ML17213A405
| ML17213A405 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 09/03/1982 |
| From: | Blodgett T EBASCO SERVICES, INC. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| EVP-111-SL-2, NUDOCS 8209080255 | |
| Download: ML17213A405 (10) | |
Text
REGULlAT I>>VFORMATION DISTRIBUTION STEM (RIDS)
ACCESS I ON>>VBR 8209080255>>
DOCl DAiTE'4 82/09/03 NOT'ARIZED'O FACIL 50 389 St.
Loci e Pl a'nt'i Uni t 2i F>>l or i de Po~er L Liight Co>>..
AUTH.NAMEl AUTHOR AFF ILIIATION BLODGE>>TT.H.
Eba'scor Servi cesi Inc. (subs., o>>f'nserch Corp.)
REC IP>>VA>>>>lE'ECAP'IEN>>Tr, AFFILIIAJ I ON>>
EISENHUT i D. G.
D i V i s i on orf>> Llicene i na DOCKEIT>>
¹'5000389 SUBJEC>>T:
For wards Jo>>intr Eoabco>>
L C'
T'ask F'orce weekl y status summer y for 820830"0903
'ISTRIBUTION COOK;:
80018 GDP>>IES RECK I VED: LITR Lr ENCLI l SIZEt:W TITLE: Llicensino Submitta'l:
PSAR/FSAR Amdts L Re'lated Correspondence NOTES:
R EC I P>>I KiVT ID CODE/VA>>'>>lEi'/D LCCKNSNG<
LrIC;, BRf ¹3-LlA'NTERNAL>>:
ELD/HDS2 IE/DKP>> EPOS 3S>>
NRR/DE'/AKAB NRR/DK'/EQBr 13 NRR/DE'/HGEB 30 NRR/DE'/'4TKB 1.7 NRR/DE'/SAB>>
2,4" NRR/DHFS/HFKB40 NRR/DHFG/OL8 34'RR/DSiI/AEB26 NRR/DS>>I/CPB 10 NRR/DS>>I/EITSB>>
12'RR/DS>>I/PSB"19 iVRR/0 S>>I /R S 8>>
'23 04
>>>>l I /MI 8>>
EXTERNALi: ACRS 4'1 DMB/DS8
( A>>RD>>TS)
LPDR 03 N S ICr'5>>
COPIES LfTTR KNCL 1,
0 1,
0 1
0 1,
1 1,
0 3
3 2
2 1
1.
1 iv 1
1>>
1 1
1 1
1 1
1 1
1 i.
1 1<<1 1
0 10 10 1,
1 1
1 1
REC IP IENTr ID>> CODE>>/NA>>MEI L'ICl BR
¹3>> BCI
>>VERSESzV
~
01.
IEi FiILE'E/DEP/EPLB>>
36 NRR/DE/CEB 11 NRR/DE'/GB.
28 NRR/DE/MEB 18 NRR/DK/QAB 21 NRR/DE'/SEBr 25 NRR/DHFS/LOB>> 32 NRR/DHFS/PfRB20 NRR/DSI/ASBr 27>>
NRR/OSI/CSB>>
09 NRR/DSI/IC88r 16 NRR/DSI/RABr 22 hlRR/DST/LGBr 33 RGN2 B NLI(AMDT S<
0>>V L>>Y )
FE'4lA. REP DIV-39 NRC>> PDR 02 iVTIS COPIES L~TTR ENCLl 0
1 1
1, 1
3 3
1 1
2 2
1 1
1 1
1 1
1 1
1, 1
1, 1
1 1
1 1
1 1
1 1
2 2
1 1
1, 1
1 1
1 1
TOTAL NUMBER OF>> COP>>IES REQUIRED!
LA'TR 59 ENCLI 5>>3.
J' N
P' I (
I
\\ 4 h
W 1g 14 )
l 1
II t '
Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y.
10048 September 3,1982 Ltr No. EVP-ill/SL-2 Office of Nuclear Reactor Regulation Attention:
Mr Darrell G Eisenhut, Director Division of Licensing U
S Nuclear Regulatory Commission Washington D
C 20555
Dear Mr Eisenhut:
Re:
ST LUCIE UNIT 2 DOCKET N0.,50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS
SUMMARY
FOR PERIOD AUGUST 30 SEPTEMBER "3 '1982 Attached for your information is the Weekly Status Summary, of the Joint Ebasco and Combustion Engineering Task Force for the period August 30 through September 3,
1982.
