Text
600 M;ryt;nd Annue.S.W.
t Wnhington, D.C. 20024 202 484-9240
/h Arthur D. Little Program Systems Management Company February 24, 1984 FftEEDOM OF INFORMATION ACT REQUEST Mr. Joseph M. Felton, Director
$M-/h/h Division of Rules and Records gg f/ d'dk Office of Administration U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Ref:
F0IA 80-466
Dear Mr. Felton:
In October 1980 you responded to the above referenced F0IA by providing a computer printout of civil penalty information to the requestor, Critical Mass Energy Project. We at Arthur D.Little are currently doing a study which requires the use of this type of information updated to the present.
The computer run completed under the F0IA only extends through September 1980. We would very much appreciate your re-running the computer printout to reflect the latest data available since the September 1980 run in the fonnat previously used (sample attached) or in any other available format providing the same information for the reactors identified below. Also appreciated would be an explanation of the " Alphabetical code of non-com-pliance items" which was used in the printout under the " item code" stub heading, and an explanation of the " Report Number" coding.
Not included in this request are Licensee Event Reports or other routine abnormalities reported by nuclear licensees. Lastly, please include a cost estimate for providing this information if it is expected to exceed $100.
Information is requested on the following reactors:
Reactor Docket No.
Midland 1 329 Midland 2 330 Davis Beese 346 l
Hope Creek 354 Zimmer 358 San Onofre 362 l
St. Lucie 389 8405230010 840224 PDR FOIA ROUSSOS4-136 PDR Brussels Madrid sso rmulo Cambridge Paris Tokyo Houston Rio deJaneiro Toronto nm N.
A Arthur n Uttle Program Systems Management Company Mr. Joseph M. Felton Page 2 Reactor Docket No.
Nine Mile 410 Catawba 413 Grand Gulf 416 Millstone 423 Bellefonte 438 Perry 440 4
Seabrook 443 Comanche Peak 445 Bryon 454 Braidwood 456 Riverbend 458 Clinton 461 Wolf Creek 482 Calloway 483 South Texas 498 WPPS 508 Hartsville 518 Falo Verde 528 In accordance with the Act, we would welcome your earliest reply within ten business days of receipt of this letter.
Please feel free to call me (202)484-9240 should there be any questions regarding this request.
SincereIy,
/
/
N.:n m-
./ amuel Rousso Senior Staff I
L
)
y y-t m
'l%
"GC 2 SEP 25, r.
J t :ns?
05000003 4-----
REPORI I T Ett SEVERITY CODE CODE
FORCEt1ENT EH TEXT
(
7506 FDB 3
All AHHUAL CHAHHFL CALIBRATION AND if0HTHLY FUNCTI0ll TESTS OF Tile TEMPERATURE SEH50R SECTI0li 3. 5. I.6 0F IllE ETSR REQUIRES THAT
(
SYSIEtt5 BE PEkt0RMED COMIRARY 10 IllIS REQUIRiflFHi, As UF 5/23/78, THE CALIBRATIDHS OF THE TEMPERATURE SYSTEll DID HOT IllCLUDE set 150R SYS1[MS AHD tt0ttIHLY IUllCTIGHAL IESIS OF Tile SLt450R SYSIEIIS IIAD IlOT BEEli PERFORilED SIHCE 9/77.
SEC110HS 3.1.1.1 AllD 3.1.3.8 0F file ETSR REQUIRE IN PART, THAT THE IHDIVIDUAL WATER IHT AKE TEf tPERATURES BE MOHITORED C0tli!HUGUS 7806 FDR 3
ALL FLOW CONDITI0 tis.
ColliRARY TO TilI5 REQUIREMENT, A T T H E 1111 I
AND IllAl IllE RATE OF CHANGE OF TC BE DETERMIt4ED AND RECORDED FORAND 2 WERE IHOPERABLE AND Tile RATE OF CllANG 0F INSPECTIDH OF THE IHTAKE IEt1PERATURE SENSORS FOR UllITS I FOR ALL FLoll C0flDITI0 tis (CONTINUOUSLY).
SECTION 5.6.2.2.A 0F THE E15R REQulWES IN PART Til A T If A CONFIRt1ED MEASURED LEVEL OF RADIOACTIVITY IN ANY E 7806 FJP 3
EXCEEDS TEH TittES THE CutlTROL LEVEL. A HRilitH RtPORT BE SUB'lIITED TO THE flRC WIIllIN 10 DAYS AFTER CONFIRf1 LESAt1PLING AtID/OR REAHALYSIS, A5 APPROPRIATE SHALL BE C0t1PLETED AT Tile [ARLIEST IItlE CONSISTENT ullH THE AHALYSIS, BUT IN ANY C tililllft 30 DAYS.
