ML17309A979

From kanterella
Jump to navigation Jump to search
Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed
ML17309A979
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/31/1999
From: Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17309A980 List:
References
L-99-080, L-99-80, NUDOCS 9904060160
Download: ML17309A979 (6)


Text

~ CATEGORY W ACCESSION NBR:9904060160 FACIL:50-335 St. Luc'3 REGULATORY INFORMATION DXSTRIBUTION SYSTEM (RIDS)

DOC.DATE: 99/0 / 31 NOTARIZED: NO

t. Lucie Plant, Unit 1, Florida Power 50-389 St. Lucie. Plant Unest 2, Florida Power R Light Co.

AUTH.NAME STALL,J.A.

, AUTHOR AFFILIATION Florida Power &. Light Co.

e E Lixg ht Co.

DOCKET 05000335 05000389 RECXP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards reve.sed rev'rds EPIPs including rev 2 to EPIP-OO,rev 2 to C EPXP-09,rev 2 to EPIP-10 S rev 10 to HP-207.Summary of revs listed.

DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR i ENCL SXZE:

ergency Preparedness Plans, Implement'g Procedures, C NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL XD CODE/NAME LTTR ENCL PD2-3 PD 1 1 GLEAVES,W 1 1 INTERNALs FILE CENTER 2 2 IRO/HAGAN,D. 1 1 R/DRPM/PERB 1 1 NUDOCS-ABSTRACT 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1

< (8/

~~ ~y'mM

/~~~g .i~ ~~P NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO 'REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED o UTIO I OU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROI DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPXES REQUIRED: LTTR 9 ENCL

Florida Power 8 Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 March 31, 1999 L-99-080 10 CFR 50 Appendix E U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Emer enc Plan Im lementin Procedures In accordance with 10 CFR 50. Appendix E, enclosed is a copy of each of the revised Emergency Plan Implementing Procedures (EPIP) and a revised procedure that implements the Emergency Plan as listed below.

Number Title Revision Im lementation Date EPIP-00 Discovery 8 Identification of March 24, 1999 An Emergency Condition (Including Chemical, Fire and Natural Emergencies)

EPIP-09 Off-Site Dose Calculations March 24, 1999 EPIP-1 0 Off-Site Radiological Monitoring March 24, 1999 HP-207 Monitoring Evacuated Personnel 10 March 24, 1999 During Emergencies EPIP-00 Revision 2 clarified the training manager responsibilities and incorporated editorial/administrative changes. EPIP-09 Revision 2 added minor administrative changes.

EPIP-1 0 Revision 2 improved status board update instructions and incorporated editorial/administrative changes. HP-207 Revision 10 added minor administrative changes.

If there are any questions regarding these revised procedures, please contact us.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/tlt Enclosures cc:, Regional Administrator, Region II, USNRC (2 copies)

Senior Resident Inspector, USNRC, St. Lucie Plant (w/o) 9904060160 99033%

PDR ADQCK 05000335 F PDR an FPL Groan comnanv

t 4

I r, 1 ~

(%

CA'7EQ0RY REGUL" ~ORY INFORMATION DISTRIBUTI l SYSTEM (RIDS)

-ACCESSION NBR:9904060160 DOC.DATE: 99/03/31 NOTARIZED: NO DOCKET ¹ FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power k Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power S Light Co., 05000389 AUTH'.NAME AUTHOR AFFILIATION STALL,Z.A. Florida Power & Light Co.

RECIP . NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards revised EPIPs including rev 2 to EPIP-OO,rev 2 to EPIP-09,rev 2 to EPIP-10 & rev 10 to HP-207.Summary of revs listed. A DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR i ENCL )

TITLE: OR Submittal: Emergency Preparedness Plans, Implement'g Procedures, SIZE: l C i

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 GLEAVES,W 1 1 INTERN  : FILE CENTE Ol 2 2 IRO/HAGAN,D. 1 1 R/bRPR/PERB 1 1 NUDOCS -ABSTRACT 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 g ~y /cW

~~& D pi~~ <<Qc 5 Q)

E N

~eL NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 March 31, 1999 L-99-080 10 CFR 50 Appendix E U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Emer enc Plan lm lementin Procedures In accordance with 10 CFR 50 Appendix E, enclosed is a copy of each of the revised Emergency Plan Implementing Procedures (EPIP) and a revised procedure that implements the Emergency Plan as listed below.

Number Title Revision Im lementation Date EPIP-00 Discovery & Identification of March 24, 1999 An Emergency Condition (Including Chemical, Fire and Natural Emergencies)

EPIP-09 Off-Site Dose Calculations March 24, 1999 EPIP-10 Off-Site Radiological Monitoring March 24, 1999 HP-207 Monitoring Evacuated Personnel 10 March 24, 1999 During Emergencies EPIP-00 Revision 2 clarified the training manager responsibilities and incorporated editorial/administrative changes. EPIP-09 Revision 2 added minor administrative changes.

EP IP-1 0 Revision 2 improved status board update instructions and incorporated editorial/administrative changes. HP-207 Revision 10 added minor administrative changes.

If there are any questions regarding these revised procedures, please contact us. Y, Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/tlt Enclosures cc: Regional Administrator, Region II, USNRC (2 copies)

Senior Resident Inspector, USNRC, St. Lucie Plant (w/o) 99040b0ib0 99033'i"i ~i PDR ADOCK 05000335I PDR an FPL Group company

\ J