Forwards Minutes of 820923 Meeting W/Util & C-E Task Force Managers in Windsor,Ct Re Engineering Verification Program
ML17213A529
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/29/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-117-SL-2, NUDOCS 8210040334
Download: ML17213A529 (7)


Text

REGULATORY FO ION DISTRIBUTION S EN DS)

ACCESSION NBR;8210040334 DOC ~ DATE: 82/09/29 NOTARIZED: NO DOCKET FACIL:50-389 St ~ Lucie Plant~ Uni,t 2< Florida Power L Light Co. 05000389 AUTH ~ NANE AUTHOR AFFILIATION BLODGETTET AH. Ebasco ServicesE Ines (subs. of Enserch Corp,)

RECIP ~ NANt- RECIPIE.N'I AFFILIATION EISENHUT~D ~ G, Division of Licensing

SUBJECT:

Forwards minutes of 820923 meeting w/util 8 C E task force managers in W'indsor~CT re engineer-ing verification 'program.

DISTRIBUTION CODE:

TITLE: Licensing BOO IS COPIES RECEIVED:LTR Submittal: iPSAR/FSAR Aqdts 8, JRelated

.ENCL g SIZE:.

Correspondence g

NOTES: 'ECIPIENT iCOP IES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID iCODE/NAME LTTR ENCL A/D LICENSNG 1 0 LIC 'BR 03 BC 1 0

,LIC BR 03 LA 1 0 NERSESgV, 01 1 1 INTERNAL: ELD/HDS2 0 IE FILE 1 1 IE/DEP EPDS 35 1 1 IE/DEP/EPLB 36 3 3 NRR/DE/AEAB 1 0 NRR/DE/CEB 11 1, 1 NRR/DE/EQB 13 3 NRR/DE/GB 28 2 2 NRA/DE/HGEB 30 2 NRR/DE/NEB 18 1 NRR/DE/NiTEB 17 1 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 24 1 NRR/DE/SEB 25 1 1 1' NRR/DHFS/LQB 32 NRR/DHFS/HFEB40 1 1 1 NRR/DHFS/OLB 34 NRR/DHFS/PTRB20 1 1 NRR/DS I/AEB 26 NRR/DSI/ASB 27 1 NRA/DSI/CPB 10 1 1 NRR/DS I/CSB 09 .1 1 NRR/DSI/ETSB 12 1 1 NRR/DSI/ICSB 16 1 1 NRR/DS I/PSB 19 1 1 NRR/DSI/RAG 22 1 1 SB 23 1 1 NRR/DST/LGB 33 1 G 04 1 1 RGN2 2 2 RN/DDANI/NI8 1 0 EXTERNAL: ACRS 4] 6 BNL(ANDTS ONLY)

DNB/DSS (ANDTS) , FENA REP PIV 39 LPDR 03 1 1 NRC PDR 02 NSIC 05 1 1 NTIS TOTAL NUNBER OF COPIES REQUIRED: L'TTR 55 'NCL 49

,,jjl i I!)j<<)4 I ($ 1

'IM 1 I) 1, l e r 'Ch hhh Ill E'q 1 e II << '"

~ ,f4 g Met ll

'ii I '1 'I (Chh I, 1'1hf )j 1 ~ 1tfh I Il Mlj I 'C l 1IM 1,. Il'1") I 1e'4 (h ~ ' I)II' e c)IM j), I'I(( ~

1 e

(1 f>> I )il 11 ~ I ~ 'Cs I" Mr ",,1!.1!' f '> f )I )I lf'I 'h, <<'If111 <<,111th Jr"I Mf e" )Ie 'I'e '

l il 3jje 4

~ I, 1 PI 1! Irk 1 1 IV I Ir 11 f>r 'CIa h1 1 ),"Mh, I Ic I((I, ('fkh oeeeee e eeee w~ >) l MIM l:! l(I f,h'rg

