Forwards Joint Ebasco & C-E Engineering Verification Program Weekly Status Summary for 821101-06
ML17213A687
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/05/1982
From: Blodgett T
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-125-SL-2, NUDOCS 8211110304
Download: ML17213A687 (9)


Text

p@rcf REGULATOR >FORMATION DISTRIBUTION M (BIDS)

ACCES6ION NBR:8211110300 DOC ~ DATE: 82/11/05 NOTARIZED: NO DOCKET FACIL50"389 St, Lucie Planti Unit 2< Florida Power 8 Light Co>> 05000389 AUTH ~ NAME AUTHOR AFFILIATION BLODGETTiT,HE BLODGETTiT,H.

Ebasco Servicesi Inc, (sub'f Combustion Engineeringi Inc.,

Enserch Corp,)

RECIP.NAME RECIPIENT AFFILIATION EISENHUTrD.G. Division of Licensing

SUBJECT:

Forwards Joint Ebasco L C E engineering verification program weekly status summary for 821101 06 CODE: 8001S COPIES RECEIVED;LTR 'ISTRIBUTION ENCL SIZE:

TITLE: Licensing Submittal: PSAR/FSAR Amdts L Related Correspondence NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A/D LI GENS NG 1 0. LIC BR P3 BC '

0 LIC BR P3 LA 1 0 NERSES g V, 01, 1 1 INTERNAL: ELD/HDS2 1 0 IE FILE 1 1 IE/DFP EPDS 35 IE/DEP/EPLB 36 3 3 NRR/DE/AEAB 1

1 1

0 NRR/DE/CEB NRR/DE/GB il 28 1

1' NRR/DE/EQB 13 2 2 NRR/DE/HGEB 30 1 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 2A 1 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFEBQO 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 3Q 1 1 NRR/DL/SSPB 1 0 NRR/DSI/AEB 26, 1 NRR/DS I/CPB 10 1 1 NRR/DSI/CSB 09 1 1 NRR/DS I/ETSB 12 1 1 NRR/DSI/ICSB 16 1 NRR/DS I/PSB 19 1 1 NRR/DSI/RAB 22 1 1 NRR/DS I/RSB 23 1, 1 LE 00 1 RGN? 3 3 AMI/MIB 1 0 EXTERNAL'CRS 01 6 6 BNL(AMDTS ONlY)

DMB/DSS (AMDTS) 1 1 FEMA RFP DIV 39 LPDR 03 1 1 NRC PDR 02 NSIC 05 1 1 NTIS TOTAL NUMBER OF COPIES REQUIRED'TTR 52 ENCL .45

g3,,'I t ~ I" MA 47hf,4 If ,>>ll M h>> >> C "t , I t g tttih,>> hht>>44I4t IL C

t II M t$

~l A>>3 t I'p i1 i," M t $ 1'M,>> "M>>r ~ >> III g'>> >AM>> t'444>> 'hil, Mr'I') I C, '14 t 14>>MM If I'g M IIII Ill g Alh g>>)T i I Mft,,rl JC lI IC I g 1130'4 I >>k>>A l'jh>>') C

+ g 't )(M 4 II Il rf,>>,3h I II>' 1

arf It 3C'AC3,, 'r>M>>,,>

<<<<4~<< 1'4, 4 W ~

'A4)>>"'

w~ AMM,

>>,IJ>>l 4 f'Art>>A $ I, ii'r'3 I'l'<<

(

g II.V W

I 'hg I

hl j 'IA.

rhr h,l il Q P'

Fr >

r 41 I l tg Ii",MM fj 4

Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center-15th Floor New York, N. Y. 10048 November 5,1982 Ltr No. EVP-125/SL-2 Office of Nuclear Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr Eisenhut:

Re: ST. LUCIE UNIT N0.2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD NOVEMBER'1-NOVEMBER 6 1982 Attached for your information is the Weekly Status Summary of the joint Ebasco and Combustion Engineering Task Force for the period Novemberl'through November 6, 1982.

