ML17212B774

From kanterella
Jump to navigation Jump to search
Forwards Weekly Status Summary of Joint Ebasco & C-E Engineering Verification Task Force for 820719-23
ML17212B774
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/28/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-100-SL-2, NUDOCS 8208030296
Download: ML17212B774 (8)


Text

REGULAT INFORMATION DISTRIBUTIO 'STEM (RIDS)

AOCESSION NBR:8?08030296 DOC ADA'TE! 82/07/28 NOTARIZED! NO DOCKET FACIL:50 389 St. Lucie Planti Unilt 2i Florida Power 8 Light Co ~ 05000389

'AUTH. NAME AUTHOR AFFILIATION, BLODGETTETOH, Ebasco Servicesi Inc, (subs, of 'Enserch 'Corp,)

'RBCIP ~ NAME RECIPIENT AFFILIATION EISENHUTED.G. Division of Licensing

SUBJECT:

Forwards weekly Istatus summa y of 'Joint Ebasco 8, 0 E engineering verification task force for 820719 23.

OISTRISUTION CODE: SOOIS COPIES iRECEIVED:LTR 'ENCL J SIZE:.

TITLE: PSAR/FSAR AMDTS and Rel ated Corr espondence NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A/D LICENSNG 1 0 LIC BR ¹P BC 1 0 LIC BR ¹3 LA 1 0 NERSES E Y~ 0 1 1 1 INTERNAL: ELD/HDS2 1 0 IE FILE 1 1 IE/DEP EPDS 35 1 1 IE/DEP/EPLB 36 3 3 NRR/DE/CEB 11 1 1 NRR/DE/EQB 13 3 3 NRR/DE/GB 28 2  ? NRR/DE/HGEB 30 '2  ?

NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/QAB 21 1 NRR/DE/SAB 24 1 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFEBOO 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 34 1 1 NRR/DHFS/PTRB20 1 1 NRR/DS I/AEB 26 1 1 NRR/DSI/A'SB 27 1 1 NRR/DSI/OPB 10 1 NRR/DSI/CS8 09 1 1 NRR/DSI/ETSB 12 1 1 NRR/DSI/ItCSB 16 1 1 NRR/DS I/PSB 19 1 NRR/DS I/RAB 22 1 1 NR RSB 23 1 1 NRR/DST/LGB 33 1 1 G FILE 04 1 1 RGN2  ? '2 /MI8 1 0 EXTERNAL: ACRS 41 10 10 BNL(AMDTS ONLY) 1 1 DMB/DSS (AMDTS) 1 1 FEMA~REP DIV 39 1 1 LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05 1 1 NTIS 1 1 TOTAL NUMBER OF COPIES REQUIRED: LRTTR 58 ENCL 53

6

~ p ) II I

Engineering Verification Task ce Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y. 10048 July 28, 1982 Ltr. No. EVP-100/SL-2 Office of Nuclear Reactor Regulations Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D C 20555

Dear Mr Eisenhut:

Re: ST. LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD JULY 19 JULY 23, 1982 Attached for your information is the Weekly Status Summary of the Joint Ebasco and Combustion Engineering Task Force for the period July 19 through July 23, 1982.

Very truly yours, T H Blodgett Joint Task Force Chairman THB:ggv Attachment cc: Robert E Uhrig, FPL w/attach.

D L Christian, FPL w/attach.

820803029h 820728 PDR ADOCK 05000389 I PDR

ENGINEERING VERIFICATION PROGRAM SL2 EBASCO TASK FORCE WEEKLY STATUS

SUMMARY

FOR PERIOD JULY 19 JULY 23, 1982 The following activities were underway during the period July 19 through July 23, 1982:

1 The list of eight (8) specific i.tems to be verified was given to the Ebasco and C-E Task Force Mgrs during a conference call with the EVP Coordinator on July 19.

2 The Ebasco Task Force has moved into its quarters on the 15th floor of Ebasco's corporate offices at 2WTC, New York, NY.

3 Work has started on determination of design inputs needed for the design review phase of the program and establish-ing item boundaries.

4 The initial request for information was transmitted to the EVP Coordinator on July 23.

C-E ENGINEERING VERIFICATION TASK FORCE/St. Lucie 2 WEEKLY STATUS

SUMMARY

July 19 July 23 Hi hli hts Arrangements were completed for a separate Windsor work facility to be occupied by C-E Engineering Task Force personnel while assigned to this program.

The office facilities, consisting of three office trailers, were completed and occupied during this report period.

On Monday, July 19, the specific items to be verified were selected by FP&L during a joint telephone conference between the Ebasco and C-E Task Force managers and the FP&L program coordinator.

Upon selection of verification items the final stage of requisitioning qualified C-E task force engineers was begun and will continue through the next report period.

Status A C-E program administrative pro'cedure (EVP Procedure No. 1) was completed in order to coordinate activities between all parties. A C-E program technical procedure will be completed during the next report period.

Component-specific boundary sketches are in preparation for review at a Joint Task Force meeting on July 27.

Formal requests for design inputs are being prepared for transmittal to the project teams through the FP&L coordinator.

t

~O

~

~ TELEPHONE:CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM SL2 WEEK OF 07/19/82 DATE OF PARTICIPATING GENERAL SUBJECT PREPARER OF TELECON ORGANIZATIONS OF TELECON TELECON RECORD July 19* FPL/C-E/Ebasco Selection of items Ebasco EVP to be verified by Task Force Mgr.

Task Force; schedule joint meeting for July 27.

July 19* FPL/Ebasco Items to be verified Ebasco EVP by Task Force Task Force Mgr.

  • (One recor for both telecons)

b

)0 k C

E I 'I