REGULAT INFORMATION DISTRIBUTIO 'STEM (RIDS)
AOCESSION NBR:8?08030296 DOC ADA'TE! 82/07/28 NOTARIZED!
NO FACIL:50 389 St. Lucie Planti Unilt 2i Florida Power 8 Light Co ~
'AUTH.NAME AUTHOR AFFILIATION, BLODGETTETOH, Ebasco Servicesi Inc, (subs, of 'Enserch 'Corp,)
'RBCIP ~ NAME RECIPIENT AFFILIATION EISENHUTED.G.
Division of Licensing
SUBJECT:
Forwards weekly Istatus summa y of 'Joint Ebasco 8,
0 E
engineering verification task force for 820719 23.
OISTRISUTION CODE:
SOOIS COPIES iRECEIVED:LTR 'ENCL J SIZE:.
TITLE: PSAR/FSAR AMDTS and Rel ated Corr espondence NOTES:
DOCKET 05000389 RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR ¹3 LA INTERNAL: ELD/HDS2 IE/DEP EPDS 35 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DSI/A'SB 27 NRR/DSI/CS8 09 NRR/DSI/ItCSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN2 EXTERNAL: ACRS 41 DMB/DSS (AMDTS)
LPDR 03 NSIC 05 COPIES LTTR ENCL 1
0 1
0 1
0 1
1 1
1 2
?
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1
?
'2 10 10 1
1 1
1 1
1 RECIPIENT ID CODE/NAME LIC BR ¹P BC NERSES E Y ~
0 1 IE FILE IE/DEP/EPLB 36 NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEBOO NRR/DHFS/OLB 34 NRR/DS I/AEB 26 NRR/DSI/OPB 10 NRR/DSI/ETSB 12 NRR/DS I/PSB 19 NR RSB 23 G FILE 04
/MI8 BNL(AMDTS ONLY)
FEMA~REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1
0 1
1 1
1 3
3 3
3
'2
?
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 0
1 1
1 1
1 1
1 1
TOTAL NUMBER OF COPIES REQUIRED:
LRTTR 58 ENCL 53
6
~
p
)
II I
Engineering Verification Task ce Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y.
10048 July 28, 1982 Ltr. No. EVP-100/SL-2 Office of Nuclear Reactor Regulations Attention:
Mr Darrell G Eisenhut, Director Division of Licensing U
S Nuclear Regulatory Commission Washington, D C 20555
Dear Mr Eisenhut:
Re:
ST. LUCIE UNIT NO.
2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS
SUMMARY
FOR PERIOD JULY 19 JULY 23, 1982 Attached for your information is the Weekly Status Summary of the Joint Ebasco and Combustion Engineering Task Force for the period July 19 through July 23, 1982.
Very truly yours, T H Blodgett Joint Task Force Chairman THB:ggv Attachment cc:
Robert E Uhrig, FPL D L Christian, FPL w/attach.
w/attach.
820803029h 820728 PDR ADOCK 05000389 I
ENGINEERING VERIFICATION PROGRAM SL2 EBASCO TASK FORCE WEEKLY STATUS
SUMMARY
FOR PERIOD JULY 19 JULY 23, 1982 The following activities were underway during the period July 19 through July 23, 1982:
1 The list of eight (8) specific i.tems to be verified was given to the Ebasco and C-E Task Force Mgrs during a conference call with the EVP Coordinator on July 19.
2 The Ebasco Task Force has moved into its quarters on the 15th floor of Ebasco's corporate offices at
- 2WTC, New York, NY.
3 Work has started on determination of design inputs needed for the design review phase of the program and establish-ing item boundaries.
4 The initial request for information was transmitted to the EVP Coordinator on July 23.
C-E ENGINEERING VERIFICATION TASK FORCE/St. Lucie 2
WEEKLY STATUS
SUMMARY
July 19 July 23 Hi hli hts Arrangements were completed for a separate Windsor work facility to be occupied by C-E Engineering Task Force personnel while assigned to this program.
The office facilities, consisting of three office trailers, were completed and occupied during this report period.
On Monday, July 19, the specific items to be verified were selected by FP&L during a joint telephone conference between the Ebasco and C-E Task Force managers and the FP&L program coordinator.
Upon selection of verification items the final stage of requisitioning qualified C-E task force engineers was begun and will continue through the next report period.
Status A C-E program administrative pro'cedure (EVP Procedure No. 1) was completed in order to coordinate activities between all parties.
A C-E program technical procedure will be completed during the next report period.
Component-specific boundary sketches are in preparation for review at a Joint Task Force meeting on July 27.
Formal requests for design inputs are being prepared for transmittal to the project teams through the FP&L coordinator.
~O t
~
~
TELEPHONE:CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM SL2 WEEK OF 07/19/82 DATE OF TELECON PARTICIPATING ORGANIZATIONS GENERAL SUBJECT OF TELECON PREPARER OF TELECON RECORD July 19*
July 19*
FPL/C-E/Ebasco FPL/Ebasco Selection of items to be verified by Task Force; schedule joint meeting for July 27.
Items to be verified by Task Force Ebasco EVP Task Force Mgr.
Ebasco EVP Task Force Mgr.
- (One recor for both telecons)
)0 k
C b
E I
'I