ML17347A865

From kanterella
Revision as of 23:03, 3 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Sept 1988 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2.W/881017 Ltr
ML17347A865
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 09/30/1988
From: Bonett D, Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-88-453, NUDOCS 8810210559
Download: ML17347A865 (34)


Text

AC CZECH RATED D1.. BUTION DEMONS KTION SYSTEM REGULATORY INFORMATION DISTRJB TION SYSTEM (RIDS)

ACCESSION NBR: 8810210559 DOC.DATE:. 88/

d1 NOTARIZED: NO DOCKET g s FACIL:50-000 Generic Docket 05000000";

50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 050003 89R AUTH. NAME AUTHOR AFFILIATION BONETT,D.M. Florida Power & Light Co.

CONWAY,W.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION D

SUBJECT:

Monthly operating repts for Sept 198 T rkey Points S Units 3 & 4 & St Lucre Units 1 & 2. /8810 ltr..

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL ~ SIZE TITLE: Monthly Operating Report (per Tech Specs)

NOTES D RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 5 5 8 EDISON,G 1 0 TOURIGNY,E 1 0 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 ARM TECH ADV 2 2 NRR/DLPQ/PEB 11 1 1 NRR/DOEA/EAB 11 1 1 NRB/JEEP. B 10 1 1 NUDOCS-ABSTRACT 1 1 E 01 1 1 RGN2 1 1 EXTERNAL I EG&G W LLIAMS g S 1 1 LPDR 2 2 NRC PDR 1 1 NSIC 1 1 R

D s'OZE D

'ZO ALL "RIDS" RECIPIENIS:

S PIZASE HELP US 'ZO M3XJCE WASTE.'XKZKCT %HE DOCXJMEPZ CONTROL DESK, RDCM Pl-37 (EXT., 20079) TO ELIMINATE YOUR NAME FROM DISTRIKKICjm

~ LISTS H)R DOCUMERZS YOU DGN~T NEED~

TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 30:

V;,

II

Ql I~

~ >> V ~

'AGE DAILY UNIT POWER LEVEL GOCKET NO. 50-250 UNIT Turkey Point f3 DATE October 15, 1988 CONPLETED BY D. H. Bonett TELEPHONE 407 694-4432 ANTH Se tember

'DAY AVERAGE DAILY POWER LEVEL (N ~t) 9/ 1/88 665 9/ 2/88 665 9/ 3/88 664 9/ 4/88 661

'9/ 5/88 663

'9/ 6/88 664 9/ 7/88 666.

9/ 8/88 663 9/ 9/88 655 9/10/88 661 9/11/88 667

,9/12/88 674 9/13/88 676 9/14/88 679 9/15/88'/16/88 674 670 9/17/88 670 9/18/88 668 9/19/88 666 9/20/88 666 9/21/88 671 9/22/88 673 9/23/88 673 9/24/88 611 9/25/88 488-9/26/88 668 9/27/88 670 9/28/88 676 9/29/88 677 9/30/88 672 SS 1 0210 R

',r ~

~

i+i

OPERATING 'OAT* REPORT DOCKET NO 50 250 DATE 10/ 7/88 COMPLETED BY D+ Mo BONETT TELEPHONE 305/6'94/4432 OPERATING ST*TUS 1+ UNIT NAME+ TURKEY POINT UNIT 3 2 o REPORTING PERIOD+ SEPTEMBER 1'988 3+ LICENSED THERMAL POHER < MHT ) i 2~00

4. NAMEPLATE RATING (GROSS MME) + 760 5+ DESIGN ELECTRIC*L RATING (NET MME) + 693 be MAXIMUM DEPENDABLE CAPACITY (GROSS MME) e 699 7i 'MAXXMUM DEPENDABLE CAPACITY (NET MME) o 666 8, IF CH*NGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT t GXVE REASONS

