Forwards Minutes of 820908 Meeting w/util,C-E,FPL & Ebasco Engineering Verification Program Task Force Managers in New York City,Ny
ML17213A474
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/17/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-113-SL-2, NUDOCS 8209240208
Download: ML17213A474 (10)


Text

REGULA TOR ORMA T ION DISTR I BUT ION 8 0 (R IOS)

AQCESSION NBR:8209240208 DOC DATE: 82/09/17 NOTARIZED NO DOCKET FACIL:50"389 St, ~ Lucie Planti Unit 2i Florida Power 8 Light Co. 05000389 AUTH ~ NAME AUTHOR AFFILIATION BLODGETTi T ~ H, Ebasco Set vicesi Inc, (subs. of Enserch Corp.)

RECIP,NAME RECIPIENT AFFILIATION EISENHUTgDeG. Division of Licensing

SUBJECT:

Forwards minutes of 820908 meeting w/util C-EiFPLiC E 8, Ebasco Engineering verification program, task force managers in New York CityiNY, DISTRIBUTION CODE: 8001S COPIES RECEIVED:LTR L ENCL g SIZE; .

TITLE: Licensing Submittal: PSAR/FSAR Amdts L Related Carr espondence NOTES:

REC IP IENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A/O LICENSNG 1 0 LIC 'BR 43 BC 1 =-0 LIC BR 43 LA 1 0 NERSESgY ~ 01 1 1 INTERNAL: ELO/HDS2 1 0 IE . F ILE 1 IE/DEP EPDS 35 1 IE/OEP/EPLB 36 I" 3 3 NRR/DE/AEAB 1 -0 NRR/DE/CEB 11 1 NRR/DE/EQB 13 "3 NRR/DE/GB 28 2 2 NRR/DE/HGEB 30 2 2 NRR/DE/MEB 18 NRR/DE/MTEB 17 1 NRR/OE/GAB ?1 1 1 NRR/DE/SAB 2Q 1 1 NRR/DE/SEB 25 1 NRR/DHFS/HFEBQO 1 1 NRR/OHFS/LQB 32 1 1 NRR/DHFS/OLB 34 1 1 NRR/DHFS/PTRB20 1 1 NRR/OSI/AEB 26 1 1 NRR/DS I/ASB 27 1 1 NRR/DSI/CPB 10 1 1 NRR/DSI/CSB 09 1 1 NRR/DS I/ETSB 1? 1 1 NRR/DSI/ICSB 16 1 1 NRR/DS I /PS 8 l 9 1 1 NRR/OS I/RAB 22 1 1 NR I/RSB 23 1 NRR/DST/I GB 33 1 1 E'6 F 04 RGN2 "2 2 Mf'/MI

~

1 1 9 1 0 EXTERNALS ACRS 41 6 6 BNL(AMDTS ONLY)

OMB/DSS (AMDTS) 1 1 FEMA REP DIV 39 LPDR 03 1 1 NRC PDR 02 NSIC 05 1 1 NTIS

'TOTAL NUMBER OF COPIES REQUIRED: LtTTR 55 ENCL 09

I~

fry

'i) u ti'4 I' 4

' r)>>II jii>>i p ")Is I ll ~l . a p7 If,t>>g'P,,

q P '

p I( I >>I I

, p.I,'>> k 44ttt ) I, i>>1 ) p I 14.>> >> ) r ~

p "F p ~ 'jq r " p'rg N 4 (I,

c. ')'>> ( >j; I I

) "Prt 44 I "I >> ) Ii(i 4 44>>

rr ~ w~a e~ ~ ~~ p'E l .. IC'" j gal'ti j'j ) ',r$ >>'t,i>>j i(II( ~ girtti

>>44 ) j>> il >>ice>>,ac)')q I I l ' I44 4 I >>,>> 4 'll p'" I "

) li l .' l k 11

<> rt llll rt

) f j,p 44

)J l 4" 4 1< 41 o'. (",  ! 4t,'1$

1 t>>ftj >>' J ( I f Jt >>t 4,' )X O4>>4"P" 4', 1'4>> I~ y'P I'

I k 1 ~t (0

I j,tg>> >>

,i)y 'I ht I 4~ f y<<

ii g

li yY ,

(,

it p 44r" i 4 I 4

Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, NY 10048 September 17, 1982 Ltr. No. EVP-113/SL-2 Office of Nuclear Reactor Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D C 20555

Dear Mr Eisenhut:

Re: ST LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM

'MINUTES OF MEETING Attached for your information are the minutes of the September 8, 1982 meeting attended by the FPL, C-E and Ebasco EVP Task Force Managers in New York.

