Forwards Joint Ebasco & C-E Engineering Task Force Engineering Verification Program Weekly Status Summary for 821115-19
ML17213A759
Person / Time
Site: Saint Lucie 
Issue date: 11/22/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8211300257
Download: ML17213A759 (9)


Text

'REGULATORY NFORMATION DISTRIBUTION S TEM (RIDS)

'AOCE'SSION NBR:8211300257 DOC ~ DATE: 82/11/22 NOTARI

'D:

NO FACIL50 389 St, Lucie Planti Uniit 2i Florida Power L Light Co ~

AUTH,NAME AUTHOR AFFILIATION BLODGETTiT H, Ebasco Services<

Inc.

(subs.

of Enserch Corp,)

REC IP ~ NAME RECIPIENT AFFILIATION EISENHUTiD ~ G, Division of Licensing

SUBJECT:

Forwards 'joint Ebasco

& C-E engineering task force engineering verification program weekly status summary for 821115~19.

.DISTRIBUTION CODE:

B001S COPIES 'RECEIVED:LTR ENCL SIZE:,

TITLE-Licensing Submittal:

PSAR/FSAR Amdts 8 Related Correspondence NOTES:

gnat) C

'5g DOCKET 05000389 RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR P3 LA INTERNAL: ELD/HDS2 IE/DEP EPDS 35 NRR/DE/AEAB NRR/DE/EGB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 20 NRR/DHFS/KFEBOO NRR/DHFS/OLB 34 NRR/DSI/AE8 26 NRR/DSI/CSB 09 NRR/DS I /METB 1?

NRR

/RAB 22 GF 00 RM/DDAMI/MI8 EXTFRNAI e

ACRS 41 DMB/DSS (AMDTS)

LPDR 03 NSIC 05 COPIES LTTR ENCL 1

0 1

0 1

-0 1

1 1

0 2

1 1

1, 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

0 6

1 1

1 1

1 RECIPIENT ID CODE/NAME LIC BR P3 BC NERSESgV

~

01 IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/GAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/CPB 10 NRR/DS I/ICSB 16 NRR/DS I/PSB 19 NRR/DSI /RSB 23 RGN2 BNL(AMDTS ONLY)

FEMA~REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1

0 1

1 1

1 3

3 1

1

'2 2

1 1

1 1

1 1

1 0

1 1

1 1

1 "3

3 TOTAL NUMBER OF COPIES REQUIRED:

LTTR, 52 ENCL 45

ii<<l i J

>>1 I'I

~

'>> g>>>>fir I

4 f Il

>>4 <<'W jt

]

W I">>

>W'4'$ );

)

W 4

W'W k 4

~)I,1,,<<

~

'~ l

>>I 0

W iu 1,

iqw>>f IE),5 f

~

W if

)

Ij Ij>>f 1

I f 4

i

", g 4

I I

jj

<<f ii )

)I 4 jj g

lii il i

""f>>'">> WW I

'>> 'j>>"

il Whl'j

~ 'lr jj

>>7I If>>II Ij

>>h c, jj 4

!1 I

lf

>>I ll Ill' l>>4>>W!

ll

,i'

>>h>>

4<<>>%

IIX jl f,g W

jj ll

>>h jj,<

4 Ij I jj lfjj,

'I f>>

,>> P, lf, I

I>>

1 j

EI Ij 4

e,,rf fk lr'<<>>>>4

Engineering Verification Task Force Ebasco Services Incorporated Two World Trade Center 15th Floor New York, N. Y. 10048.

November 22,1982 Ltr No. EVP-129/SL-2 Office of Nuclear Reactor Regulation Attention:

Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr Eisenhut:

Re:

ST.

LUCIE UNIT N0.2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

FOR PERIOD'NOVEMBER 15 NOVEMBER 19 1982 Attached for your information is the Weekly Status'ummary of the joint Ebasco and Combustion Engineering Task Force for the period November 15 through November 19,1982.

Very truly yours, T H Blodgett Joint Task Force Chairman THB/rob Attachment cc:

Robert E Uhrig, FPL w/att D L Christian, FPL w/att P ~ ~

~

8211300257 821122 PDR ADOCK 05000389 R

PDR

WC l

ENGINEERING VERIFICATION PROGRAM/SL-2 EBASCO TASK FORCE WEEKLY STATUS

SUMMARY

FOR PERIOD NOVEISER 15 - NOV&SER 19,1982 l.

Independent vs existing 'design comparisons were completed for verification items 3 - 8 during the period.

2.

Thirty-seven'nresolved item (discrepancy) reports (UIRs),

generated by the ETF during the design comparison stage for items 3 8, were presented to the EVP Review Committee during the November 17 and 18 meetings held in Ebasco's New York office.

Eight of the UIRs were considered resolved by the ETF prior to Committee review.

3.

Following is summary of Review Committee action taken on the 37 UIRs:

a.

12 closed out and accepted.

b.

4 conditionally accepted.

c.

16 required information from Project

Team, then recycle to Task Force.

d.

5 required Task Force clarification," then response fr'om Project Team.

4.

Status of work being performed by ETF as interface with C-E Task Force-re expansion of component boundaries for verification items 1 and 2:

a.'Item 1 HPSI Pum

1) Electrical and I&C independent designs were completed and presented to Review Committee for completeness review. Verbal authorization was given to Project Team Nov 19 to release all requested existing design documents to'TF for design comparison.
2) Design comparisons should start Nov 22.

1

3) Independent verifications of actual vs allowable pump nozzle loads and of pump found'ation existing design were completed and transmitted to C-E Task Force Nov 19.

b..Item 2 - SIT Isolation Valve 1)

Same status as electrical and I&C independent designs for HPSI Pump per a.1) above.

2)

Design comparisons expected to start Nov. 22.

5.

The ETF started preparing lists of documents to be requested from Project Team for field installation verification and start-up operation verification phases of the program,i%hat work is scheduled to commence Nov 29 and 30 at St. Lucie jobsite.

6.

The next Status Summary to be issued will cover the two-week period from November 22 - December

4. Both November 25 (Thanksgiving Day) and November

.26 are being observed as holidays in the Ebasco New York and C-E Windsor offices.

ENGINEERING VERIFICATION PROGRAM WEEKLY STATUS

SUMMARY

C-E TASK FORCE NOVEMBER 15 NOVI2$ER 19 1.

In preparation for the EVP Review Committee meeting, the C-E EVP Task Force transmitted Packages documenting 27 unresolved item ( discrepancy) reports to each member of the EVP Review Committee.

Of (the 27 reports slated for Committee action, 6 were considered resolved by the C-E Task Force prior to Committee review.

2.

A Review Committee meeting was held at C-E on Friday, November 19, with all

.members attending.

Committee action was as follows:

-12 items were closed out, and accepted by the Committee;

-10 items were recycled to the Task Force for additional engineering analysis;

-5 items were held for additional on-site engineering review prior to further Committee action.

3.

Preparation of on-site verification checklists for C-E EVP Items 1 and 2

continued during this report period. On-site verification of installation and start-up operational test phases will begin about November 29.

4.

The C-E EVP Task Force will provide FPL with advance notification of on-site documentation requirements early in the next report period (approximately one week before field verification begins).

TELEPHONE CONVERSATION LOG ENGINEERING VERIFICATION PROGRAM - SL2 MEEK OF ll-l -82 DATE OF TELECON PARTICIPATING ORGANIZATIONS GENERAL SUBJECT OF TELECON PREPARER OF TELECON RECORD 11/18/82 C-E/Ebasco Review Committee Meeting plans for ll/19 C-E EVP Task Force Mgr