Monthly Operating Repts for Sept 1981
ML17341A586
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 10/12/1981
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17341A585 List:
References
NUDOCS 8110200204
Download: ML17341A586 (20)


Text

E AVEIIAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT Unzt No. 3 DATE Oct 12 1981 COMPLETED IIY V. T ~ Chi 1 son TELEPHONE ~305) 552-3666 Se tember 1981 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (hfWe.Nct) (i>>IWe-Net) 17 IS 19 20 2l 22 23 24

')5 10 26 27 2S I3 29 l4 30 l5 l6 INSTRUCTIONS On this format. list thc average daily unit p>>wcr.le~el in Mme-Net for each day in the,rcp<>rting tn>>nth. C>>mput<< to the nearest whole megawat t.

('r/771 8i iOi2 8ii0200204 05000250: P'.

PDR ADOCK R I IPDR

1

.1

OPERATING DATA REPORT DOCKET NO.

DATE ~Ott. 1 1981

'COMPLETED BY ~T. Chllson TELEPHONE ~~552-3666 OPERATING STATUS Turkey Point Unit No. 3 Notes

1. Unit Name'eptember
2. Reporting Period:

1981 Unit No. 3 remained out of seMice due to Steam "

3. Licensed Thermal Power (MWt): Generator Repair Propram
4. Nameplate Rating (Gross MWe): (continued from previous
5. Design Electrical Rating (Net M We):

month)'.

IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions, lf Any:

This Month Yr.-to-Date Cumulative

'l l. Hours In Reporting Period 720'. 0 6 '551.0 77 336.6

12. Number Of Hours Reactor Was Critical 1 '459.3 55 760.1
13. Reactor Reserve Shutdown Hours 631.0 844.4 14., Hours Generator On-Line 1 385.6.- 53 891.
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 980 415 34 69 ttt
18. Net Electrical Energy Generated (MWH) 1 383 916 408 32 825 89
19. Unit Service Factor 4.2 69.7
20. Unit Availability Factor 24.2 69.8
21. Unit Capacity Factor (Using MDC Net) 21 ' 66.0
22. Unit Capacity Factor (Using DER Net) 20. 2 61.2
23. Unit Forced Outage Rate 49.0 5.1
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

('t/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAMF Turke Point .Unit No. 3 DATE Oct. 12 1981 COMPLETED Bp V.T. Chilson I

CJ Licenscc CJ Cause h. Corrective Vo. nate Event g CC Action to Report = Prevent Recurrence 05 81-06-24 720.0 B 4 HB HTEXCH Unzt No. 3 Steam Generator Repaa.r (F) Program in progress (Continued from previous month)

F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain)  ! -hlanual for Preparation of Data B-h(aintenance or Test- 2-Manual Scram. Entry Sheets I'or Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4.erin~Exp(ant Continuing OI 6I )

E-Operator Training'icense Examination 5 Load Reduction F-Administrative 9 Other (Explain)

G-Operational Error (Explain) Exhibit I ~

Sante Source

('I/77) II Other (Explairt)

4 AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

Unit No 4 Oct. 12, 1981 COMPLETED BY V.T. Chilson TELEPHONE MONTH Se tember, 1981 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DA1LY POWER LEVEL (M We-Net ) (MWe-Net)

I 661 17 663 663 18 604 661 19 342 664 662 20 666 21 667 661 22 669 661 23 669 665 673 663 25 679'82 661 10 26 662 683 662 28 680 662 678 13 29 678 14 661 30 15 661 664 NOTE: Average daily power 16 level greater than 646 MWe due to cooler condenser cooling water.

INSTRUCTIONS On this for)r)at, list the average daily unit power level, in MWe-Net for each day in the reporting month. Compote to the nearest whole n)egawat t.

('1 /771

OPERATING DATA REPORT DOCKET NO.

DATE

'COMPLETED BY TELEPHONE

~~

V.T. Chilson

~305 55 -3666 1981 OPERATING STATUS

1. Unit Name.

Turkey Point Unit No. 4 Notes

2. Reporting Period:

September 1981 Unit No. 4 operated at 2200 approximately 100X R.P.