CONTRARY 10 THIS REQUIREllErli, All At:0MALOUS MEASURErlEHT R[ PORI RELATIVE 10 LEVELS OF I-131 Ill EXCESS OF TEN 11 LEVEL 5, IN A 3/27/78 CAftP FIELD RESERVOIR SAttPLE MAS NOT SUBt IT TED 10 THE HRC Ut4TIL 6/9/78. AN IIIT E R V A L IN EXC DAYS AFTER THE MEASURED LEVEL WAS COHTIRflED BY REAtlALYSIS AtID IH EXCESS OF 30 DAYS AFTER THE MEDIUM THE CutilROL IEtt SECIIO!I 5.4.2 0F THE ETSR REQUIRES IH PART Til A T TEt1PORARY CHANGES TD PROCEDURES BE REVIEuED BY AHD A 7806 FPE 3
CCYS AFTER IttPI IIIEt!T AT IUll.
C0tliRARY TO THIS REQUIR[tIENT, TEftPORARY PRDCEDURE CHANGES, L!HICH WERE MADE Ill IHE FI511 BIOCllARACIERISIICS SAf tPLING PRUGR Art, INCLUDIllG ILXA5 IN51 Rut 1ENTS, IllC. DESIGHATED CilAliGE HUllBERS 78-1 AllD 78-3 AND WHICH WER Ittf L Ell [lIILD BY 4/ 85/78, UCRE 1101 REVIEUED BY 810R APPROVED BY I!!E EPC A5 0F 5/23/78, AN IllT E kV A L EXCEEDIllG 30 DAYS.
SLCIIGH S.4.1 0F ETSR REQUIRES Ill PART IllAT DET AILED WRIITEN PROCEDURES BE PREPARED AND FOLLOWED FOR AL 7506 IPF 2
C0t! DUCTING THE EtiVIROHi1EllTAL MGIiTORING PROGRAtl.
- 8. PROCEDURE QSR 430 REQUIRES It8 PART Til A T Tile DEP ARiflElli RESPoll5IBLE FOR flil AMDITED ACTIVITY RLSP0 tad 10 QUAL IIY SAFEIY AHD RELI ABIL ITY (QSR) 8111HIH 30 DAYS OF RECEIVIllG Tile AUDIT REPORT, OUTLINING PROPO!
CORRLCIIVE AcilotIS 10 CORRECT IDENTIFIED DEFICIEtiCIES.
- 2. PROCEDURE IPC-I-32, REV.
t, "iftlP[RATURE RECORDER (PARILOW PROCEDL'RI REQUIRES IN PART TllAT CALIBRATIDit OF THE TEllPLR AIURE SCH50R$ BE PERF0E!IED EACli SIX (10 Hill 5 BY WIIHDRAllING C AL IBRAIED IHERM0t1ETI'R AtID COMP ARING Tile OUIPUIS AT SEVER AL O
IJTAKE OR DISCHARGE AND PL ACit4G THEff III A BUCKEI OF sfATER HIIH AIllE At4HUAL CALIBRATION COHIRARY TO THESE FEINIS.
3.
IESTIrlG OF Il!E TEI1PERATURE SENSOR SYSTEtts ARE Ellvil(Uttf1ENI AL M0tlITORING ACTIVIT DEFICIEllCIES REL ATIVE 10 QSR AUDIT RPT 77-AIO, " AUDIT OF IP ETSR - THERMAL DISCHARGES," DTD 6/2/77 1 IRAH5t1IIIED TO THE EPC BY, G
L EQU IR EttEHI S,
t.
CID 6/23/77. 1:llIL E IllE HUCL E AR P0llER GEllERATJ 0li DEP ARif1Etti RECEIVED A DRAFT OF Tite ABOVE AUDIT PRIOR 1 LIR TO EPC WITil A COPY 10 05R Oil I/6/78, it!E RESP 0tl5E EXCEEDED THE 30 DAY RESPONSE RECT!HT & DID #10T UUTLIHE 11tE SPECIFIC PR0ro!
O CORRECTIVE ACTIOrl5 10 BE T AKEll 10 CORRECT AUDIT IDFHTIFIED DEFICIENCIES.
2.
SIHCE 12/75 THE IHTAKE TEt1PERATURE PROBE OF THE PARTLou SYSTEtt HAD BEEli CALIBRAIED AI 6 fl0HTH INTERVALS USING A TECllHIQUE DIHER lilAH DESCRIBED BY CALIB DEI AIL LD UPIT1[tl 8 APPROVED PROCEDURES HERE NOT PREPARLD FOR Tile At!HU AL TEt1PERAIURE SENSOR SYS
~
REV.
I.
3.
CALIBRATIPH, HOR FOR Tile REQUIRED tt0tlillLY ILt1PERAIURE SENSOR SYSTEM FUNCTIollAL TESTS.
3 COH1RARY TI TEcil!IICAL SPECIFIC ATI0tl 3.4. I.D REQUIRES LIQUID EFFLUEllIS TO DE C0tiTINUQUSLY MOHITORED AND RECPRDED.
O 785 Atc THE ABOVE 018 At!GilST 31, S LP T EllB E R 1 AliD SEPIEllDER 4, 1978 LIQUID EFFLUElli5 WERE RELEASED FROM IllE UNIT l tt0NITOR T AtlRS IJI THOU' EnV ! Rut!!!EllI AL BEltlG Cat lTIjlunUyLY RECORDED.
e