Text
DOCKET 05000389 NOTES:
p@rcf REGULATOR
>FORMATION DISTRIBUTION M (BIDS)
ACCES6ION NBR:8211110300 DOC ~ DATE: 82/11/05 NOTARIZED:
NO FACIL50"389 St, Lucie Planti Unit 2< Florida Power 8 Light Co>>
AUTH ~ NAME AUTHOR AFFILIATION BLODGETTiT,HE Ebasco Servicesi Inc, (sub'f Enserch Corp,)
BLODGETTiT,H.
Combustion Engineeringi Inc.,
RECIP.NAME RECIPIENT AFFILIATION EISENHUTrD.G.
Division of Licensing
SUBJECT:
Forwards Joint Ebasco L
C E engineering verification program weekly status summary for 821101 06
'ISTRIBUTION CODE:
8001S COPIES RECEIVED;LTR ENCL SIZE:
TITLE: Licensing Submittal:
PSAR/FSAR Amdts L Related Correspondence RECIPIENT ID CODE/NAME A/D LI GENS NG LIC BR P3 LA COPIES LTTR ENCL 1
0.
1 0
RECIPIENT COPIES ID CODE/NAME LTTR ENCL LIC BR P3 BC 0
NERSES g V, 01, 1
1 INTERNAL: ELD/HDS2 IE/DFP EPDS 35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 2A NRR/DHFS/HFEBQO NRR/DHFS/OLB 3Q NRR/DSI/AEB 26, NRR/DSI/CSB 09 NRR/DSI/ICSB 16 NRR/DSI/RAB 22 LE 00 AMI/MIB EXTERNAL'CRS 01 DMB/DSS (AMDTS)
LPDR 03 NSIC 05 1
0 1
1 1
0 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 0
6 6
1 1
1 1
1 1
IE FILE IE/DEP/EPLB 36 NRR/DE/CEB il NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/CPB 10 NRR/DS I/ETSB 12 NRR/DS I/PSB 19 NRR/DS I/RSB 23 RGN?
BNL(AMDTS ONlY)
FEMA RFP DIV 39 NRC PDR 02 NTIS 1
1 3
3 1
1' 2
1 1
1 1
1 1
1 1
1 0
1 1
1 1
1 1
1, 1
3 3
TOTAL NUMBER OF COPIES REQUIRED'TTR 52 ENCL
.45
47hf,4 If
~l A>>3 t I'p i1 i,"
M t
,>>ll M
h>>
>> C "t
$ 1'M,>>
"M>>r g3,,'I
, I t g
tttih,>>
hht>>44I4t t
II
~
III g'>>
>AM>> t'444>>
Mr'I')
I C,
'14 t 14>>MM If I'g M IIII Ill g Alh g>>)T I Mft,,rl JC lI IL C
M IC t
~
I" MA t$
'hil, i
I g
1130'4 I
>>k>>A l'jh>>') C + g 't
)(M 4
II Il rf,>>,3h I
II>'
1
arf It 3C'AC3,,
'r>M>>,,>
AMM, 1'4, 4
W <<<<4~<< ~ w~
'A4)>>"'
>>,IJ>>l 4 f'Art>>A $
ii'r'3I, I'l'<<
(
g II.V W
I 'hg P'
rhr Fr r
il Q 41 I
tg Ii",MM l
fj h,l I
hl j 'IA.
4
Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center-15th Floor New York, N. Y. 10048 November 5,1982 Ltr No. EVP-125/SL-2 Office of Nuclear Regulation Attention:
Mr Darrell G Eisenhut, Director Division of Licensing U
S Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr Eisenhut:
Re:
ST.
LUCIE UNIT N0.2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS
SUMMARY
FOR PERIOD NOVEMBER'1-NOVEMBER 6 1982 Attached for your information is the Weekly Status Summary of the joint Ebasco and Combustion Engineering Task Force for the period Novemberl'through November 6, 1982.
Very truly yours, shiit'8 T H Blodgett Joint Task Force Chairman THB/rob Attachment i'c:
Robert E Uhrig, FPL w/att D L Christian, FPL w/att 82iii10304 82ii05
(~
PDR ADOCK 05000389 R
l~~
C'
ENGINEERING VERIFICATION PROGRAM/SL-2 EBASCO TASK FORCE WEEKLY STATUS SUKfARY FOR PERIOD NOVEMBER 1-NOVEMBER 6,1982 1.
Status of inde endent vs existi P
ng design comparisons for verification items 3-8:
a.
