Forwards Weekly Status Summary Rept of Joint Ebasco & C-E Engineering Task Force for 820906-11
ML17213A443
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/10/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-112-SL-2, NUDOCS 8209150254
Download: ML17213A443 (9)


Text

REGULATOR NFORMATION DISTRIBUTION -

TEM (RIDS)

AOCE'BSION NBR;8209150254 DOC DATE; 82/09/10 NOTARIZED; NO DOCKET FAGIL:50 389 St, Lucie Planti Uni~t 2i Florida Power 8 Light Co, 05000389

'AUTH, NAME AUTHOR AFF IL IATION BLODGETTiTiH, Ebasco ServicesE Inc. (subs, of Enserch Corp.)

REPCIP ~ NAME RECIPIENT AFFILIATION EISENHUTgDEG, Di.vision of Licensing V

SUBJECT:

Forwards weekly Istqtus >>summary rept of, joint Ebasco 8 IC~E engineering Itask .force for 820906 11, OISTRISUTI N:COOE: 8001S COPIES 'RECEIVES:LTR. P ENCL, f, 'SIZE: <<~

TITLE; Licensing Submi,t.tal: PSAR/FSAR Amdts L Related Correspondence~i~

NOTES:

RECIPIENT ICOP IES RECI'P IENT COPIES IO CODE/NAME .LTTR ENCL ID CODE/NAME LTTR ENCL A/0 LICENSNG 1 0 LIC BR ¹3 BC 1 0 LIC BR ¹3 LA 1 0 NERSESEV ~ Ol 1 1 INTERNALS ELD/WOS2 0 IE F ILE 1 1 IE/DEP EPDS 35 1 1 IE/OEP/EPL'8 36 N3 3 NRR/DE/AEAB .0 NRR/OE/CEB 11 1 1 NRR/OE/EQB 13 3 "3 NRR/DE/GB 28 '2 2 NRR/OE/HGEB 30 2 2 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 24 1 1 NRR/OE/SEB 25 1 1 NRR/DHFS/HFE840 1 1 NRR/DHFS/LQB 32 1 1

,NRR/DHFS/OLB 34 1 NRR/DHFS/IP, TRB20 1 NRR/DSI/AEB 26 1 NRR/DS I/ASB 27 1 1 NRR/DSI/GPB 10 1 NRR/DS I/CSB 09 1 1 NRR/DSI/ETSB 12 1 NRR/DS I/ICSB 16 1 1 NRR/DSI/PSB 19 1 1 NRR/DS I/RAB 22 1 1 NRR S /RSB '23 1 1 NRR/DST/LGB 33 1 1 E(s ILE 04 1 1 RGN? 2 2

/MIB 1 0 EXTERNALS ACRS 41 10 10 BNL(AMDTS ONLY) 1 1 DMB/DSS (AMDTS) 1 1 FEMA REP DIV 39 1 LPDR ~

03 1 1 NRC PDR 0? 1 1

,NSIC 05 1 1 NTIS 1 1 TOTAL NUMBER OF COPIES REQUIRED; LITTR 59 ENCL 53

il ','

i ~

W 4, i

r

) 'fi ' "'i lr, II', Il 3 I IVI f ii $ , 1 II ill 4 i i fl t 4 'W III tl W QI I fr I 'I il Ir,'i lI W fl I! Jg

'I X p ,

~ 'a g II k

I

)t C, I

t 'y 'I r

li ll Wtf I II r, I I.I,

'4 g I

t f,i I I

'IW N + I I

I' rt

WW 4

I'IW tt k

0 Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y. 10048 September 10,1982 Ltr No. EVP 112/SL-2 Office of Nuclear Reactor Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr Eisenhut:

Re: ST. LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD SEPTEMBER 6 SEPTEMBER 11 1982 Attached for your information is the Weekly Status Summary of the Joint Ebasco and Combustion Engineering Task Force for the period September 6 through September 11,1982.

Very truly yours, T H Blodgett Joint Task Force Chairman THB/rob Attachment cc: Robert E Uhrig, FPL w/att D L Christian, FPL w/att 8209i50254 820910 pe(

PDR *DOCK 05000389 R PDR

'y ENGINEERING VERIFICATION PROGRAM/SL-2 HBASCO TASK FORCE MEEKLY STATUS SUK1ARY FOR PERIOD SEPTEMBER 6- SHPTEMBFR 11,1982 I

1. Work continued on the independent design review phase of the program, with priority items one (H~ recombiner) and two (main steam isolation valve) continuing << receive the most attention. Independent design of the 1i.2 recombiner is scheduled for completion September 15.
2. No response has been received to date re our September 2 information request letter (EVP-306/SL-2) despite requests to expedite. The request pertains to the main steam isolation valve (priority item 2)
3. A meeting of the FPL, C-E and Hbasco Task Force Managers was held on September 8, in the Ebasco New York office to review program progress.
4. The HVP Task Force Managers will meet with the NRC in Bethesda on September 14 to discuss the EVP program and the measures used to assure program independence.
5. The EVP Review Committee will meet in Florida on September. 16 'concerning completion of the first independent designs and release of existing designs for compari on.
6. Work continued on a selective overtime 'asis . No work was perfomed on Monday, September 6, ~n observance of the Labor Day holiday.

P

~

EHGXNHERXNG UERXFXCATXO".I'PROGRAM/SI.2 C-E TASK 1'ORCH WEEKI.Y STATUS Sl29IARY SEPTEMBER 6 SEPTEISER 10

1. Safety injection tank isolation valve calculation checks are continuing.

Completion of the independent design package is now scheduled for 9/15.

2. Three additional qualified engineers have been selected and will be assigned to the C-F. Task Force during September. A total of eight engineers are now assigned on either a full-time or part-time basis.
3. Those portions of design input not yet received were discussed and tabulated at the 9/8 meeting of the Task Force Managers.

TELEPHOhL'ONVERSATXON LOG aV ENGINEERING VERXFXCATXON PROGRlQi - SL2

'tKEK OF 09/06/82 DATE OF PARTXCXPATING GENERAL SUBJECT PREPARER OF TELECON ORGANIZATIONS OF THLECON TELECON RECORD SePt ~ 7 Ebasco/FPL Expedite response Ebasco EVP Task to information Force Ngr request xe HSXV

'Sept. 9 FPL/C-E Design Review Committee C-E EVP Task meeting Force Hgr.

Sept o 9 FPL/C-E Design Xnput; NRC C-E EVP Task meeting Force Hgr Sept. 9 FPL/Ebasco NRC meeting; EVP Ebasco EVP Task Review Committee meeting Force Hgr

V ~yr

'V