'+

POHER LEVEL TO WHICH RESTRICTEDt IF ANY (NET MME) 10'EASONS FOR RESTRICTIONSt XF ANY+

'MONTHLY - YTD- CUMULATIVE 11+ HOURS IN REPORT PERXOD: 720 6575 138704t6

'12+ NUMBER OF HOURS REACTOR WAS CRXTICAL 720+8 5386+4 93362ii 13'EACTOR RESERVE SHUTDOHN HOURS 0.0 e,e 844i4 14 t HOURS GENER*TOR ON-LINE 72eee 5300i9 92136ii 15'NXT RESERVE SHUTDOHN HOURS 0 0 121i8 16+ GROSS THERMAL ENERGY GENERATED (MHH) 1574465 11342555 191146818 17+ GROSS ELECTRICAL ENERGY GENERATED <MWH) 498810 3649755 61247756 18+ NET ELECTRICAL ENERGY GENERATED (MHH-) 475399 3458967 57937753 19+ UNXT SERVXCE FACTOR 100iO 88+6 66+4 20+ UNXT A V*ILABILITYFACTOR 100t0 80+6 66+5 21+ CAPACITY FACTOR (USXNG MDC NET) 99' 79+0 64t1 22+ CAPACITY FACTOR (USING DER NET) 95+3 75' 60i3 23t UNXT FORCED OUTAGE RATE 19 i 4 10i9 24+ SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25 o XF SHUT DOWN ~AT END OF REPORT PERIOD t ESTIM*TED DATE OF START P i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Turkey Point Uni t 83 DATE October 15, 1988 .

COMPLETEDBY D. N. Bonett REPORT MONTH Se tember, 1988 Method of Shutting Ucensee Cause & Corrective Duration Down Event System Component Action to Date Type (Hou'rs) Reason~ Reactor Report¹ Code4 odes PreventRecurrence 09 880924 0.0 HA VALVOP Unit 3 was reduced to approximately 45K power to perform turbine valve testing. The unit was then returned to full power operation.

3 4 F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NUREG%161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Explain) 5 G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)

i+i ll P

r

~ ~ g

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turkey Point P3 DATE October 15, 1988 COMPLETED BY D. M. Bonett TELEPHONE (407) 694-4432 REPORT MONTH Se tember, 1988 See the "Unit'hutdowns and Power Reductions" for Unit g3.

~ ~ P ERAGE DAILY UNIT POWER 'LEVEL DOCKET NQ. 50-251 UNIT Turkey Point II4

'DATE October CONPLETED BY D. H. Bonett TELEPHONE 407 694-4432 NNTH Se tember. 1988 DAY AVERAGE DAILY POWER LEVEL (N Ne-Net) 9/ 1/88 675 9/'/88 677 9/ 3/88 677 9/ 4/88 676 9/ 5/88 246 9/ 6/88 270 9/ 7/88 628 9/,8/88 679 9/ 9/88 682 9/10/88 679 9/11/88 678 9/12/88 679 9/13/88 681 9/14/88 685 9/15/88 680 9/16/88 677 9/17/88 676 9/18/88 676 9/19/88 640 9/20/88 -41

'9/21/88 -12 9/22/88 -7 9/23/88 -6 9/24/88 -6 9/25/88 -1 9/26/88 -1 9/27/88 -1 9/28/88 -1 9/29/88 -1 9/30/88

i+i 'll OF'ERATXHG DATA REF'ORT DOCKET NO 50 251 DATE 10/ 7/88 COMPLETED BY D. Mi BOHETT TELEF'HONE 305/694/4432 OPERATXNG STATUS 1+ UHXT NAME o TURKEY POIHT UHXT 2+ REPORTXNG PERIOD+ SEPTEMBER 1988 3+ LICENSED THERMAL F'OWER ( MWT > + 2200

4. NAMEPLATE RATXNG (GROSS MWE)i 768 5+ DESIGN ELECTRICAL RATING (HET MWE) + 6'93 6+ MAXXMUM DEPENDABLE CAPACITY (GROSS MWE)+ 699
7. M*XIMUM DEPENDABLE CAPACITY (NET MWE): 666 8+ IF CHANGES OCCUR IN CAF'ACITY R*TINGS (ITEMS NUMBER 3 THROUGH 7)

SXHCE LAST REPORTr GIVE REASOHS:

