Forwards Joint Ebasco & C-E Task Force Program Weekly Status Summary for 820920-25
ML17213A527
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/24/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-116-SL-2, NUDOCS 8210040072
Download: ML17213A527 (9)


Text

REGULATOR NFOl I T ON DISTR I BUT ION EM DS)

ACCESSION NBR:8210040072 DOC ~ DATE: 82/09/24 NOTARIZED: NO DOCKET FACIL:50-389 St, Lucie Planti Uni,t 2i Florida Power 8 Light Co. 05000389 AUTH ~ NAME AUTHOR AFFILIATION BLODGETTiT ~ H ~ Ebasco Services< Inc ~ (subs, of Enserch Corp.)

RECIP ~ NAME RECIPIENT AFF ILIATION EISENHUT~D.G ~ Division of Licensing

SUBJECT:

Forwards Joint Ebasco 8 C-E Engineering Task Force program weekly status summa y for 820920 25, DISTRIBUTION CODE: 8001S COPIES RECEIVED;LTR I ENCL i TITLE: Licensing 'Submittal:,PSAR/FSAR Amdts 8,'Related Correspondence SIZE:

NOTES RECIP IENT ~COPIES RECIPIENT COPIES ID ~CODE/NAME LTTR ENCL ID CODE/NAME LT'TR ENCL A/D LICENSNG 1 0 LIC BR 0$ BC 1 0 LIC BR P3 LA 1 0 NERSESiV ~ 01 1 1 INTERNAL: ELD/HDS2 1 -0 IE FILE 1 1 IE/DEP EPDS 35 1 1 IE/DEP/EPLB 36 3 3 NRR/DE/AEAB 0 NRR/DE/CEB 11 1 1 NRR/DE/EQB 13 3 3 NRR/DE/GB 28 2 2 NRR/DE/HGEB 30 2 2 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 24 1 NRR/DE/SEB 25 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 34 1 1 NRR/DHFS/PTRB20 1 1 NRR/DS I/AEB 26 1 '1 NRR/DS I/ASB 27 1 1 NRR/DS I/CPB NRR/DS I/CSB 09 NRR/DSI/ETSB 12 NRR/DSI/PSB 19 10 1

1 1

1 NRR/DS I/I NRR/DS I/RAB CSB 16 22 1

1 1

1 1

1 NRR/ SB 23 1 '1 NRR/DST/LGB 33 1 04 1 RGN2 2 2 I

DAMI/M B 1 0 EXTERNAL: ACRS 41 6 6 BNL(AMDTS ONLY) 1 DMB/DSS (AMDTS) 1 1 FEMA REP DIV 39 1 LPDR 03 1 1 NRC PDR '02 ,

1 NSIC 05 1 1 NTIS 1

TOTAL NUMBER OF COPIES REQUIRED: LTTR 55 ENCL 49

t'>> <<,,teal  ! "j)lr <<r<<<<T( I << i <q 'Il>> 1 lit<<>d'>>

~1 1

)

4 T i'>> )I il7 j>> ~

'l q<<') tl I>>

(o -'1

<<I,(.', > l. >>

ttlj<<j ',

>>A) . <<l,) r <<><<<< r << "<< ' (j"l r '1'0 l l )r)tt)>>i sqr I )r,<<>> 'I

',0 ~ .l l <<'.>

( ~ q5>>) l 'll) "l lI" << l ~ l j $ /It j ) gA ia, q a+ ', 't 'l l 'lr '1 )( 40 <

j It~ > l "g 7 .) ) i ',"<I l <<

>v r <<r e'rvr ',l

~ t

't

~ I << 1

'>>'j I '<<t l

f<<'>g'l 'I 1 ~

. l f'<<lr 1'>> lf>>r>> l. l f>>J j << ~ '<<) <<<<~ r ') <;<<'"lr ~~ "j'l

~ ">~ <<<'>>S,<<l'>'q't gj)f>> t<<,ta ~ >>>> j rl k jj y l >><</II tj%(

~e wa

<<rl 'A- ).",

,. C I'.l j'<< la I i jt< ', ~

l I >>"

<<>x'>:','lt far, ',>>r, T t">.r ~'r,t'1 )

(

'1

'<' " >>I l >r I

l:

)lc>I<<<7<.'1>><<

] llIt

. lI >t'J 1It I ':li la 'll I l tt JL tl t l i7 I l lr'I j$ l>>t j I >>:, lh 1>> )t,~k

'>>>>, tY l lK f<g 1 l

yl >>

>>i jt, l ~ 5XT I t

'.<<TX" ."x 'I

>> ">>>> l

<< tt 'll

~ I l l I 1,>>

r Jl, T>>;

fr I ' f 'tp I <<tl I V, <<>>><

ljlg li f>>

)

I I

Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N..Y. 10048 September 24,1982 Ltr No. EVP-116/SL-2 Office of Nuclear Reactor Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr Eisenhut:

Re: ST. LUCIE UNIT NO 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD 'SEPTEMBER 20 '-SEPTEMBER '25 '1982 Attached for your information is the Weekly Status Summary of the Joint Ebasco and Combustion Engineering Task Force for the period September 20 through September 25, 1982.