3. Licensed Thermal Power (MWt):

except for outage of

4. Nameplate Rating (Gross MWe): October 18-19, 1981.
5. Design Electrical Rating (Net MWe):

80

6. Maximum Dependable Capacity (Gross MWe}:

7 .Mxa imum De p endable Ca p acit y(Net M We: )

8. If Changes'Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If'Any (Net MWe):
10. Reasons For Restrictions, lf Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 720.0 6 551.0 71 064.0
12. Number Of Hours'Reactor Was Critical ,711. 4 5 935.4 52 948.2
13. Reactor Reserve Shutdown Hours 166.6
14. Hours Generator On-Line 4 127.6
15. Unit Reserve Shutdown Hours 31.2
16. Gross Thermal Energy Ge'nerated (MWH) 1 555 100 12 763 999 107 145 354
17. Gross Electrical Energy Generated (MWH) 495 200 4 081 344 34 054 517
18. Net Electrical Energy Generated (MWH) 3 876 482 32 260 502
19. Unit Service Factor 98. 6 i89. 3 71.9
20. Unit Availability Factor

'89. 3 72.0

21. Unit Capacity Factor (Using MDC Net) 98.2 88.8 70.5

'22. Unit Capacity Factor (Using DER Net) '85. 4 65.5

23. Unit Forced Outage, Rate 3.8 3.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

Scheduled refuelin maintenance, and ins ection Oct. 25 Dec. 26, 1981

25. If Shut Down At End'Of Report Period, Fstimated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INIT!AL CRITICALITY INITIAL ELECTRICITY'OMMERCIAL OPERATION

(')/77 )

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

urke Poin t Uni t No. 4 DATF Oct. 12 19 1 I

Lice nscc Cause & Corrective Dale Event Action to Rcport = Prcvcnt Recurrence

~ Ch 12 81-10-18 10. 1. B HB VALVOP Unit was removed from service to (D) repair instrument air leaks on both pressurizer spray control valves.

Corrective actions'ncluded re-torquing valve operator flange bolts.

(Nuclear system) 3 4 F: Forced Reason: Method: Exhibit G ~ Instructions S: Scheduled A-Equipment Failure (Explain) l hlanual for Preparation of Data B-Maintenance oi Test . 2.Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scrag). Event Report (LER) File lNUREG-D.Regulatory Restriction 4.~t;~~t~t) Continuing 5-Load Reduction OI 6I )

E.Operator Training'icense Examination F-Ad mi nist rat ive 9-Other (Explain) 5 G.Operational Error (Explain) Exhibit I ~

Sante Source H-Other (Explain)

0 h

II"'

Oct. 12, 1981 COMPLETED BY >- T. Chi 1 son TELEPHONE MONTH Se tetttber 1981 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWc-Net 3 (MWe.Net )

768 I7 76(3 IS I9 777 20 776 775 22 779 23 45 IO 26 28 99 I4 30 IS 16 NOTE: Average daily power level greater than 777 NWe due to cooler condenser cooling water.

INSTRUCTIONS On this forn>at.'list the average daily unit power Icvt.'I in MNe-Net for each day in thc reporting tnonth. Contputc to the nearest whole mcgawat t.

(~)/77)

0 I

OPERATING DATA REPORT DOCKET NO.

COMPLETED BY TELEPHONE

~~i OATj Oc~.. DO, 1981

~30 ~-3666 OPERATING STATUS

l. Unit Name: St. Lucie Unit No. 1 Notes Septem er, Unit dpera't:ed at approxi-
2. Reporting Period: mately 100% RP until
3. Licensed Thermal Power (MWt): Sept. 8, 1981.
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

802 822

7. Maximum De p cndable Ca p acit y(Nct hIWe:)
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level Tn Which Restricted. If Any (Net hIWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to.Date Cumulative

