIPIENT IO CODE/NAME A/0 LICENSNG LIC BR ¹3 LA INTERNALS ELD/WOS2 IE/DEP EPDS 35 NRR/DE/AEAB NRR/OE/EQB 13 NRR/OE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFE840

,NRR/DHFS/OLB 34 NRR/DSI/AEB 26 NRR/DSI/GPB 10 NRR/DSI/ETSB 12 NRR/DSI/PSB 19 NRR S

/RSB

'23 E(s ILE 04

/MIB EXTERNALS ACRS 41 DMB/DSS (AMDTS)

LPDR

~ 03

,NSIC 05 ICOP IES

.LTTR ENCL 1

0 1

0 0

1 1

.0 3

"3 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

0 10 10 1

1 1

1 1

1 RECI'P IENT ID CODE/NAME LIC BR ¹3 BC NERSESEV

~

Ol IE F ILE IE/OEP/EPL'8 36 NRR/OE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/OE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/IP, TRB20 NRR/DS I/ASB 27 NRR/DS I/CSB 09 NRR/DS I/ICSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN?

BNL(AMDTS ONLY)

FEMA REP DIV 39 NRC PDR 0?

NTIS COPIES LTTR ENCL 1

0 1

1 1

1 N3 3

1 1

'2 2

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 2

2 1

1 1

1 1

1 1

TOTAL NUMBER OF COPIES REQUIRED; LITTR 59 ENCL 53

il ','

i i

~

W 4,

r

)

'fi

"'i lr, II',

Il 3

I IVI f ii 1

II ill 4 i i

fl t

4 'W III tl W

QI I

fr I 'I il Ir,'i lI I!

Jg

~ 'a

'I p W fl

, X g II k

)t C,

I I

t 'y

'I lill II I

t Wtf I

'4 g f,i N 'IW r,

+ I I

I' r

I I

I I.I,

WW

, I'IW k

4 tt rt

0 Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y. 10048 September 10,1982 Ltr No.

EVP 112/SL-2 Office of Nuclear Reactor Regulation Attention:

Mr Darrell G Eisenhut, Director Division of Licensing U

S Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Mr Eisenhut:

Re:

ST.

LUCIE UNIT NO.

2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD SEPTEMBER 6 SEPTEMBER 11 1982 Attached for your information is the Weekly Status Summary of the Joint Ebasco and Combustion Engineering Task Force for the period September 6 through September 11,1982.

Very truly yours, THB/rob Attachment T H Blodgett Joint Task Force Chairman cc:

Robert E Uhrig, FPL w/att D L Christian, FPL w/att 8209i50254 820910 PDR *DOCK 05000389 R

PDR pe(

'y

ENGINEERING VERIFICATION PROGRAM/SL-2 HBASCO TASK FORCE MEEKLY STATUS SUK1ARY FOR PERIOD SEPTEMBER 6-SHPTEMBFR 11,1982 I

1.

Work continued on the independent design review phase of the program, with priority items one (H~ recombiner) and two (main steam isolation valve) continuing << receive the most attention.

Independent design of the 1i recombiner is scheduled for completion September 15.

.2 2.

No response has been received to date re our September 2 information request letter (EVP-306/SL-2) despite requests to expedite.

The request pertains to the main steam isolation valve (priority item 2) 3.

A meeting of the FPL, C-E and Hbasco Task Force Managers was held on September 8, in the Ebasco New York office to review program progress.

4.

The HVP Task Force Managers will meet with the NRC in Bethesda on September 14 to discuss the EVP program and the measures used to assure program independence.

5.

The EVP Review Committee will meet in Florida on September.

16 'concerning completion of the first independent designs and release of existing designs for compari on.

6.

Work continued on a selective overtime 'asis No work was perfomed on

Monday, September 6, ~n observance of the Labor Day holiday.

~P

EHGXNHERXNG UERXFXCATXO".I'PROGRAM/SI.2 C-E TASK 1'ORCH WEEKI.Y STATUS Sl29IARY SEPTEMBER 6 SEPTEISER 10 1.

Safety injection tank isolation valve calculation checks are continuing.

Completion of the independent design package is now scheduled for 9/15.

2.

Three additional qualified engineers have been selected and will be assigned to the C-F. Task Force during September.

A total of eight engineers are now assigned on either a full-time or part-time basis.

3.

Those portions of design input not yet received were discussed and tabulated at the 9/8 meeting of the Task Force Managers.

TELEPHOhL'ONVERSATXON LOG aV ENGINEERING VERXFXCATXON PROGRlQi - SL2

'tKEK OF 09/06/82 DATE OF TELECON PARTXCXPATING ORGANIZATIONS GENERAL SUBJECT OF THLECON PREPARER OF TELECON RECORD SePt

~

7

'Sept.

9 Sept o

9 Ebasco/FPL FPL/C-E FPL/C-E Expedite response to information request xe HSXV Design Review Committee meeting Design Xnput; NRC meeting Ebasco EVP Task Force Ngr C-E EVP Task Force Hgr.

C-E EVP Task Force Hgr Sept.

9 FPL/Ebasco NRC meeting; EVP Review Committee meeting Ebasco EVP Task Force Hgr