Very truly yours, T H Blodgett Joint Task Force Chairman THB:dm Attachment cc: Robert E Uhrig, FPL w/att D L Christian, FPL w/att 8209240208 920917

~~,voa ~oocx asooosev A ' PDR

I '

Sheet 1 of 3 V

~P ~ ~

IC ENGINEERING VERIFICATION PROGRAM SL2 EUP TASK FORCE MANAGERS MEETING DATE: September 8, 1982 LOCATION: Ebasco Services Incorporated Office, New York, N.Y.

ATTENDEES:

Florida Power & Li ht Com an D L Christian -'EUP Task Force Manager Combustion En ineerin Inc D D Miller - EVP Task Force Manager Ebasco Services Incor orated T H Blodgett EVP Task Force Manager A. Information Re uests

1. General Mr Christian advised that efforts have been underway to improve the time being taken to process Task Force information requests.

Response time from the Project Teams has been particularly slow with regard to C-E Task 'Force requests.

2. Verification Items 1 and 2 (C-E)

The following requested design inputs have not yet been received by the C-E Task Force:

Request Request Request Description of Design Input Letter No. Date Item No.. Information Re uired EVP-501/SL2 7/26/82 4 As-built system resistance-(Ebasco Project Team action req'd).

Environmental Qualification Report and Guidebook-(Ebasco Project Team action req'd).

EVP-502/SL2 7/26/82 Environmental Qualification Report and Guidebook-(Ebasco Project Team action req'd).

EVP-509/SL2 8/20/82 Piping layout from Safety Injection Tank Isolation Valve (V-3614) to RCS cold leg (Ebasco Project Team action req'd).

J

~ ~ ~a

sheet z or 6

3. Verification tems 3 thru'8 (7basco)

The following requested design inputs have not yet'een'eceived'y the Ebasco Task Force:

Request Request Re'quest Description of Design Input Letter No. -Date Item No. Information Re uested EVP-306/SL2 9/2/82 3 Main steam transient con-ditions for main steam iso-lation valve (C-E Project Team action req'd).

Steam break faulted conditions re MSIV (C-E Project Team action req'd).

B. Schedule/Personnel

l. Ebasco Task Force Five (5) additional qualified engineers have been added and work is proceeding on a selective overtime basis to help maintain schedule.

There are now 16 engineers assigned full-time or part-time, plus the Task Force Manager and clerk-typist.

2. C-E Task Force Three (3) additional qualified engineers have been selected and assigned. A total of eight (8) engineers are now-assigned on either a full-time or part-time basis.

C. Release of Existin Desi ns

1. Discussed the release of existing designs to the Task Force for com-parison with independent designs. In accordance with EVP procedure, Review Committee will first look at the independent design package

'he for each item and determine its degree of completeness- before granting approval for release of the existing design .for that item. This step is intended,to preclude the possibility of premature release of exist-ing design documents to the Task Force.

2. Mr Christian will determine availability of t'e individual Review Com-mittee members'o meet as a group within the next two-week period for purpose of reviewing the two independent design packages scheduled to be completed first (Safety Injection Tank Isolation Valve by C-E,Task Force, and Hydrogen Recombiner by Ebasco Task Force).
3. In order to minimize the waiting time for turnover, of existing designs to Task Force from Project Team following Review Committee authoriza- .

tion to release, it was agreed, that the Project Teams should be re-quested to start assembling, but holding in readiness, the existing, documents for the various verification items.

t3of3 D. Miscellaneous At the conclusion. of the meeting, a tour of the Ebasco EVP Task Force working area on the 15th floor was conducted by Mr Blodgett..

E. U comin Meetin s

1. September 14 at the NRC Bethesda, Maryland offices. The EVP Task .

Force Managers will discuss with the NRC the EVP program and the measures used to assure program independence. Mr Christian will contact Mr Victor Nerses (NRC) regarding an agenda for the meeting.

2. The next meeting of the Task Force managers was tentatively sche-duled for September 23 in Windsor.
3. EVP Review Committee meeting,. at a date yet to be determined per C.2 above.