Very truly yours, Mi>(
T H Blodgett Joint Task Force Chairman THB/rob Attachment cc:
Robert E Uhrig, FPL w/att D L Christian, FPL w/att ssoqososssosoooss9 ss sso9os PDR ADOCK PDR R
ENGINEERING VERIFICATION PROGRAM/SL-2 EBASCO TASK FORCE WEEKLY STATUS St&MARY FOR PERIOD AUGUST 30 SEPTEMBER 3,1982 1-Received balance of design inputs re the August 18 information request letter. Additional design input information was requested via a September 2
letter request.
2-Finalization of integrated.
schedule for the six A/E verification items js jn progress.
3-Five additional qualified engineers have been assigned to the Task Force.
Three reported early this period, with the remaining two scheduled to report September 7.
A total of 17 qualified discipline engineers are now assigned on either a full-time or part-time basis.'cheduled overtime on a selective basis was instituted during the period.
5-Work progressed on the independent design review phase of the program, with
=- emphasis on priority items one (hydrogen recombiner) and two ( main steam isolation valve).
V
ENGINEERING VERIFICATION PROGRAM/SL-2 C-E TASK FORCE WEEKLY STATUS Slk&fARY AUGUST 30 SEPTEMBER 3,1982 1.
Reviewed partial design input received to date with the FPL EVP Task Force
- Manager and notified him of incomplete portions.
t 2 ~
A'High Pressure Safety Injection Pump delivery curve, based on recirculation mode criteria was:developed.
Calculations to confirm its acceptability during the injection mode are now in progress.
3 ~
Provided input to the Engineering Verification.Program Interim Report issued August 31.
lj, The independent design package for the SL2 Safety Injection Tank Isolation'alve.
is nearing completion, with check calculations for key areas to begin this report period.
I'
TELEPHONE CONVERSATION LOG ENGINEERING VERIFICATIQN PROGRAM SL2 WEEK OF, DATE OF TELECON PARTICIPATING ORGANIZATIONS GENERAL SUBJECT, OF TELECON PREPARER OF TELECON RECORD August 31 C-E/Ebasco EVP Task Force Mgrs meeting minutes; Interim Report to NRC C-E EVP Task Force 'bigr.
August 31 C-E/FPL Design input status
'C-E EVP Task Force Mgr September l Ebasco/C-E Main Steam Isolation Valve-interface with C-E Ebasco EVP Task Force Mgr September 2
C-E/Ebasco Main Steam Isolation Valve interface with C-E C-E EVP Task Force Mgr September 3
Ebasco/FPL Main Steam Isolation Valve interface with C-E.Request for expedited response Ebasco EVP Task Force Mgr
V
~
~
)
II V
Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y.
10048 I
September 2,
1982 Ltr. No. EVP-306/SL-2 Mr D L Christian EVP Task Force Manager -SL2 Power Plant Engineering Florida Power
& Light Company P 0 Box 14000 Juno Beach, Florida 33408
Dear Mr Christian:
Subject:
ENGINEERING VERIFICATION PROGRAM ST LUCIE NO.
2 RE VEST FOR INFORMATION Please expedite providing us with the following design input information and/or answers to questions from the C-E Project Team relating to Verification Item 7,
'ain Steam Isolation Valve. If possible, initial receipt via telecopy would be appreciated.
1)
Does C-E require any feedback input from the MSIV position status?
2)
According to the FSAR, the MSIV has two failure modes:
a)
Valve fails close on loss of air; b)
Valve fails open on loss of electric power.
We feel that the MSIV should fail close on loss of air and/or e3,ectric power for fail safe operation.
Please advise.
3)
Please provide main steam system transient conditions to which valve has to be designed.
4)
Please provide steam break faulted conditi'ons (main steam condit'ions after steam line break).
Very truly yours, T H Blodgett Ebasco Task Force Manager THB/rob cc:
Robert E Uhrig, FPL Darrell G Eisenhut, NRC/
~ ~ea Y
~
~ ~