Forwards Minutes of 821006-07 Meeting W/Util,Ebasco & C-E Task Force Managers Re Engineering Verification Program
ML17213A582
Person / Time
Site: Saint Lucie 
Issue date: 10/20/1982
From: Blodgett T
EBASCO SERVICES, INC.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
EVP-121-SL-2, NUDOCS 8210260114
Download: ML17213A582 (10)


Text

REGULATORY FORMATION DISTRIBUTION SY M (RIDS)

ACCESSION NBR:8210260114 DOC ~ DATE: 82/10/20 NOTARIZED:

NO FACIL:50 389 St. Lucie Planti Uni;t 2i Florida Power L Light Co.

AUTH NAME AUTHOR AFFILIATION BLODGETT<T,H, Ebasco Servicesi Inc. (subs, of Enserch Corp,)

RECIP,NAME RECIPIENT AFFILIATION EISENHUT,D ~ G ~

Division of Licensing

SUBJECT:

Forwards minutes of 821006"07 meeting r e engineering verification program, Meeting attended by utiliEbasco 8

C-E

-sk force managers'ISTRIBUTION CODE:

B001S

'COPIES 'RECEIVED:LTR ENCL SIZE:,

l

/

TITLE: Licensing Submittal:,PSAR/FSAR Amdts

& Related Correspondence NOTES:

DOCKET 05000389 RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR P3 LA INTERNAL: ELD/HDS2 IE/DEP EPDS 35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 20 NRR/DHFS/HFEBPO NRR/DHFS/OLB 3Q NRR/DS I/AEB 26 NRR/DS I/CPB 10 NRR/DSI/ETSB 12 NRR/DS I/PSB 19 23

, 04 RM/DDAMI/MIB EXTERNAL: ACRS 41 DMB/DSS (AMDTS)

LPDR 03 NSIC 05 COPIES LTTR ENCL 0

1 0

1.

0 1

1 1

0 3

3 2

2 1

1 1

1 1

1

'1

'1 1

1 1

1 1

1 1

1 1

1 1

1 1

0 6

6 1

1 1

1 1

1 RECIPIENT ID CODE/NAME LIC BR 03 BC NERSESi V, 01 IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27 NRR/DSI/CSB 09 NRR/DSI/ICSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 RGN2 BNL(AMDTS ONLY)

FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1

0 1

1 1

1 3

3 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

2 2

1 1

1 1

1 1

1 1

~TOTAL NUMBER OF COPIES REQUIRED:

LTTR 55 ENCL 09

~ c", rIl f,i <J,

~ jc Ir

$ ) ii)

BIt I l I't ~4 "F 'I c', ] f: lcjjI)

I'c "IIl lI I

>,'c j c'1 'l) c

'j' tkc'" l l.'X'3 lrf jr, JI

, l,.jh,lCIX'I.l

'g

)'1$ ;,1

<<AI j~ l IIi'.I

~

'rl

'ia ll lhr. I l IIX'=1 j

'T lhc.-> l lX"J,A

',r I,, ) g1r~'Ig" I l IX c, "Xc~.j" Cr 1

~ n lt'T4',el% I,) "

-)))

i JL I

c gr Iji S

c Ij I, I IF r'.

)

~'Ic" c'

t II f

lI f~ss j'7

~,'7 $

ni gFIj II, 't c

Engineering Verification Task Force Ebasco Services Incorporated Two World, Trade Center-15th Floor New York, N. Y. 10048 October 20,1982 Ltr No. EVP-121/SL-2 Office of Nuclear Reactor Regulation Attention:

Mr Darrell G Eisenhut, Director Division of Licensing U S Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Mr Eisenhut:

Re:

ST.LUCIE UNIT-N0.2 DOCKET NO. 50-389 ENGINEERING VERIFICATION PROGRAM MINUTES OF MEETING Attached for your information are the minutes of the October 6

& 7, 1982 meeting attended by the FPL, Ebasco and C-E EVP Task Force Managers in Florida.

