Forwards Joint Ebasco & C-E Task Force Engineering Verification Program Weekly Status Summary for 821011-15
ML17213A583
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/15/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-120-SL-2, NUDOCS 8210260466
Download: ML17213A583 (9)


Text

REGULA'TORY PORMATION DISTRIBUTION SYM (RIDS)

ACCESSION NBR 82 1 0260466 DOC ~ DATE i 82/ 1 0/ 15 NOTA R I'ZED ) NO DOCKET ¹ FACIL:50 389 St, Lucie Planti Uniit 2< Flor ida Power 4 Light Co+ 05000389 AUTH, NAME AUTHOR AFFILIATION BLODGETTi TBH, Ebasco Ser vicesi Inc, (subs, of* Enserch iCorp,)

RECIP NAME

~ RECIPIENT AFFILIATION EISENHUTiD.G, Division of Licensing

SUBJECT:

Forwards joint Ebasco 8 iC E task force;engineering verification program weekly status summary for 821011 150 DISTRIBUTION CODE: SOOIS COPIES iRECEIYED:LTR" Z ENCL SIZE:. -g TITLE: Licensing Submittal: .PSAR/FSAR Amdts 8 Related Correspondence NOTES:

RECIPIENT 'COPIES RECIPIENT COPIES

,ID CODE/NAME LTTR ENCL =ID CODE/NAME LTTR ENCL A/D LICENSNG 0 LIC BR ¹3 BC 1 0 LIC BR ¹3 LA 1 0 NERSESiV ~ 01 1 1 INTERNAL: ELD/HDS2 1 0 IE FILE 1 1 IE/DEP EPOS 35 1 IE/DEP/EPLB 36 '3 3 NRR/DE/AEAB 1 0 NRR/DE/CEB 11 1 1 NRR/DE/EQB 13 3 NRR/DE/GB 28 2 2 NRR/DE/HGEB 30 2 2 NRR/DE/MEB 18 1 1, NRR/DE/MTEB 17 1 1 NRR/DE/GAB 21 1 1 NRR/DE/SAB 24 1 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFEBQO 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 3A 1 1 NRR/DHFS/PTRB20 1 1 NRR/DSI/AE8 26 1 1 NRR/DSI/ASB 27 1 1 NRR/DSI/CPB 10 1 1 NRR/DS I/CSB 09 1 1 NRR/DSI'/ETSB 1? 1 1 NRR/DSI/ICSB 16 1 1 NRR/DSI/PSB 19 1 1 NRR/DSI/RAB 22 1 1

/RSB 23 1 1 NRR/DST/LGB 33 1 1 EG 0$ 1 1 RGN2 2 2 RM/DDAMI/MI 8 1 0 EXTERNAL: ACRS 01 6 6 BNL(AMDTS ONLY) 1 1 DMB/DSS (AMDTS) 1 1 FEMA~REP DIV 39 1 1 LP.DR 03 1 1 NRC PDR 02 1 1 NSIC 05 1 NTIS 1 TOTAL NUMBER OF COPIES REQUIRED: L'TTR 55 ENCL 09

r faJn<.I grh fi )I) '.f 4)(I ~ '" I) 'h) l f 1 e )VII'.-f',)0l I) I< F ih) I ) h) P 4 ~ 0hj 4 )hlI J f n < I>>>)~of f rl f f/ ))! llh r) J g lr<< II JO ~ M')Ir',) ) '1 f3 lhf '

~ ~ 1 hi, lf fi l>I )M I~ ltr)

) f I )!'f r )'V) "

MM g ) l >>! l, I!f if Ih)CI ) I!Mr)) IM) l 1 l ) <<)

f', ') I i l f,! ll) "I Fh ) l M4') < i) )'

~ < <<III ),)ll I J','!) 3)f k I 1g I ) IIr)fi,f Mh!

I,(F <>>J l!

f,) " .<<I f i

< I f f) 1 f <<! hf ),

f j

)fihfT  !

