Forwards Minutes of Engineering Verification Review Committee 820916 Meeting at Plant Site
ML17213A485
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/24/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-115-SL-2, NUDOCS 8209280025
Download: ML17213A485 (6)


Text

REGULATUR lNFORMATION DISTRIBUTION TEM (RIOS) t P

ACCESSION NBR;8209280025 DOC ~ DATE: 82/0$ /24 NOTARIZED: NO DOCKET FACIL:50-389 St. Lucie Planti'Unit 2i Florida Power 8 Light Co ~ 05000389 AUTH ~ NAME AUTHOR AFFILIATION BLODGETTiT,H, Ebasco Services> Inc, (subs, of Enserch Corp,)

IP ~ RECIPIENT AFFILIATION REC NAME E'ISENHUTiD.G. 'ivision of Licensing

SUBJECT:

Forwards minutes of engineering verification review committee 820916 meeting at plant site ~

DISTRIBUTION CODE: B001S COPIES RECEIVED:LTR ~

ENCL $ SIZE:.

TITLE: Li censing Submi t ta1: PSAR/FSAR Amdts L Rel ated Correspondence NQTES!

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A/D LICENSNG 1 0 LIC BR P3 BC 1 0 LIC BR P3 LA 1, 0 NERSESgV ~ 01 1 1 INTERh'AL ELD/HDS2 1 0 IE FILE 1 1

IE/DEP EPDS 35 1 1 IE/DEP/EPLB 36 3 NRR/DE/AEAB 1 0 NRR/DE/CEB 11 1 1 NAR/DE/EQB 13 3 3 NRR/DE/GB 28 2 2 NRR/DE/HGEB 30 2 2 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 24 1 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 34 1 NRR/DHFS/PTRB20 1 1 NRR/DS I/AEB 26 1 1 NRR/DSI/ASB 27 1 1 NRR/DSI/CPB 10 1 1 NRR/DSI/CS8 09 1 NRR/DSI/ETSB 12 1 1 NRR/DSI/ICSB 16 1 1 NRR/DSI/PSB 19 ,1 1 NRR/DS I/RAB 22 ,1 REG R

F DDAMI/MlB 23 04 1

1 1

1 1

0 NRR/DST/LGB RGN2 33 2,?

1 1 EXTERNAL: ACRS 41 6 6 BNL(AMDTS ONLY) 1 DMB/DSS (AMDTS) 1 1 FEMA REP DIV 39 1 LPDR 03 1 1 NRC PDR 02 1 NSIC 05 1 NTIS 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 55 ENCL 49

N m

~

Nmt jr>>> N, [Ny $ ll i, (I

~ it

't K N

~,a II

~ I >> <<

'll t<<y 'l 7'i f Nf f'ii '(1( ~ 1 nit I f / Nr] N p (( I t>>) (I 1'I p I( 115 (7 (I f7 f IrRI>>

e

', I6 lf j j

I 1,(,14$

m>> t>>N tm<<

I7 nN N p Nt

( ~ 1 I

m>>,

> <<f y>> > )I N I( r7 I rl I f(K I I 1 If (I ( ((I R X (I' g ll@ 1(

J',

lr<<IIN li(

I i F

(I r'(

I'l I

I 1

1 NN I

Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y. 10048 September 24,1982 Ltr. No. EVP -115/SL-2 Office of Nuclear Reacto'r Regulation Attention: Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr Eisenhut:

Re: ST. LUCIE UNIT N0.2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM MINUTES OF'MEETINGttached for your information are the minutes of the September 16,1982 EVP Review Committee meeting held at the St. Lucie Unit No. 2 Site.

Very truly yours, T H Blodgett Joint Task Force Chairman THB/rob Attachment CC: Robert E Uhrig, FPL w/att D L Christian, FPL w/att

. 8209280025 820924 PDR ADOCK 05000389 A PDR

, peal

Sheet 1 of 2 ENGINEERING VERIFICATION PROGRAM SL2, EVP REVIEW COMMITTEE MEETING DATE: September 16, 1982 LOCATION: St Lucie Unit No. 2 Site ATTENDEES:

Flor'ida Power & Li ht Com an D L Christian EVP Review Committee Chairman/EVP Task Force Manager

  • E W Dotson - Engineering'Project Manager W F Brannen Assistant to Task Force Manager Ebasco 'Services Incor orated T H Blodgett EVP Task Force Manager E Z Zuchman Project Engineer Combustion En ineerin Inc.

D D Miller - EVP Task Force Manager

  • J C Moulton Project Manager
  • Part-time A. Pur ose of Meetin
1. Discuss completion of Ebasco and C-E independent designs and release of existing designs for comparison.
2. Review the first two independent design packages for completeness.
3. If review process completed at meeting, authorize the Project Teams to release the applicable existing designs.

B. Verification Item '4 (Ebasco)

1. Copies of the H2 Recombiner independent design package were made and distributed by the Ebasco Task Force Manager.
2. Copies of ETF letter EVP-306/SL-2, dated September 15, 1982, and entitled, "Verification Item No. 4 Hydrogen Recombiner Request for Release of Existing Design Documents," were distributed to Review Committee members at the same time.

Sheet 2 of 2 B. Verification Item'4 (Ebasco) (Cont'd)

3. Discussion of the package was started, but it was determined that review could not be completed at the meeting. It was decided that package review would have to continue on an individual member basis,=

with completion scheduled for September 21.

4. September 21, all members were to be contacted by the Committee On Chairman regarding completeness of the package and at that time it would be decided if approval could be granted for release of the existing design.

C. Verification Item C-E)

1. Copies of the Safety Injection Tank'solation Valve independent design package were made and distributed by the C-E Task Force Manager.
2. As with Item 4, it was determined that review would be'arried out on an individual member basis and completed by September 22.

D. Subse uentl Com leted Inde endent Desi n 'Packa es

l. It was agreed that it would be impractical for the Review Committee to convene every few days to review the remaining independent design packages as each is completed.
2. It was determined that each subsequent package would be submitted to the Review Committee via letter to the FPL EVP Task Force Manager/

Review Committee Chairman. Transmittals to individual members would be simultaneously made by the fastest possible means, such as Federal Express.

E. Miscellaneous

l. A synopsis of the EVP Task Force Managers/NRC September 14 meeting to discuss program independence was presented by Mr Christian, with additional comments by Messrs Miller and Blodgett.
2. The written meeting summary is forthcoming from Mr Nerses of the NRC.