MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.
COMPLETED IIY T~ Chilson t9aSl=
MONTH AUGUST i 1980 DAY AVERAGE DAlLYPOWER LEVEL DAY AVERAGE DAlLYPOWER LEVEL (MWe.Net} (MWe.Ãet )
I 643 17 653 639 18 647 637 20 653 64 21 647 22 503 652 664 24 658 25 657 10 655 16 652 658 17 12 656 28 642 I3 656 o9 643,.
656 30 644 IS 649 31 648 656 16 NOTE: Average daily power level greater than 646 MWe due to cooler condenser cooling INSTRUCTlONS water.
On this format. list the aveta8e daily unit power Ie> eI in MWe.Net for each day in the rep<>rtin8 tn>>nth. C>>n>pute to the nearest whole megawat t.
(ol77)
OPERATING DATA REPORT DOCKET NO.
DA~ ~S~ e. 980 COMPLETED BY 2L3~31Q.son TEI.EPHONE +~~2-3824 OPERATING STATUS Turke Point Unit No. 3 Notes Unit No. 3 operated
- 1. Unit Name:
at approximately 100X R.P.,
- 2. Reporting Period: of
- 3. Licensed Thermal Power (MWt):
except for outage Aug.
760 6-7, 1980
- 4. Nameplate Rating (Gross MWe):
- 5. Design EIcctrical Rating (Net MWe): 693
- 6. Maximum Dependable Capacity (Gross MWe): 680
- 7. Maximum Dependable Capacity (Net MWc):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7} Since Last Report, Give Reasons:
Maximum De endable Ca acit Gross MVe has been rerated to the most restricted seasonal conditions (summer) experienced. Maximum Dependable Capacity (Net MWe) has been rerated accordingly.
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 744.0 4 979.7 52 249.2
- 13. Reactor Reserve Shutdown Hours 213.4
- 14. Hours Generator On. Line 737. 9 4 &09.4 50 499.6
- 15. Unit Reserve Shutdown Hours 121.8
- 16. Gross Thermal Energy Generated (MWH) 1 613 090 10 410 368 101 879 002
- 17. Gross Electrical Energy Generated (MWH) 503 570 3 275 415 32 356 415
- 18. Net Electrical Energy Generated (MWH) 478 174 3 104 278 30 626 372
- 19. Unit Service Factor 99.2 82.1 74.4
- 20. Unit Availability Factor 99.2 82.1 74.6
- 21. Unit Capacity Factor (Using MDC Net) 9.5 82.1 70. 2
- 22. Unit Capacity Factor (Using DER Nct) 6. '5.1 D. Unit Forced Outage Rate 0.8 1.3 2.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
- Oct. 5 - Nov. 1 19&0.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup
- 26. Units ln Test Status (Prior to Commercial Operation>: Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (i>(77)
UNIT SHUTDOWNS AND POIVER REDUIONS DOCKET NO.
80 El Liccnscc 0ce<<
s~ Cause & Corrective Q
N<<. I)at>> CL t- c 5L'~
Event Vl C ~
Action lo C Report ~ rn Cr Q Prevent Rccurrcncc
~ C/l Cr 16 80-08-06 6.1 B N/A CB MOTOR X Unit No. 3 was removed from service due to low oil level in reactor coolant pump motor No. 3C. Cor-rective actions included adding oil. (Nuclear System)
I 3 4 I': F<<reed Reason: Method: Exhibit G - Instructions S: Sch>>du!cd A.Equipment Failure (Explain) I.Manual for Preparation ol Data B.Maintenance or Test- 2.Manual Scram. Entry Shccts for Licensee C-Refueling 3-Automatic Scrant. Event Report (LER) Fil>> (NUREC.
D.R>>gulatory Restriction 4.Other (Explain) OI6()
L'.Operator Training & Liccnsc Examination F-Administrative G-Operational Error (Explain) Exhibit I - Same Sour>>>>
II Other (Explain)
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50 251 COMPI.ETED IIY V- T ~ ChilSOn MONTH AUGUST 1980 DAY AVERAGE DAlLYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (h)We.Net) (MWe.Net)
I 633 17 639 634 635 19 635 630 20 634 633 21 635 640 22 636 644 638 645 640 644 25 642 10 26 634 630 28 6 2 13 640 '79 641 30 636 15 31 16 640 INSTRUC11ONS Qn this format. list the average daily unit piiwer le~pl in MWe.Net for each day tn the reportin8 inonth. Crnnpute to the nearest whole rnegawat t.