ME fig f !I

~

f'. II* 'M l!

f IhfI

)-) . M I )hh, 1 ig!,1 Hl ',ll hh,

.M 'hh lf fI w  ! il>M ht,l I'> lf

...,) 1 I rl )l r

h 'kI M I hr I ~

'rM l

,) i fXF )

I I I)

(Yf ">> f<<')>> fhlj Jj, lh ", << '1

'," f i,%jl fI x 1 ii I'l ') f I ihr 1 ) k 'Cf M

'i I If'7 li k ;1 ji i"

Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center-15th Floor New York, N. Y. 10048 October 15,1982 Ltr No. EVP-120/SL-2 Office of Nuclear Reactor Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr Eisenhut:

Re: ST. LUCIE UNIT N0.2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD OCTOBER 11-OCTOBER 15 1982 Attached for your information is the Weekly Status Summary of the joint Ebasco and Combustion Engineering Task Force for the period October ll through October 15,1982.

Very truly yours, T H Blodgett Joint Task Force Chairman THB/rob Attachment cc: Robert E Uhrig, FPL w/att D L Christian, FPL w/att

V

<<4

ENGINEERING VERIFICATION PROGRAM/SL-2 EBASCO TASK FORCE WEEKLY STATUS

SUMMARY

-FOR PERIOD OCTOBER 11-OCTOBER 15,1982 The completed independen't design package for the Main Steam Isolation Valve (Verification Item 7) was transmitted to Review Committee members October 11 via Federal Express for package completeness review. Committee approval to release existing design for ETF comparison is anticipated early in the week of October 18.

2. Review Committee authorization to release existing .designs or ETF comparison was given to the Project Team on October 13 for the following verification items:
a. Item 8 HEPA Filter for ECCS Area Ventilation System
b. Item 5 Area Radiation Monitor GM-26-22 .

Document transmittals to'he ETF are expected to commence early next period.

3. Review Committee approval to release existing design for Tornado Missile Shield Door RA 109 (Verfication Item'6 ) did not make the ETF-requested date of October 13. Approval is now exp ece t d to be granted October 18.

Independent vs. existing design comparisons for. the Hydrogen Recombiner (Item 4) and Control Room Emergency Cleanup System Valve (Item 3) are nearing completion. The last of the requested existing design documents were received for both items other than the foundation design drawing for Item 4, release of which was not requested until October 13.

5. The component boundaries for C-E Verification n Items 1 (Hig h Pressuxe a ety njection Pump) and 2 (Safety Injection. Tank Isolation Valve) are being expanded. The Ebasco Task Force will interface. with the C-E Task Force for the p erfo rmance of additional independent design activities.

ENGINEERING VERIFICATION PROGRAM/SL-2 C-ETASK FORCE WEEKLY STATUS StkiMARY OCTOBER 11-OCTOBER 1511982

1. The EVP Review Committee, on October 14, authorized release of existing design information for the High Pressure Safety Injection Pump (C-E Verification Item 1). Comparison with the recently completed independent design package will begin as soon as this information is received from the Project Team.
2. Additional Ebasco/CE interface activity is planned for Items 1 and 2 (HPSI Pump 6 SIT Isolation Valve) prior to beginning the on-site verification phase. The additional work scope will include instrumentation/

electrical interface review, as well as component nozzle/piping loading analysis.

The C-E Task Force will start to assemble and transmit information to the Ebasco Task Force during the next report period.

3. Although not all existing design information has been received from the Project Team, comparison of the SIT Isolation Valve independent design is continuing.

I ENGINEERING VERIFICATION PROGRAM SL2 WEEK OF 10-11-82 DATE OF PARTICIPATING GENERAL SUBJECT PREPARER OF TELECON ORGANIZATIONS OF TELECON TELECON RECORD October ll FPL/C-E Task Force administrative and Review Committee C-E EVP Task Force Mgr planning October 13 C-E/Ebasco Design package Review C-E EVP Task Committee action Force Mgr October 14 FPL/C-E Review Committee approval C-E EVP Task of HPSI Pump independent Force Mgr design package October 14 C-E/Ebasco/FPL Review Committee C-E EVP Task conference call re 'Force Mgr approval of Item 1 (HPSI Pump) s Item 8 (HEPA Filter), and Item 5 (Area Radiation Monitor) independent design pkgs; additional C-E/Ebasco work scope related to Verif. Items 1 and 2 October 14 C-E/Ebasco Discussion of additional C-E EVP Task C-E/Ebasco work scope Force Mgr re Items 1 and 2

e

~l ~ t I