Very truly yours, THB/rob Attachment T H Blodgett Joint Task Force Chairman cc:

Robert E Uhrig, FPL w/att D L Christian, FPL w/att f

8210260114 82i020 PDR ADOCK 05000389 A

PDR

0 ll I,

l

hect 1 of 3 ENGINEERING VERIFICATION PROGRAM-SL2 EVP TASK FORCE MANAGERS MEETING DATE: October 6

& 7, 1982 LOCATION: Juno Beach, Florida

& St. Lucie Unit No.

2 Site ATTENDEES:

Florida Power

& Li ht Com an D L Christian EVP Task Force Manager

  • W F Brannen Assistant to Task Force Manage'r Combustion Engineering, Inc D D Mi er EVP Task Force Manager Ebasco Services Incor orated T H Blodgett EVP Task Force Manager
  • (Part-Time, and October 6 only)

A.

DESIGN REVIEW PHASE

1. VERIFICATION ITEMS 1-2 (C-E)

Mr Miller summarized status of the C-E items.

a. Item 2 (SIT Isolation Valve Comparison of independent and existing designs in progress following receipt of a portion of the existing design.
b. Item 1 (HPSI Pum )

Independent design package completed and copies transmitted/

distributed to Review Committee members Oct 5/Oct 6 for completeness review. Requested Committee approval to release existing design for comparison by October 11.

2. VERIFICATION ITEMS 3-8 (EBASCO Mr Blodgett summarized status of the Ebasco items.
a. Item 4 (H2 Recombiner)

Comparison of independent and existing designs continues.

A request for additional existing design documents was made Oct 4.

b.

Xtem 3 (Cntrl Rm Eme enc Cleanu S st. Valve)

Comparison of designs started following receipt of first existing design documents.

hect 2 of 3

c. Item 8 (HEPA Filter For ECCS, Area Vent.

S stem)

The independent design pkg was completed and copies transmitted Oct 4 via Federal Express to Review Committee members for completeness review.

Committee approval to release existing design for comparison-requested by October 8.

d. Item 5 (Area Radiation Monitor)

Independent design pkg completed and copies transmitted Oct 4 via. Federal Express to,Review Committee members for completeness review. Requested Committee authorization to release existing design for comparsion by October ll.

e.'tem 6 (Tornado Missile Shield Door)

Independent design pkg completed and copies transmitted/

distributed-to Review Committee members Oct 5/Oct 6 for'.

completeness review. Requested Committee authorization to release existing design for comparison by October 13.

C

f. Item 7 (Main Steam Isolation Valve)

Response

received October 4 re two outstanding design input items requested via September.

2 letter. The independent design package is now being finalized and scheduled for transmittal to Review Committee members for completeness review October 8.

3.

DESIGN COMPARISON SHEET I

Discussed the Design Comparison Sheet format being utilized by each Task Force.

ADDITIONAL C-E/EBASCO WORK SCOPE

a. Held preliminary discussions concerning the probability of expanding present boundaries for the C-E verification items

, to include interface with the Ebasco Task Force. In particular, this would involve ETF independent design activity regarding electrical power supply and instrumentation 6 control systems.

b. Mr Christian was asked to provide written authorization for the additional work scope.

.B.

'IELD INSTALLATIONVERIFICATION PHASE

l. It is expected that jobsite work for the various verification items will be performed by the Task Force during one continuous time period rather than at several separate times;-
2. The FPL Engineering Representative, Mr Ed Preast,'as'ntroduced to Messrs Miller and Blodgett by Mr Christian at, the jobsite October 7.
3. The FPL Engineering Representative will serve as the main contact forEbasco and C-E Task Force members during the field installation verification phase.

1

4. Task Force members will obtain photo identification badges upon reporting to the jobsite.

Sheet 3 of 3

5. Working space will be provided for the Task Force in the main non-manual employee office building.
6. Hardhats, flashlights, clipboards, office supplies,
raingear,

.etc will be furnished to the Task Force as required.

7. Task Force will plan to follow normal daily working hours while at the jobsite, i.e. 7'.00-11:00 and 11:30-3:30.
8. Mr Christian will investigate as to what special arrangements may be necessary for possible Saturday or Sunday work by Task Force at jobsite.

C.

MISCELLANEOUS

l. UPCOMING MEETINGS The next meeting of the Task Force Managers was tentatively scheduled for October 21 in New York.

~

aP.

-s