(ril77)
OPERATING DATA REPORT NO..'iQ=~
DOCKET DATE COMPLETED BY
~~980 2LX.~~son TELEPHONE ~F52-3824 OPERATING STATUS I UdtN . Turke Point Unit No. 4 Notes - Unit No. 4 operated
- 2. Reporting Period:
at approximately 100K R.P.
- 3. Licensed Thermal Power (MWt): 2200
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
e 646
- 7. Maximum Dependable Capacity (Net MWe):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
Maximum De endable Ca acit (Gross MRe) has been rerated to the most restricted seasonal conditions summer ex erieaced. Maximum De endable Ca acit Net MMe has been rerated accordingly.
- 9. Power Level To Which Restricted. IfAny (Net MWe): NONE
- 10. Reasons For Restrictions, lfAny:
TMa Month Yr..to.Date Cumulative "I I. Hours In Reporting Period 744.0
- 12. Number Of Hours Reactor Was Critical 4 532nl
- 13. Reactor Reserve Shutdown Hours 12.3 -166.6 4 627.3
- 15. Unit Reserve Shutdown Hours 12.3 31.2 1 633 024 9 629 136 90 848 116
- 16. Gross Thermal Energy Generated (MWH)
~4282 la. Grass Eleerrirnl Energy Generereg (grlyHl
- 19. Unit Service Factor n e slssss 2 997 355 75.9 28 900 833 70.8
- 20. Unit Availability Factor 100.0 76.1 70.9
- 21. Unit Capacity Factor (Using MDC Net) 98. 6 75.1 69.0
~~. Unit Capacity Factor (Using DER Net) 92.0 70.0 64.1
- 23. Unit Forced Outage Rate 0.3 3.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):
maintenance and ins ections >> Nov. 9 1980 - Jan. 10, 1981.
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
2&. Units ln Test Status l Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION Ig>/77)
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORTMONTII AUGUST, 1980 S52-~
TELEPH0>K +30%t t
gr, I
C rl CO c o 2<
C ILI Liccoscc 0 V Cause h Corrective l)alc Vl 'a Q t$ r3 Z gee Event IA Action to 0~z Q
Report > cn'Cr 0 Prcvcnt Recurrcocc
~ CA N 0 N I
3 F: Forced Reason: hlethod:
S: Scl>edulcd Exhibit G - Instructions A.Equipment Failure (Explain) I.Manual for Preparation of Data II hlaintenance or Test 2.Manual Scram. Entry Sheets for Licensee C.Refueling. 3.Autotoatic Scraol. Evcot Report (LER) File (NUREG.
D.Regulatory Restriction 4ther (Explain) 016I )
L.Operator Training Ec Liccosc Examination F Administrative G Operational Error (Fxplain)
Exhibit I - Salllc Sollrcc
('J/77) II Other (Explain)
AVERAGE DAILYUNIT POWER LEVEL COMPLETED IIY V. T. Chilson DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) (MWe.Net) 7 17 794 18 673 796 19 787 777 20 786 77 725'83 792 791 790 791 95 782 10 26 757 798 37 << 759 797 2$ 781 718 >9 779 126 30 780 15 255 31 749 16 394 NOTE: Average daily power level greater than 777 MNe due to cooler condenser cooling water.
INSTRUCTIONS On this format. list the avcral(c daily unit p>>wcr le~el in MIVe Nct for each day in the rep>>rtin>t n>>>nth. C>>rnpute to thc nearest whole megawatt.
(o(77)
OPERATING DATA REPORT DOCKET NO. 'HL3Zi DATE R@~~980-COMPLETED BY T. Chilson TELEPHONE 552-3824 OPERATING STATUS I. Unit Name St. Lucie Unit No. 1 Notes - Unit operated at
- 2. Reporting Period:
approximately 100X R.P.,
3., Licensed Thermal Power (MWt):
2560 except for outages of Aug.
850 14, 14-15, and 16-18, 1980,
- 4. Nameplate Rating (Gross MWe}:
802 and reduced load operation S. Design Electrical Rating (Net MWe):
of Aug.14-18, 1980.
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
- 8. IfChanges Occur in Ca pacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Net MWe):
IO. Reasons For Restrictions, lf Any:
This Month Yr..to-Date Cumulative I I. Hours In Reporting Period 744.0 5 855.0 32 399.0.
