ML17213A582
| ML17213A582 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 10/20/1982 |
| From: | Blodgett T EBASCO SERVICES, INC. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| EVP-121-SL-2, NUDOCS 8210260114 | |
| Download: ML17213A582 (10) | |
Text
REGULATORY FORMATION DISTRIBUTION SY M (RIDS)
ACCESSION NBR:8210260114 DOC ~ DATE: 82/10/20 NOTARIZED:
NO FACIL:50 389 St. Lucie Planti Uni;t 2i Florida Power L Light Co.
AUTH NAME AUTHOR AFFILIATION BLODGETT<T,H, Ebasco Servicesi Inc. (subs, of Enserch Corp,)
- RECIP,NAME RECIPIENT AFFILIATION EISENHUT,D ~ G ~
Division of Licensing
SUBJECT:
Forwards minutes of 821006"07 meeting r e engineering verification program, Meeting attended by utiliEbasco 8
C-E
-sk force managers'ISTRIBUTION CODE:
B001S
'COPIES 'RECEIVED:LTR ENCL SIZE:,
l
/
TITLE: Licensing Submittal:,PSAR/FSAR Amdts
& Related Correspondence NOTES:
DOCKET 05000389 RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR P3 LA INTERNAL: ELD/HDS2 IE/DEP EPDS 35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 20 NRR/DHFS/HFEBPO NRR/DHFS/OLB 3Q NRR/DS I/AEB 26 NRR/DS I/CPB 10 NRR/DSI/ETSB 12 NRR/DS I/PSB 19 23
, 04 RM/DDAMI/MIB EXTERNAL: ACRS 41 DMB/DSS (AMDTS)
LPDR 03 NSIC 05 COPIES LTTR ENCL 0
1 0
1.
0 1
1 1
0 3
3 2
2 1
1 1
1 1
1
'1
'1 1
1 1
1 1
1 1
1 1
1 1
1 1
0 6
6 1
1 1
1 1
1 RECIPIENT ID CODE/NAME LIC BR 03 BC NERSESi V, 01 IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DSI/CSB 09 NRR/DSI/ICSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN2 BNL(AMDTS ONLY)
FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1
0 1
1 1
1 3
3 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
2 2
1 1
1 1
1 1
1 1
~TOTAL NUMBER OF COPIES REQUIRED:
LTTR 55 ENCL 09
~ c", rIl f,i <J,
~ jc Ir
$ ) ii)
BIt I l I't ~4 "F 'I c', ] f: lcjjI)
I'c "IIl lI I
>,'c j c'1 'l) c
'j' tkc'" l l.'X'3 lrf jr, JI
, l,.jh,lCIX'I.l
'g
)'1$ ;,1
<<AI j~ l IIi'.I
~
'rl
'ia ll lhr. I l IIX'=1 j
'T lhc.-> l lX"J,A
',r I,, ) g1r~'Ig" I l IX c, "Xc~.j" Cr 1
~ n lt'T4',el% I,) "
-)))
i JL I
c gr Iji S
c Ij I, I IF r'.
)
~'Ic" c'
t II f
lI f~ss j'7
~,'7 $
ni gFIj II, 't c
Engineering Verification Task Force Ebasco Services Incorporated Two World, Trade Center-15th Floor New York, N. Y. 10048 October 20,1982 Ltr No. EVP-121/SL-2 Office of Nuclear Reactor Regulation Attention:
Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr Eisenhut:
Re:
ST.LUCIE UNIT-N0.2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM MINUTES OF MEETING Attached for your information are the minutes of the October 6
& 7, 1982 meeting attended by the FPL, Ebasco and C-E EVP Task Force Managers in Florida.
Very truly yours, THB/rob Attachment T H Blodgett Joint Task Force Chairman cc:
Robert E Uhrig, FPL w/att D L Christian, FPL w/att f
8210260114 82i020 PDR ADOCK 05000389 A
0 ll I,
l
hect 1 of 3 ENGINEERING VERIFICATION PROGRAM-SL2 EVP TASK FORCE MANAGERS MEETING DATE: October 6
& 7, 1982 LOCATION: Juno Beach, Florida
& St. Lucie Unit No.