11. Hours ln Reporting Period 720.0 6 '551.0 41 8Z9.0

'12. Number Of Hours Reactor Was Critical 172 1 5 883.8 34 309.1

13. Reactor Reserve Shutdown Hours 75.9 75: 9' 205.3
14. Hours Generator On-Line 172.1 882.3 33 513.4
15. Unit Reserve Shutdown Hours 0.0 0.0 39.3
16. Gross Thermal Energy Ge'nerated (MWH) 438 971 14 947 870 82 196 018
17. Gross Electrical Energy Generated (MWH) 140 810 4 881 580 26 691 440
18. Net Electrical Energy Generated (hIWH) 128 871 4 614 030 25 141 516
19. Unit Service Factor 23.9 89. 8 80.0
20. Unit Availability Factor 23.9 89.8 80.1
21. Unit Capacity Factor (Using MDC Net) 23.0 90.6 77.3
22. Unit Capacity Factor (Using DER Net) 22.3 87.8'.7 74.9
23. Unit Forced Outage Rate 30.6 5.1
24. Shutdowns Scheduled Over Next 6 hlonths (Type, Date. and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup: November 15 1981
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved IN ITIAL CRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (1t/771

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UN!T NAME S t. Lucie Unit No. 1 DATE Oct. 12 1981 REPORT MONTH Sept. 1981 c I Liccn sec Cause &, Correct ive Date l/I Event Action to J

Report = Prevent Recurrence 05 81-10-08 75.9 A GENERA Unit trip caused by electric gener-(D) ator protection system due to a fault on "C" phase winding.

Corrective actions included minor insulation repair, (Non-nuclear system) 06 81-10-11 S 472 0 C RC FUELXX Scheduled refueling, maintenance, and inspections.

(Nuclear and non-nuclear systems)

F: Forced Reason: Method: Exhibit G - Instructions S: Schedu!ed A.Equipment Failure (Explain)  ! .Manual for Preparation of Data B.h>>a!ntenance or Test- 2.Manual Scram. Entry Sheets for Licensee C-Refueling 3-Autontatic Scram. Event Report (LER) File (NUREG.

D-Regulatory Restriction 4-Qt>>m(Explain)- Continuing OI 6I )

E-Operator Training &. Liccnsc Exainination 5-Load Reduction F-Administ rat ivc 9-Other (Explain) 5 G.Operational Error (Explain) Exhibit I - Sante Source

('>/77) l>>.Other (Explairr)

~yAlllg~

a FLORIOA POWER II LIGHT COMPANY October 12, 1981 Office of Management Xnformati;on and Program Controls U. S. Nuclear Regulatory. Commission Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 6 4 St. Lucie 'Unit 1 Docket Nos. 50-250, 251, and 335 Attached are the September, 1981, Operating Summary Reports for Turkey Point Units Nos. 3 and' and St. Lucie Unit No. l.

Very truly yours, J.W. Williams, Jr.

Director Nuclear Energy VTC/mbd cc: Mr. -James P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE

SUMMARY

OF OPERATXNG EXPERXENCE DOCKET NO. 50-250 Turkey Point Unit No. 3 DATE October 12, 1981 COMPLETED BY . V.T..Chilson TELEPHONE (305) 552-3666 REPORT MONTH Se tember 1981 Unit No. 3 remained out of service due to Steam Generator Repair Program. Refer to "Unit Shutdowns and Power Reductions" section of September, 1981 Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power a .Light Company commitments for NRUEG-0578 implementation are continuing. Refer.

to correspondence 'between FPL and NRC for additional information.

Steam Generator Repair Program in progress.

Decontamination of Steam .Generator Nos. 3A, 3B, and 3C in progress.

i5 II 4 II II

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 253 Turkey...Paint UNIT Unit No. 4 DATE October 12, 1981 COMPLETED BY TELEPHONE 5 2- 6 REPORT MONTH Se tember 1981 Unit No. 4 operated at approximately 100% R.P. except for outage of October 18-19, 1981. Refer to "Unit Shutdowns and Power Reductions" section'of September, 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included;.

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Florida Power 6 Light Company commitments for NUREG-0578 implementation are continuing; Refer to correspondence between FPL and NRC for additional information.

e 0 ~ .

f

'I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-335 St.'Lucie Unit No. 1 DATE October 12, 1981 COMPLETED BY '.T. Chilson TELEPHONE (305) 552-3666 REPORT MONTH September 1981 r

Unit operated at approximately 100% R.P. until September 8; 1981.

Refer to "Unit Shutdowns and Power Reductions" section of September, 1981, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Florida Power & Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

f Removed reactor vessel closure head, transferred fuel to spent fuel pool, and inspected reactor vessel internals.

'I Inservice Inspection irogress.

/

f P

0 S

j