Very truly yours, shiit'8 T H Blodgett Joint Task Force Chairman THB/rob Attachment i'c:

Robert E Uhrig, FPL w/att D L Christian, FPL w/att 82iii10304 82ii05 PDR ADOCK (~

R 05000389 PDR

~

l

~

C'

ENGINEERING VERIFICATION PROGRAM/SL-2 EBASCO TASK FORCE WEEKLY STATUS SUKfARY FOR PERIOD NOVEMBER 1-NOVEMBER 6,1982

1. Status of inde P endent vs existi ng design comparisons for verification items 3-8:
a. "Item 3 Cntrl Rm Emergency Cleanu System Valve
1) Additional existing design information received Nov 2 and 3 from Project Team, with further electrical documentation still due. P HVAC and I&C comparison sheets complete.
3) Electrical comparison essentially complete.
4) Applied Physics comparison. expected complete Nov 9.
b. Item 4 H dro en Recombiner
1) Additional existing electrical design information received Nov 3 in response to Nov' request.
2) Radwaste and Electrical comparison sheets expected complete Nov 9.
3) Civil, I&C, HVAC and Applied Physics comparisons complete.

C~ Item 5 Area Radiation Monitor Civil comparison sheets

')

I&C and complete.

2) Electrical and Appl'ied Physics comparisons expected 'complete Nov 11.
d. Item 6 Tornado MissileAhield Door
1) Received more existing design information Nov 2 and 4 from Project Team. Continuing strong expediting efforts for receipt of balance of requested information.
2) If the remaining needed information is received early next period, estimate that Civil, I&C, and Plant Security comparisons will be completed by Nov 13; Item 7 Main'team Isolation Valve
1) Partial receipt of existing design information from Project Team occured on Oct 20 and 21.
2) Strong expediting efforts for 'receipt of balance of requested information have met with no success to date..
3) Best estimate for completion of design comparison is Nov 15, contingent upon early receipt of remaining information from Project Team.

Item 8 HEPA Filter for ECCS Area Ventilation S stem

1) HVAC comparison sheets essentially ccmplete.
2) I&C comparison complete.
3) Applied Physics comparison expected complete Nov 10.

Additional existing design information requested Nov 5 expected Nov 8

Status of work to be performed by ETF as interface with O'-E Task Force--

re expansion of component boundaries for, verification items 1 and 2:

a. . Item 1 HPSI Pum
1) The Elementary Wiring Diagram, received from C-E Task Force on Nov 3 in Windsor, is being reviewed by the ETF.
2) Information requested via Oct 29 letter EVP 3164L-2 received in part on Nov 5.,
3) Completion of. the design-related phase of this additional engineering verification work by the ETF is tentatively scheduled for Nov 16.
b. Item 2 SIT Isolation Valve
1) ETF questions pertaining to the Elementary Wiring Diagram have been resloved with C-E Task Force.
2) I&C pnd Electrical design phase completions by -the ETF are projected for. Nov 12 and 15 respectively.

A meeting of the FPL, C-E and Ebasco EVP .Task Force Managers was held Nov 3 in Windsor Conn. to review program status and discuss schedule.

I&C discipline work was active on Saturday, Nov 6.

ENGINEERING VERIFICATION PROGRAM/SL-2 C-E TASK FORCE WEEKLY STATUS SUGARY NOVEMBER 1-NOVEMBER 5,1982

1. The Elementary Wiring Diagram (EWD) for EVP Item 1-.(HPSI Pump) was and forwarded to Eb'asco Task Force on 11/3/82. This drawing, pump control design requirements forwarded earlier, will

'ompleted

, along with comprise C-E engineering interface input to the Instrumentation & Control wiring diagrams being produced by the Ebasco Task Force.

2. The C-E Task Force responded to several Ebasco telephone questions regarding the EWD 'previously supplied as EVP Item 2-(SIT Isolation Valve) interface information. A revised drawing and C-E Task Force written responses were forwarded as confirming documentation.
3. The EVP Final Report outline was,discussed at the November 3 EVP Task Force Managers'eeting. Ebasco Task Force comments were incorporated into a revisedoutline.
4. Comparison of EVP Item 1 independent design package with- existing design continues. Completion of design comparison is targeted for November 10.

However, some existing design information has not yet been received.

5. C-E Task Force engineers are preparing detailed check lists for on-site verification of EVP Items 1 and 2. On-site engineering, verification work should start during,,the week beginning November 29. ',

CJ ~ in TELEPHONE CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM - SL2 WEEK OF, 11-1-82 DATE OF PARTICIPATING GENERAL SUBJECT PREPARER OF TELECON ORGANIZATIONS OF TELECON TELECON RECORD November 4 C-E/Ebasco SIT Isolation Valve C-E EVP Task interface info Force Mgr November 4 Ebasco/C-E SIT Isolation Valve Ebasco EVP Task interface info Force Mgr November 5. FPL/C-E Administrative and C-E EVP Task Task Force independence Force Mgr November 5 C-E/Ebasco Administrative details C-E EVP Task Force Mgr

~ ~ ~

~ ~ ~ J ~.