><< '1l l )hM W 4 I hj! .I jt, > l IM( M 4'f I16 1 e 11'1 f (hah "I e(M ~

~ I kvegh( II I 1 ~ I f "hi"I f i-'ih'1 9 f <:>J r.* 4 jf I ill( ~ lc (), c$ 4 li fM] II(h I il 1 .I '1 N,l 1 J (I 4t ~ cri 4I, (P I,

<<,jjfI if 4 lt'lJ N

I)l fl f (C

3j,

Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y. 10048 September 29,1982 Ltr. No. EVP -117/SL-2 Office of Nuclear Reactor Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr Eisenhut:

Re: ST LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM MINUTES OF MEETING Attached for your information are the minutes of the September 23, 1982 meeting attended by the FPL, Ebasco and C-E EVP Task Force Managers in Windsor.

Very truly yours, D

T H Blodgett Joint Task Force Chairman THB/rob Attachment cc: Robert E Uhrig, FPL w/att D L Christian, FPL w/att 82i0040334 820929 PDR'DOCK,05000389 "A '... '. PDR

t

'I l k k I

5 Sheet I of 2 ENGINEERING VERIFICATION PROGRAM SL2 EVP TASK FORCE MANAGERS MEETING DATE: September 23, 1982 LOCATION: Combustion Engineering, Xnc. Office, Windsor, Conn.

ATTENDEES:

Florida Power 6 Li ht Com an D L Christian EVP Task Force Manager Ebasco Services Incor orted T H Blodgett EVP Task Force Manager Combustion En ineerin Inc D D Miller EVP Task Force Manager A. Information Re uests Mr Miller advised that the C-E Task Force has now received all requested design inputs:

2. Hr Blodgett advised that response is still lacking to ETF request letter EVP-306/SL2 of September 2 concerning main steam transient conditions and steam break faulted conditions for the Main Steam Isolation Valve (Verification Item 7)."
3. Hr Christian phoned the C-E Project Team to expedite a response to that ETF request.

B. Release of Existin Desi ns

1. Status of H dro en Recombine'r (Verification Item 4)

The Ebasco Task Force is awaiting word of Review Committee approval to release existing design documents for comparison ~

Not all Committee members have as yet completed reviewing their copies of the independent design package for completeness.

2. Status of Safet Xn'ection Tank Isolation Valve {Verification Item 2)

Copies of the final version of the C-E independent design package were distributed by Hr Hiller for Review Committee completeness review. The C-E Task Force anticipates release of the existing design documents for comparison early next period.

Sheet 2 of 2 s

Release of Fxistin Desi ns (Cont'd)

3. Control- Room Emer enc Cleanu S stem Valve (Verification Item 3)

The independent" design package has been completed by the ETF, and Mr Blodgett distributed copies for completeness review by the Review Committee. Transmittal letter EVP-309/SL-2 requested that Committee approval to release the existing design for comparison be addressed in a conference call early next period.

Con aoison oi inde endeno and Esisoin~Desi ns A Comparison Sheet form is being developed by the ETF for use in comparison of designs. A preliminary copy will be forwarded to the C-E Task Force for. its information.

Schedule /Personnel Ebasco Task Force Work continues on a selective overtime basis. Copies of resumes for engineers assigned during August and September were given to Mr Christian. Task Force total manpower remains at 16 full-time/part-time engineers plus Task l.'orce Hgr and clerk-typist.

2. C-E Task Force C-E's EVP schedule was revised due to late receipt of requested design inputs. Copies were distributed to Messrs Christian and Blodgett.

Task Force manpower .level is presently ten.

Field Installation Verification Phase The following items were included in a preliminary discussion of this phase of the Engineering Verification Program:

1. Maintaining Task Force independence at the Site.
2. Adequate office space at the Site.,
3. Establishing a Site contact person.
4. Best estimate of time period during which this phase will be underway.
5. Estimated maximum number of Task Force personnel at Site at the same time.
6. Consideration of advance arragements for. motel accomodations (start of tourist season).

U comin Meetin s The next meeting of the Task Force Managers was tentatively scheduled for October 7 in Juno Beach.

,j (c w P

c IV