Very truly yours, T H Blodgett Joint Task Force Chairman THB/rob Attachment cc: Robert E Uhrig, FPL w/att D. L Christian, FPL w/att 2i0040072 820924

', 8PDR ADOCK 05000389 R PDR

~ ~ ~

V

)

J4 f"

v~ k ENGINEERING VERIFICATION PROGRAM/SL-2 EBASCO TASK FORCE WEEKLY STATUS

SUMMARY

FOR PERIOD SEPTEMBER 20 SEPTEMBER 25,1982 1~ The Control Room Emergency Cleanup System Valve independent design package (Verification Item 3) was completed and copies have been distributed to members of the Review Committee for review of package completeness. Committe approval to release existing design for ETF comparison is anticipated early in the week of September 27.

2~ The ETF is awaiting release of the existing design documents for the Hydrogen Recombiner (Verification Item 4). Comparison of independent and existing designs will start following Review Committee approval to release, and the subsequent receipt of existing design from the Pro5ect Team.

3 ~ The independent design package for the Main Steam Isolation Valve (Verification Item 7), is nearly complete, although two requested design input items per ETF letter EVP-306/SL-2 dated September 2 have still not been received.

4, In additions to Item 7, work progressed on preparation of the independent designs for the ECCS Area Ventilation System HEPA Filter 8), Area Monitor (Item 5), and Aux. Bldg. Tornado Door (Item 6) . 'Item

.All four are scheduled for completion during the week of September 27 and submittal to the Review Committee for review of package completeness and approval to release existing designs for comparison.

5. A meeting of the FPL, C-E and Ebasco EVP Task Force Managers was held on September 23 in Windsor Conn. to discuss program progress.

0 0 0 ~

ENGINEERING VERIFICATION PROGRAM/SL2 C-E TASK FORCE WEEKLY STATUS

SUMMARY

SEPTEMBER 20 SEPTEMBER 25

l. The balance of the design information was received by courier pack from the Ebasco project team on September 22. Receipt of this material enabled the C-E Task Force to finalize the Safety Injection Tank Isolation Valve (Item2) independent design package. The final version has been distributed for committee review. Release of the existing design package for comparison is expected .by September 28.
2. Completion of an independent design package for the High Pressure Safety Injection Pump (Item 1) is scheduled for September 30.
3. Early planning for the SL2 onmite verification phase was included in the Task Force Managers'rogress review meeting held on September 23. The FPL Task Force Manager will make appropriate arrangements to assure task force independence while at the jobsite.

~ TELEPHONE CONVERSATION LOG

~

ENGINEERING VERIFICATION PROGRAM SL2 WEEK OF 9-20-82 DATE OF PARTICIPATING GENERAL SUBJECT PREPARER OF TELECON ORGANIZATIONS OF TELECON TELECON RECORD Sept. 20 C-E/FPL SI Tank Isolation Valve C-E EVP Task Force Mgr Sept. 21 Ebasco/FPL Expediting Ebasco EVP Task Review Committee approval Force Mgr to release existing design for H Recombiner; ETF Task force Mgrs Sept 23 meeting Sept. 21 FPL/Ebasco Review Committee members Ebasco EVP Task conference call re H2 Force Mgr Recombiner design pkg Sept. 21 FPL/C-E Design Review Committee C-E EVP Task meeting (conference call) Force Mgr Sept. 22 Ebasco/FPL Expediting Review ~Ebasco EVP Task Committee approval to Force Mgr release Hy Recombiner existing design for comparison Sept. 22 C-E/FPL Receipt of design input C-E EVP Task Force Mgr Sept. 23 C-E/Ebasco EVP Task C-E EVP Task Force Mgrs meeting Force Mgr schedule Sept. 24 Ebasco/FPL 2 telecons Status of Ebasco EVP Task Review Committee approval Force Mgr to release H> Recombiner existing design for comparison; overdue response 'to request for MSIV design input Sept. 24 FPL/Ebasco Review Committee members Ebasco EVP Task conference call re H2 Force Mgr Recombiner design pkg