ML17213A402

From kanterella
Jump to navigation Jump to search
Forwards Minutes of 820826 Meeting W/Util & C-E in Juno Beach,Fl Re Engineering Verification Program.Next Meeting Tentatively Scheduled for 820908
ML17213A402
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/31/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-109-SL-2, NUDOCS 8209030314
Download: ML17213A402 (7)


Text

REGULATOR NFORMATION DISTRIBUTION S EM (RIDS)

'ACCESSION NBR; 8209030314 DOC ~ DATE! 82/08/31 NOTARIZED: NO DOCKET '0 FAOIL!50 389 "St, Lucie Plant~ Unilt '2< Flor ida .Power 8 Light Co. 05000389 AUTH ~ NAME AUTHOR AFFILIATION BLODGEH<T.H, Ebasco Services~ Inc, (subs, of .Enserch Corp,)

>RBC IP, NAME RECIPIENT AFFILIATION

~EISENHUTrDeG ~ ,Division of Licensing

SUBJECT:

For wards minutes of 820826 meeting w/util C Ei" in Juno .-Beachf FL re engineering verification pt ogr am,Next meeting

,0'entativel y ischeduled for 820908 ~

,DI'STRIBUTION CODE; 8001S COPIES >RECEI VED! L'TR, ENCL,, SIZE ~,

<<TXTLE! Licensing "Submittalo,'PSAR/FSAR Amdts '8 'Related Correspondence NOTES!

RECIPIENT ~COPIES RECIPIENT iCOPIES ID CODE/NAME L'TTR ENCL -ID CODE/NAME LTiTR ENCL A/D LICENSNG 1 0 LIC BR A'3 >BC 1 0 LIC BR 03 LA 1 0 NERSESgV ~ 01 1 1=

INTERNAL ELD/HDS2 1 eQ IE FILE 1 1 IE/DEP EPDS 35 1 1 IE/DEP/EPLB :36 >3 3" NRR/DE/AEAB aQ NRR/DE/CEB 11 NRR/DE/EQB 13 j3 NRR/DE/GB 28 "2 2 NRR/DE/HGEB <<30 2 2 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB '24 1 1 NRR/DE/SEB 25 1 NRR/DHFS/HFEB40 1 NRR/DHFS/L'QB 32 1 -1 NRR/DHFS/OLB ~34 1 NRR/DHFS/~P7RB20 1 1 NRR/DS I/AEB 26 1 1 NRR/DS I/ASB 27 1 1 NRR/DS I/CP8 10 NRR/DSI/CSB 09 1 1 NRR/DSI/ETSB 12 1 1 NRR/DSI/ICSB 16 1 1 NRR/DSI/PSB 19 1 1 NRR/DSI/RAB 2? 1 1 N /RSB 23 1 1 NRR/DST/LGB 33 1 1 04 1 1 RGN2 '2 2 RM/DDAMI/NI8 1 "0 EXTERNAL! ACRS 41 10 10 SNL'(AMDT'S ONLY) 1 DMB/DSS (AMDTS) 1 FEMA~REP DIV 39 1 1 UPDR 03 1 NRC PDR 02 1 1 NSXC 05 1 NTIS 1 1

)TOTAL NUMBER OF )COPIES REQUI'RED! UT~T~R "59 .FNCL ',53

a n

h e h

'>i 'ihf f I ~ I'CA 1

f Ih 1 lti ll'III f N fq~R 1" I', il p P q,'l ') 'f ~ "Ith h aff Leee~~ ha eh eche e LA ee I[

if i, tkil.C, /gtjg'g ~ l fan%,P R719  ; rf, ~ r'ff tf I

~ e J Pl

'Il i ff1l I h

a lf, gf I I1R J

ti fl

'f r

) ff g

'i R T RLI lif W

e 1ff

Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, NY 10048 August- 31, 1982 Ltr. No. EVP-109/SL-2 Office of Nuclear Reactor Regulation'..

Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D C 20555

Dear Mr Eisenhut:

Re: ST LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM MINUTES OF MEETING Attached for your information are the minutes of the August 26,1982 meeting attended by the FPL, C-E and Ebasco EVP Task Force Managers in Juno Beach, Florida.

Very truly yours, T H Blodgett Joint Task Force Chairman THB/rob Attachment cc: Robert E Uhrig, FPL w/att D L Christian, FPL w/att 820831 i4 05000389 T'2090303 PDR ADDCK A

I hl f

t 1 of 2 ENGINEERING VERIFICATION PROGRAM SL2 EVP TASK FORCE MANAGERS MEETING DATE: August 26,1982 LOCATION: Florida Power 6 Light Company Office, Juno Beach, Florida Attendees:

Florida Power & Li ht Com an D L Christian EVP Task Force Manager Combustion En ineerin Inc D D Miller EVP Task Force Manager Ebasco Services Incor orated T H Blodgett EVP Task Force Manager A. Information Re uests Verification Items 1 and 2 C-E Portions of the design input information requested will be supplied by the C -E Project Team in the form of a. marked up Unit 2 contract specification.

2. Verification Items 3 thru 8 Ebasco Have received part of the design inputs from the August 18 letter request, and essentially all from the August 13 request.

B. Schedule Verification Items 1 and 2 C-E Mr Miller stated that the C-E Task Force expects to maintain its existing schedule dependent upon furnishing of the requested design inputs.

2. Verification Items 3 thru 8 Ebasco) o Mr Blodgett advised that detailed workday estimates have been prepared, evaluated, and adjusted, and that related time-phased schedules for each item have been prepared and are presently undergoing adjustment. The adjustments are necessary to integrate the schedules, maintain order of item priorities and eliminate interface conflicts among supporting disciplines.

0 The schedules were discussed, and Mr Blodgett advised that a combination of ETF overtime plus additional qualified discipline engineers is essential to help maintain schedule. Verbal authorization in this regard was given for FPL by Mr Christian.

C. Au ust 17 Letter -NRC to FPL Copies were received by Messrs. Miller and Blodgett via telecopier on August 23 and 24 respectively. An interim report regarding Task Force independence re second paragraph of the letter will be prepared and transmitted to the NRC by the EVP Joint Task Force Chairman.

Mr Christian advised the meeting referred to in third paragraph of the letter has been scheduled for September 14 at NRC's Bethesda office. Messrs Christian, Miller and Blodgett will attend.

U comin Meetin s The next meeting of the Task Force managers was tentatively~scheduled for September 8 in New York.

September 14 in Bethesda, Maryland per C.2 above.