72 .0 4 2 2 l3. Reactor Reserve Shutdown Hours 129. 5
- 14. Hours Generator On-Line 701.4 3 889.7 24 719.7 IS. Unit Reserve Shutdown Hours 7.3 7.3 39.3 I 7. Gross Electrical Energy Generated (MWH) 551 240 3 101 490 1 395 990 IS. Net Electrical Energy Generated (MWH) 519 201 2 915 036 18 242 932 l9. Unit Service Factor 94.3 66.4 76.3
- 20. Unit Availability Factor 76.4 8 .8 64.1 72. 5
- 22. Unit Capacity Factor (Using DER Net) 87.0 62.1 70.2
- 23. Unit Forced Outage Rate '.4 Z4. Shutdowns Scheduled Over Next 6 Months {Type, Date. and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
'6. Units In Test Status I Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COhtMERCIAL OPERATION
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
No.l Page 1 of 2 80 iW!l 552-3824 cEI I I cA ~ Liccn sec C+Q C lh Cause Ec Corrective P Q Cl Vo. Date Vl rj Event Actiun lo CS Q E t" A ~co g Report > cn Cr O Prcvcnt Recurrcncc Cr 80-08-14 S 10.7 N/A TRANSP Unit was removed from service to isolate main power transformer No. 1B to repair oil leak. Cor-rective actions included installing new bushing. (Non-nuclear system) 12 80-08-14 B N/A TRANSP Load was limited to the capacity of main transformer No. 1A. (Non-nuclear system) 13 80-08-14 7.3 N/A TRANSP Unit was removed from service to pro-tect personnel using a crane to re-move a faulty bushing from main power transformer No. 1B. (Non-nuclear system)
I 3 F: I'orccd Reason: hiethod: Exhibit G - Instructions S: Scheduled A.Equipment Failure (Explain) I-Manual I'or Preparation of Data B.hIaintenance oi Test- 2 hlanual Scratn. Entry Sheets I'or Licensee C.Refueling 3-Autotnalic Scram. Event Report (LER) File (NUREG.
D-Regulatory Restriction 4-Other (Explain) OI6 I )
L-Operator Training Ec Liccnsc Examination F.Adminis t ra tive 5 G-Operational Error (Fxplain) Exhibit I ~ Satne Source II.Other (Explain)
UNIT SIIUTDOWNS AND POWER REDUCTIONS . RL=335-UNIT NAME No.l COMPLETED BY 80 TELEPIIONE 305 552-382 Page 2 of 2 I
C r> ~J El ~ L 0 Liccoscc C<
II'J Cause k Corrective Nii. Date 0- a ~ A Event Action lo W~ Q t
O~AK J Rcport -" cn G 2Q Q Prevent Recurrcncc
~ C/l 14 80-08-17 24.6 B N/A EG TRANSP Unit was removed from service to install new bushing and return main power transformer No. 1B to service.
(Non-nuclear system)
I': Forced Rcasolt: hlethod: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) I -hianual for Preparation oi'Data 8 Maintenance or Test ~
2 hlanual Scram. Entry Sheets I'or Licensee C.Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4 Other (Explain) OI6I )
E Operator Training 8c Liccnsc Examination F.Administrative
., G Operational Error (Fxplain) Exhibit I - Sante SourlY.
('>/77) II.Other (Explaitt)
P.O. 3OX 529100, MIAMI, FL 33152 FLORIOA POWER 4 LIGHT COMPANY September 6, 1980 Office of Management Information and Program Controls U. S. Regulatory Commission washington, D. C. 20555 Gentlemen:
Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
Very truly yours, D. chmidt Vice President Power Resources VTC/ddc cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire e P' SER"ING P=QP'
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50 250 Turkey Point UNIT Unit No. 3 DATE Se t. 6 1980 COMPLETED BY V.. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH AUGUST, 1980 Unit No. 3 operated at approximately 100% R.P., except for outage of Aug. 6-7, 1980. Refer to "Unit Shutdowns and Power Reductions" section of August, 1980, Operating Status Report for additional infor-mation.
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.
- ~
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50 - '251 Turkey .Point UNIT Unit No. 4 DATE Se t. 6, 1980 COMPLETED BY V. T. Chilson TELEPHONE. (305) 552-3824 REPORT MONTH AUGUST 1980 Unit No. 4 operated at approximately 100%, R.P. Refer to "Unit Shut-downs and Power Reductions" section of the August, 1980 Operating Status Report for additional information.
Major Safety-related maintenance activities performed duning the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 in progress.
Florida Power & Light Company commitments for NUREG-'0578 implementation are continuning. Refer to correspondence between FPL and NRC for ad-ditional information.
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50 335 St. Lucie UNIT Unit No. 1 DATE Se t. 6 1980 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH Unit operated at approximately 100% R.P., except for outages of August 14, 14-15, and 16-18, 1980, and reduced load operation of August 14-18, 1980. Refer to "Unit Shutdowns and Power Reductions" section of the August, 1980, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Florida Power G Light Company Commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for.ad-ditional information.
A modification to provide redundant 15 volt power supply to each Control Element Assembly drive mechanism core power programmer is in progress.