REGULATORY Ili RMATION DISTRIBUTION SYS1 (RIDS) nCCE~SION NBR:8212280405 DOC.DATE: 82/12/22 FACIL$50-'389 St. Lucie Plant~
Unit 2, Florida AUTH,NAME AUTHOR AFFILIATION BLODGETTgT.HE Ebasco Services~
Inc.
(sub'ECIP
~ NAME RECIPIENT AFFILIATION EISENHUT<D.G, Division of Licensing
SUBJECT:
Forwards minutes of engineering veri committee 821215 final meeting in Be disbanded as of 821217
~
DISTRIBUTION CODE:
B001S COPIES RECEIVED:LTR TITLE: Licensing Submittal; PSAR/FSAR Amdts L
NOTES:
NOTARIZED 4 NO Power 8 Light Co.
of Enserch Corp,)
fication pr'ogram review thesda~MD
~ Task force 1
eNcL l size:
Related Correspondence DOCKET 05000389 RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR N3 LA INTERNAL: ELD/HDS2 IE/DEP EPDS 3b NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 2Q NRR/OHFS/HFEBA0 NRR/DHFS/OLB 34 NRR/DSI/AEB 26 NRR/DSI/CSB 09 NRR/DSI/METB 12 RAB 22 f
G FILE 00
/MIB EXTERNAL: ACRS 41 DMB/DSS (AMDTS)
LPOR 03 NSIC 05 COPIES LTTR ENCL 0
1 0
1 0
1 1
1 0
?
2 1
1 1
1' 1
1, 1
1 1
1 1
1 1
1 1
1 1
1 0
6 6
1 1
1 1
1 1
REC IP IENT ID CODE/NAME LIC BR P3 BC NERSES r V ~
01 IE FILE IE/DEP/EPLB NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 3?
NRR/OL/SSPB NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB
?3 RGN2 BNL(AMDTS ONLY)
FEMA REP DIV 39 NRC PDR 02 NTIS-COPIES LTTR ENCL 0
1 3
3 1
2 2
1 1
1 1
1 1
1 1
0 1
1 1
1 1
1 1
1 3
3 1
1 1
1 1
1 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR'2 ENCL 45
/4 'i, N
<<1 lb' F
Ã
~
rt
~
444
~
~
'4 f, ~
N bN
~
II
~ 44
'l',N,
'b
~
4 f1 A, 'kr(
I bl 4 4
e I ~
e
~
N.
b~
N N
N I'lS' "g
) ') '
Areal b'
l brf,
((
kb 4<<1 I
II ~
g NNI Ns k,
Nf A 11 b
I<<l
tt
% Crt Vtt 1<<
I
'bcf e
(
N b'll iIO Ib
,f
)44 44 f 4
4I r(
g"'
I l4
~ Nb<<~<<tb( <k irr'r'
'.lrb 'I ','ib f' b'b N
li "V
r'I bi f II',I i A.
4 Il i*
II ti bf N,
~
bile i g,(
bi lr 4
4 il Ik ilf Ib I
4 i ~a I I
rb
<<4 I
<<IN4, s
I NI F
4 I
1,
,,A
,kb 4
Engineering Verification Task Force Ebasco Services IncorPorated Two World Trade Center 15th Floor New York, N. Y.
10048 December 22, 1982 Ltr No. EVP-135/SL-2 Office of Nuclear Reactor Regulation Attention:
Mr Darrell G Eisenhut, Director Division of Licensing U
S Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr Eisenhut:
Re:
ST.
LUCIE UNIT NO.
2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM MINUTES OF MEETING Attached for your information are the minutes of the EVP Review Committee final meeting held December 15, 1982 in Bethesda, Maryland.
Very truly yours, THB/sac Attachment cc:
Robert E Uhrig, FPL, w/att D L Christian, FPL, w/att E
W Dotson, FPL, w/att
'E Z Zuchman,
- Ebasco, w/att J
C Moulton, C-E, w/att D D Miller, C-E, w/att T H Blodgett,
- Ebasco, w/att T H Blodgett Joint Task Force Chairman 82i2280405 82i222 PDR ADOCK 05000389 A
ENGINEERING VERIFICATION PROGRAM SL2 EVP REVIEW COMMITTEE MEETING DATE:
December 15, 1982 E
LOCATION:
Combustion Engineering's
- Bethesda, Maryland Office The Engineering Verification Program Review Committee (EVPRC) held its final meeting in C-E's Triangle Towers" office, Bethesda, Maryland on December 15 with the following in attendance:
PSL-2 Pro'ect EVP Task Force Mana ers E
W Dotson (FPL)
(*)
J C Moulton (C-E)
(*)
E 2 Zuchman (Ebasco)
(*)
G W Pangborn (C-E)
R J Stevens (FPL)
D C Baker (FPL)
D L Christian (FPL)
(*)
D D Miller (C-E)
(*)
T H Blodgett (Ebasco)
(*)
Nuclear Re ulator Commission V Nerses (NRR/LBQ3)
H L Brammer (MEB)
T M Novak (NRR/DL)
J Rayan (DE)
(*) Member of.EVPRC A.
All remaining open unresolved item (discrepancy) reports from the independent design review (Phase I)>> field installation verification (Phase II), and start-up operation verification (Phase III) were addressed by the EVPRC.
As in previous
- meetings, the resolutions were documented on the individual reports (UIR for Ebasco and EVP-U for C-E).
B.
In'ummary, a total of 56, UIRs and 28 EVP-U reports were prepared by the Task Force during the engineering verification program.
Seven UIRs and one EVP-U were classified by the EVPRC as observations and transmitted to the Project Team for action.
The remaining 49 UIRs and 27 EVP-U reports were resolved and recorded as closed out.
C.
A discussion of the Final Report draft was held, including a determination of how it would be submitted to the NRC.
(A draft package was delivered to NRC December 17)
D.
The Task Force is essentially disbanded as of December 17, 1982 to assume other assignments in the respective organizations.
- However, the Task Force Managers will remain until the Final Report is issued and will be on call to respond as required.