Text
REGULATOR NFO TION DISTRIBUTION TEM IDS)
DOCKET ¹ 05000389 NOTES:
AGCBSS10N NBR!8211020035 DOCeDATE: 82/10/28 NOTARIZED:
NO FACIL:50-389 St, Lucie Planti Unit 2< Florida Power 8 Light Cp.
AUTH,NAME AUTHOR AFFILIATION BLOOGETTiT.H.
Ebasco Servicesi Inc.
(subs, of Enserch Corp,)
REC?P e NAME RECIPIENT AFFILIATION EISENHUTrD,G, Division of Licensing
SUBJECT:
Forwards minutes of Engineering Verification Program Task
,, Force Managers 821021 meeting w/ut.il L
C.
E in New YorkiNY~
DISTRIBUTION CODE:
'8001S COPIES RECEIVED:LTR g ENCL, SIZEe.
I
/
. 3 TITLE Licensing Submi t ta1:
PSAR/FSAR Amdts 8, Rel ated Corr espondence-RECIP IFNT ID CODE/NAME A/D LICENSNG LIC BR ¹3 LA INTERVAL: ELD/HDS2 IE/DEP EPDS 35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 20 NRR/DHFS/HFEBPO NRR/DHFS/OLB 34 NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DS I/ETSB 12
'RR/DSI/PSB 19
/RSB 23 F
L Off
~t
/MIB EXTERNAL: ACRS 41 DMB/DSS (AMDTS)
LPDR 03 NSIC 05 COPIES LTTR ENCL 1
0 0
1 0
1 1
0 3
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 0
6 6
1 1
1 1
1 1
RECIPIENT ID CODE/NAME LIC BR ¹3 BC NERSEStY ~
01 IE FILE XE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DS I/CSB 09 NRR/DS I/ICSB 16 NRR/DS I/PAB 22 NRR/DST/LGB 33 RGN?
BNL(AMDTS ONLY)
'2 NTIS COPIES LTTR ENCL 1
0 1
1 1
1 3
3 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
'1 1
2 2
1 1
1 1
1 1
1 1
.TOTAL NUMBER OF COPIES REQUIRED; LTTR 55 ENCL 09
'>>WAIF,Y>>T 1
1(
V<< l IFI Sf<<
~
f I
~
( ~ 'j'I I
I j(F>> ')r<<(((
e 4<
o
~
f fl I )ll
~ I t(i
<<J'" y') I i(jI Wt gg g)
I l,t j'<<>>Ir, rt I,I f I
<> f )Ih I(
<<r<<(~
l I 'I
~
~
I h W I l 1'<<
Il NJI k
I )~>>
<<ThjI", <,f i f>af>r a
I hr I'eft fI )
fV f r $ IIh<<.(
rjl>>$ f
- l
> t<.I>> f>>;
l(
FJ A,I('I FJ '1 WI I f (Q 'I'<<ll
((I 1'j I,)
$ FI g)'i<I+
F'rg<FII'$
l('W
)
((
$ j WJ(tg If~T<<$
- .'Wl<C.J )
h
'l<
l (t
Of( '<gf j<'r
(">>Wf<<',h jrtf 3
<(
J lflI
~>>r I) )v>>
$'f ((.I F
Jk tt (Y>( "( I' W
lI <
"F h ] 'j I hf
Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center-15th Floor New York, N. Y. 10048 October 28,1982 Ltr No. EVP-123/SL-2 Office of Nuclear Reactor Regulation Attention:
Mr Darrell G Eisenhut, Director Division of Licensing U
S Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr Eisenhut:
Re:
ST. LUCIE UNIT NO.
2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM MINUTES OF MEETING Attached for your information are the minutes of the October 21,1982 meeting attended by the FPL, C-E and Ebasco Task Force Managers in New York.
Very truly yours, T H Blodgett Joint Task Force Chairman THB/rob Attachment cc:
Robert E Uhrig, FPL w/att D L Christian, FPL w/att got I
PDR ADOCK 050003
Sh 1 of 2 ENGINEERING VERIFICATION PROGRAi~f-SL2 EVP TASK FORCE IfANAGERS MEETXNG DATE: October 21,1982 LOCATION: Ebagco Services Incorporated Office, New York, N. Y.
ATTENDEES:
Florida Power 6 Li ht Com an D L Christian EVP Task Force Manager Combustion En ineerin Inc D D Miller EVP Task Force Manager Ebasco Services Incor orated T H Blodgett EVP Task Force Man~ger DESIGN REVIEW PHASE
- 1. VERIFICATION ITEMS 1 -2 (C-E)
- a. Continuing comparison of independent and existing designs for Item 2 (SIT Isolation Valve).
- b. Awaiting existing design information from Project Team necessary to start comparison with independent design for Item 1
(HPSX Pump).
(Note Partial receipt later on Oct 21).
Status of additional workscope/C-E and Ebasco Task Force interface:
- 1) ETF is determining actual extent of I 6 C, electrical,i civil, and stress analysis interface inputs it will provide due to expansion of the component boundaries.
- 2) The elementary wiring diagram generated by the C-E Task Force for Item 2 has been transmitted to the ETF (hand-deliv'ered by Mr Miller at the meeting).
- 3) Written authorization for the ETF to proceed with this additional work was provided by Mr Christian via letter dated Oct 20.
2.
VERXFXCATION ITEMS 3 8 (EBASCO)
- a. Expect comparison of independent vs existing designs to be completed during week of Oct 25 for Items 3 and 4 (Cntrl Rm Fmergency Cleanup System Valve and the Hydrogen Recombiner).
- b. Design comparisons were started during week of Oct 18 for Items 5 and 8 (Area Radiation Monitor and HEPA Filter).
The Project Team was authorized Oct 13 to release existing designs to the ETF. Not all the requested Item 8 existing design documents
.have been received.
c.
Project Team was authorized Oct 20 to release existing designs to ETF for Items 6 and 7 (Tornado Missile Shield Door and Main 'Steam Xsolation Valve).
She
. 2 of 2
3.
REVIEM COMMITTEE ACTION a.
Review Committee action will be required, per EVP procedures,
+or resolution of any differences resulting from comparison of independent and existing designs for a specific item which cannot be resolved by the Task Force.
b.
The possibility of addressing all such unresolved'tems at a single Review Committee meeting was discussed.
No decision was'ade since design comparison activities have not been completed for any of the eight items, and there is no way to estimate the number of differences which may require Review Committee action to resolve.
B.
I'IELD INSTALLATIONVERIFICATION PHASE 1.
Schedule for the on-site verification work was discussed.
2.
The earliest possible time period for this work also taking into account scheduled testing activities by others at the Site appears to be November 8-20. Every effort will be made to complete the on-going independent design review phase of the program accordingly.
3.
Electrical and I&C field installation verification activities with respect to the two C-E items will be handled by the ETF as part of the C-E/Ebasco interface.
4.
The C-E Task Force has started preparation of basic field verification spread sheets for items 1 and 2.
C.
HISCELLANEOUS 1.
FINAL REPORT Hr Hiller was assigned responsibility for coordinating the EVP Joint Task Force Final Report, and will prepare a format outline for review/comments.
A December 17 target date was set for Final Report completion.
2.
UPCOMING MEETINGS The next meeting of the Task Force Managers'as tentatively scheduled for November 4 in Windsor.
I n