ML17212B773

From kanterella
Jump to navigation Jump to search
Forwards Weekly Status Summary of Joint Ebasco & C-E Task Force for 820726-30
ML17212B773
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/30/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-101-SL-2, NUDOCS 8208030181
Download: ML17212B773 (9)


Text

REGULAT INFORMATION DISTRIBUTION STEM (RIDS)

AGCE'S SION NBR 8208030181 DOO ~ DATE: 82/07/30 NOTARIZED! NO DOCKET ¹ FACIL:50 389 St, Lucie PlantE Uniit 2E Florida Power 8 Light Co ~ 05000389

~ NAME AUTHOR AFFILIATION Corp' (sub'f

'AUTH BLODGETTETBH, Ebasco ServicesE Inc, Enserch )

)RElC I P, NAME RECiPIENT AF F IL'I ATION EISENHUTE D ~ G ~ Division of Licensing

SUBJECT:

Forwards weekly Tstatus summary of Joint Ebasco 8 O-E task force for 820726-30, DISTRIBUTION CODE: BOOIS COPIES iRECEIVED:LTR . ENCL .l SIZE:.

TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME .LTTR ENCL A/D LICENSNG "0 LIC BR ¹3 BC 1 0 LIC -BR ¹3 LA 0 NERSESEVB 01 1 1 INTERNAL: ELD/HDS2 1 0 IE FILE .1 1 IE/DEP EPOS 35 1 1 IE/DEP/EPLB 36 3 3 NRR/DE/CEB 11 1 NRR/DE/EQB 13 3 3 NRR/DE/GB 28 2 '2 NRR/DE/HGEB 30 '2 2 NRR/DE/MEB 18 1 NRR/DE/MTEB 17 1 1 NRR/DE/QAB '21 1 1 NRR/DE/SAB 20 1 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFEB40 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 30 1 1 NRR/DHFS/PTRB20 1 NRR/DS I/AEB 26 1 1 NRR/DSI/A'SB '27 1 1 NRR/DSI/OPB 10 1 1 NRR/DSI/CSB 09 1 1 NRR/DS I/ETSB 12 1 1 NRR/DSI/ICSB 16 1 1 NRR/DS l/PSB 19 1 1 NRR/DSI/RA 8 22 1 1 NR RSB 23 1 1 NRR/DST/LGB 33 1 1 VG FILE 00 1 1 RGN2 2 2 /MIB 1 0 EXTERNALS ACRS <>1 10 10 BNL(AMDTS- ONLY) 1 DMB/DSS (AMDTS) 1 1 FEMA REP DIV 39 1 1 LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05 1 1 NTIS 1

'!TOTAL NUMBER OF COPIES REQUIRED: LTTR 58 ENCL .'53

'1 t '1 c

E

~.

Engineering Verification Task.1orce Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y. 10048 July 30, 1982 Ltr. No. EVP-101/SL-2 Office of Nuclear Reactor Regulations Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D C 20555

Dear Mr Eisenhut:

Re: ST. LUCIE UNIT NO. 2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD JULY 26 JULY 30, 1982 Attached for your information is the Weekly Status Summary of the Joint Ebasco and Combustion Engineering Task Force for the period July 26 through July 30, 1982.

Very truly yours, T H Blodgett Joint Task Force Chairman THB:ggv Attachment cc: Robert E Uhrig, FPL w/attach.

D L Christian, FPL w/attach.

8208030i8l 820730 PDR ADOCK 05000389 R PDR

ENGINEERING VERIFICATION PROGRAM SL2 EBASCO TASK FORCE WEEKLY STATUS

SUMMARY

FOR PERIOD JULY 26 JULY 30, 1982 The following activities were underway during the period July 26 through July 30, 1982:

1 The last of nine discipline engineers assigned to the Task Force reported on July 26. Five have leading roles and four will provide support as required during the design review phase of the program.

2 The Task Force 15th floor 2WTC working area accommodations were essentially completed .during the period.

3 Work continued on establishing design boundaries and planning the approach to be taken for verification of each specific item.

Receipt of the initially requested design inputs is needed and expected early next period.

4 A meeting of the FPL, C-E and Ebasco Task Force Managers and FPL Program Coordinator was held July 27 in Ebasco's offices.

Overall progress to date and the administrative procedures were reviewed. New procedures were implemented for processing correspondence.

~4 I ' J - ~ J 4 n,

C-E ENGINEERING VERIFICATION TASK FORCE/St. Lucie 2 WEEKLY STATUS

SUMMARY

July 26-July 30 Hi hli hts

1. The C-E Task Force established verification item design boundaries for the High Pressure Safety Injection Pump 2A and for the Safety Injection Tank Isola-tion Valve V-3614. Sketches identifying the specific boundaries were prepared and sent to FP6L and Ebasco Task Force managers for information.

A request for initial design input for both items was forwarded through the FPGL EVP Task Force manager.

2. Administrative procedures were finalized during a Task Force progress meeting held July 27 at Ebasco offices.
3. Staffing of the C-E Engineering Verification Task Force continued during this report period. Four (4) engineers have been assigned full time. A secure document control center has been established within the Task Force work area.

Status Design planning has begun for each verification item, however, initiation of specific engineering design work hinges upon early receipt and confirmation of design inputs.

1 ~ I 1 If 1

".'s!usxw

TELEPHONE:CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM SL2 WEEK OF 07/26/82 DATE OF PARTICIPATING GENERAL SUBJECT PREPARER OF TELECON ORGANIZATIONS OF TELECON TELECON RECORD July 28 FPL/Ebasco New correspondence pro- Ebasco EVP Task cedures; address instruc- Force Manager tions for FPL and NRC July 28 C-E/Ebasco Preparation of July 27 Ebasco EVP Task meeting minutes; address Force Manager instructions for FPL and NRC; Ebasco and C-E special administrative procedures