"Item 3 Cntrl Rm Emergency Cleanu System Valve 1)
Additional existing design information received Nov 2 and 3
from Project Team, with further electrical documentation still due.
P HVAC and I&C comparison sheets complete.
3)
Electrical comparison essentially complete.
4)
Applied Physics comparison. expected complete Nov 9.
b.
Item 4 H dro en Recombiner 1)
Additional existing electrical design information received Nov 3 in response to Nov' request.
2)
Radwaste and Electrical comparison sheets expected complete Nov 9.
3)
Civil, I&C, HVAC and Applied Physics comparisons complete.
C ~
Item 5 Area Radiation Monitor
')
I&C and Civil comparison sheets complete.
2)
Electrical and Appl'ied Physics comparisons expected 'complete Nov 11.
d.
Item 6 Tornado MissileAhield Door 1)
Received more existing design information Nov 2 and 4 from Project Team. Continuing strong expediting efforts for receipt of balance of requested information.
2)
If the remaining needed information is received early next period, estimate that Civil, I&C, and Plant Security comparisons will be completed by Nov 13; Item 7 Main'team Isolation Valve 1)
Partial receipt of existing design information from Project Team occured on Oct 20 and 21.
2)
Strong expediting efforts for 'receipt of balance of requested information have met with no success to date..
3)
Best estimate for completion of design comparison is Nov 15, contingent upon early receipt of remaining information from Project Team.
Item 8 HEPA Filter for ECCS Area Ventilation S stem 1)
HVAC comparison sheets essentially ccmplete.
2)
I&C comparison complete.
3)
Applied Physics comparison expected complete Nov 10.
Additional existing design information requested Nov 5 expected Nov 8 Status of work to be performed by ETF as interface with O'-E Task Force--
re expansion of component boundaries for, verification items 1 and 2:
a.
. Item 1 HPSI Pum 1)
The Elementary Wiring Diagram, received from C-E Task Force on Nov 3 in Windsor, is being reviewed by the ETF.
2)
Information requested via Oct 29 letter EVP 3164L-2 received in part on Nov 5.,
3)
, Completion of. the design-related phase of this additional engineering verification work by the ETF is tentatively scheduled for Nov 16.
b.
Item 2 SIT Isolation Valve 1)
ETF questions pertaining to the Elementary Wiring Diagram have been resloved with C-E Task Force.
2)
I&C pnd Electrical design phase completions by -the ETF are projected for. Nov 12 and 15 respectively.
A meeting of the FPL, C-E and Ebasco EVP.Task Force Managers was held Nov 3 in Windsor Conn. to review program status and discuss schedule.
I&C discipline work was active on Saturday, Nov 6.
ENGINEERING VERIFICATION PROGRAM/SL-2 C-E TASK FORCE WEEKLY STATUS SUGARY NOVEMBER 1-NOVEMBER 5,1982 1.
The Elementary Wiring Diagram (EWD) for EVP Item 1-.(HPSI Pump) was
'ompleted and forwarded to Eb'asco Task Force on 11/3/82. This drawing,
, along with pump control design requirements forwarded earlier, will comprise C-E engineering interface input to the Instrumentation
& Control wiring diagrams being produced by the Ebasco Task Force.
2.
The C-E Task Force responded to several Ebasco telephone questions regarding the EWD 'previously supplied as EVP Item 2-(SIT Isolation Valve) interface information.
A revised drawing and C-E Task Force written responses
, were forwarded as confirming documentation.
3.
The EVP Final Report outline was,discussed at the November 3 EVP Task Force Managers'eeting.
Ebasco Task Force comments were incorporated into a revisedoutline.
4.
Comparison of EVP Item 1 independent design package with-existing design continues.
Completion of design comparison is targeted for November 10.
- However, some existing design information has not yet been received.
5.
C-E Task Force engineers are preparing detailed check lists for on-site verification of EVP Items 1 and 2. On-site engineering, verification work should start during,,the week beginning November 29. ',
CJ
~in TELEPHONE CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM - SL2 WEEK OF, 11-1-82 DATE OF TELECON PARTICIPATING ORGANIZATIONS GENERAL SUBJECT OF TELECON PREPARER OF TELECON RECORD November 4
November 4
November 5.
November 5
C-E/Ebasco Ebasco/C-E FPL/C-E C-E/Ebasco SIT Isolation Valve interface info SIT Isolation Valve interface info Administrative and Task Force independence Administrative details C-E EVP Task Force Mgr Ebasco EVP Task Force Mgr C-E EVP Task Force Mgr C-E EVP Task Force Mgr
~ ~ ~
~
~
~
J ~.