2 Site ATTENDEES:
Florida Power
& Li ht Com an D L Christian EVP Task Force Manager
- W F Brannen Assistant to Task Force Manage'r Combustion Engineering, Inc D D Mi er EVP Task Force Manager Ebasco Services Incor orated T H Blodgett EVP Task Force Manager
- (Part-Time, and October 6 only)
A.
DESIGN REVIEW PHASE
- 1. VERIFICATION ITEMS 1-2 (C-E)
Mr Miller summarized status of the C-E items.
- a. Item 2 (SIT Isolation Valve Comparison of independent and existing designs in progress following receipt of a portion of the existing design.
- b. Item 1 (HPSI Pum )
Independent design package completed and copies transmitted/
distributed to Review Committee members Oct 5/Oct 6 for completeness review. Requested Committee approval to release existing design for comparison by October 11.
- 2. VERIFICATION ITEMS 3-8 (EBASCO Mr Blodgett summarized status of the Ebasco items.
- a. Item 4 (H2 Recombiner)
Comparison of independent and existing designs continues.
A request for additional existing design documents was made Oct 4.
b.
Xtem 3 (Cntrl Rm Eme enc Cleanu S st. Valve)
Comparison of designs started following receipt of first existing design documents.
hect 2 of 3
S stem)
The independent design pkg was completed and copies transmitted Oct 4 via Federal Express to Review Committee members for completeness review.
Committee approval to release existing design for comparison-requested by October 8.
- d. Item 5 (Area Radiation Monitor)
Independent design pkg completed and copies transmitted Oct 4 via. Federal Express to,Review Committee members for completeness review. Requested Committee authorization to release existing design for comparsion by October ll.
e.'tem 6 (Tornado Missile Shield Door)
Independent design pkg completed and copies transmitted/
distributed-to Review Committee members Oct 5/Oct 6 for'.
completeness review. Requested Committee authorization to release existing design for comparison by October 13.
C
- f. Item 7 (Main Steam Isolation Valve)
Response
received October 4 re two outstanding design input items requested via September.
2 letter. The independent design package is now being finalized and scheduled for transmittal to Review Committee members for completeness review October 8.
3.
DESIGN COMPARISON SHEET I
Discussed the Design Comparison Sheet format being utilized by each Task Force.
ADDITIONAL C-E/EBASCO WORK SCOPE
- a. Held preliminary discussions concerning the probability of expanding present boundaries for the C-E verification items
, to include interface with the Ebasco Task Force. In particular, this would involve ETF independent design activity regarding electrical power supply and instrumentation 6 control systems.
- b. Mr Christian was asked to provide written authorization for the additional work scope.
.B.
'IELD INSTALLATIONVERIFICATION PHASE
- l. It is expected that jobsite work for the various verification items will be performed by the Task Force during one continuous time period rather than at several separate times;-
- 2. The FPL Engineering Representative, Mr Ed Preast,'as'ntroduced to Messrs Miller and Blodgett by Mr Christian at, the jobsite October 7.
- 3. The FPL Engineering Representative will serve as the main contact forEbasco and C-E Task Force members during the field installation verification phase.
1
- 4. Task Force members will obtain photo identification badges upon reporting to the jobsite.
Sheet 3 of 3
- 5. Working space will be provided for the Task Force in the main non-manual employee office building.
- 6. Hardhats, flashlights, clipboards, office supplies,
- raingear,
.etc will be furnished to the Task Force as required.
- 7. Task Force will plan to follow normal daily working hours while at the jobsite, i.e. 7'.00-11:00 and 11:30-3:30.
- 8. Mr Christian will investigate as to what special arrangements may be necessary for possible Saturday or Sunday work by Task Force at jobsite.
C.
MISCELLANEOUS
- l. UPCOMING MEETINGS The next meeting of the Task Force Managers was tentatively scheduled for October 21 in New York.
~