9i POWER LEVEL TO WHICH RESTRXCTEDr IF AHY (HET MWE) 18'EASOHS FOR RESTRXCTXOHSr IF ANY+

MONTHLY - YTD- CUMUL'ATIVE 11+ HOURS XN REF'ORT PERIOD: 728 6575 132436i8 12 i NUMBER OF HOURS REACTOR WAS CRITICAL 456+2 5858' 98236+6

13. RE*CTOR RESERVE SHUTDOWN HOURS 0.0 8i8 166 6 14 i HOURS GENERATOR OH-LINE 45hi8 4988o8 87194oi
15. UNIT RESERVE SHUTDOWN HOURS 0 0 32+1 ibad GROSS THERMAL EHERGY GENERATED (MWH) 942361 10626797 184082420 17+ GROSS ELECTRIC*L ENERGY GENERATED (MWH) 301650 .3449038 58748802 18+ HET ELECTRIC*L ENERGY GENERATED (MWH) 284878 3267739 555S6521 19 UNIT SERVICE FACTOR 63.3 75+9 65<8 20, UNIT A VAILABILXTYFACTOR 63.3 75+9 65+9 21+ CAPACI'I'Y FACTOR (USXNG MDC NET > 59'+ 4 74+6 64 i 4 22'APACITY FACTOR (USXNG DER HET) 57' 71 t7 60.6 23'NIT FORCED OUTAGE RATE 19i7 11+4 24+ SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25, IF SHUT DOWN AT END OF REF'ORT PERIOD ESTIMATED DATE OF STARTUP: 12/31/88

i+i 0 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNITNAME Turke Point Unit 84 DATE October 15 1 COMPLETED By D. H. Bonett REPORT MONTH Se tember 1988 TELEPHONE 40" 694"4432 Method of Shutting Ucensee Cause & Corrective Down Event System Component Actionto Date Type'uration (Hours) Reason~ Reactor Reports Code4 Codes Prevent Recurrence 880905 0.0 251-88-12 RB CONROD Unit 4 experienced an automatic turbine runback to approximately 45K power due to a dropped control rod. The reason for the dropped control rod is still under analysis.

The unit was then returned to full power operation.

880920 264 RC FUELXX Unit 84 was shutdown for refueling and scheduled maintenance.

3 4 F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NUREG4161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)

G - Operational Error (Explain) Exhibit 1-Same Source H - Other (Explain)

igl

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turkey Point ¹4 DATE October 15, 1988 COMPLETED BY D. tl. Bonett TELEPHONE (407) 694-4432 REPORT MONTH Se tember 1988 See the "Unit .Shutdowns and Power Reductions" for Unit ¹4.

ggQE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 UNIT St. Lucie .Pl DATE October 15. 1988 COMPLETED'Y D. -N. Bonett TELEPHONE 407 694-4432 September. 1988

'DAY (N ~t)

AVERAGE DAILY PlNER LEVEL 5'/ 1/88 18 9/ 2/88 -31 9/ 3/88 243 5'l 4/88 516 9/ 5/88 683'63 9/ 6/88 9/ 7/88 206 9/ 8/88 561 9/ 9/88 717 9/io/88 837'70 9/11/88

'9/12/88 867 5'/13/88 863 9/14/88 867 9/15/88 867 9/16/88 867 5'/17/88 865 9/18/88 '864 9/19/88 865 9/20/88 410 9/21/88 65'43 9/22/88 9/23/88 855 9/24'/88 '859 9/25/88 '859 9/26/88 861 9/27/88 859 9/28/88 860 9/25'/88 860 9/30/88 859'

f i+[ i~

OF'ERATING DATA REF'ORT DOCKET HO 50 335 DATE 18/ 7/88 COMPLETED BY Di Ni BOHETT TELEI"HONE 305/694/4432 OPERATING ST*TUB 1+ UNIT NAME i ST. LUCIE UNIT 2, REPORTXHG PERIOD: SEF'TENBER 1988 3+ LXCEHSED THERM*L POWER ( MHT ) + 2700 4i NAMEPLATE RATING (GROSS NWE) + 850 5i DESIGN ELECTRIC*L R*TING (NET MME) + 830 6i NAXXNUN DEPENDABLE CAF'ACITY (GROSS 'MME) + 872 7+ MAXIMUM DEPEND*BLE CAP*CITY (HET MME) .. 839 8+ IF CH*NGES OCCUR IN CAI"ACXTY R*TINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT r GIVE RE*SONS:

9+ POWER 'LEVEL TO WHICH RESTRICTED~ IF AHY (HET MHE) 18 i REASOHS FOR RESTRICTIONS x XF AHY'+

MONTHLY - YTD- CUMULATIVE 1 1+ HOURS IN REPORT PERIOD+ 720 6575 183247+8 12+ HUNBER OF HOURS REACTOR HAS CRITXCAL 787 i'2 5345+3 76889'i6 13'EACTOR .RESERVE SHUTDOHN HOURS Oi8 8'.'0 285+3

14. HOURS GENERATOR 'ON-.LINE 641 i 9 5208i5 76178+3 15',UNIT RESERVE SHUTDOHH HOURS '0 0 39+3 16'ROSS THERM*L 'ENERGY GENERATED (NHH) 1556411: 1377936S 195127038 17 i GROSS ELECTRICAL ENERGY, GENERATED (NHH) 528390 4605960 64129545 18+ NET ELECTRICAL ENERGY GENERATED (MHH) 489615 4359760 68560927 19 i UNIT SERVICE FACTOR 89+2 7'9i 1 73.8

,20. UNIT *V*ILABILITYFACTOR 89o2 79' 73+8 21+ CAF'ACTTY 'FACTOR (USING MDC NET) 81+1 79' 73+1 22'APACITY FACTOR (USING DER NET) Sli9 79' 71+8

.23. UNIT FORCED OUTAGE RATE 9+1 2+2 3' 2'4+ SHUTDOWNS 'SCHEDUL'ED OVER NEXT 6 MOHTHS 25 IF SHUT DOHH AT EHD OF REPORT PERIOD r ESTIMATED DATE,OF STARTUP

<Qi UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

St. Lucie Unit ¹1 ..

UNIT NAME DATE October

0. N. Bonett COMPLETED BY REPORT MONTH September, 1988 ~76 Method of Shutting Ucensee Cause & Corrective Down Event System Component Actionto Date Type'uration (Kours) Reason2 Reactor Report¹ Code4 Codes Prevent Recurrence 05 880901 S 0.0 N/A HA TURB IN While returning to full power from refueling outage, unit was held at 25K for physics test and reduced to 15K power to perform turbine overspee trip test.

06 880901 S 9.7 N/A A TURBIN Performed turbine overspeed trip test s part of power ascension program.

07 880901 F 28.7 N/A A GENERA ollowing the turbine trip test, atched, rolled 5 tripped turbine due o exciter fan coming in contact w/

xciter fan shroud causing damage.

epairs were made 8 unit returned to ower ascension program.

F Forced Reason Method Exhibit G-instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- ManualScram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NUREG4161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit 1-Same Source H - Other (Explain)

if' UNlT SHUTDOWNS AND POWER REDUCTlONS DOCKET NO.

UNIT NAME St. Lupi e Uni t in'1. ~

pATE October 1 5, 1988 COMPLETED By D M Bonett REPORT MONTH Se tember 1988 TELEPHONE Method of Shutting Ucensee Cause &Corrective Down Event System Component Action to No. Date Type'uration (Kours) Reason~ Reactor Reports Code4 Codes PreventRecurrence 08 880902 S 3.9 N/A HA GENERA During power ascension the exciter amplifier drawer blew a fuse. The fuse was replaced & the unit returned to power ascension program.

09 880906 F 8.7 N/A HA TURB IN During power ascension program the unit experienced a problem with intercept valve on turbine. The unit was taken off line to repair in-correctly installed DEH supply line.

10 880920 F 27.1 LER 88-008 HH ZZZZZZ Unit was at full power until the reactor tripped due to steam generato low level while I & C personnel were working on low level controls.

Modifications/repairs were made. Root cause under review. Unit returned to power.

F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File 0 - Regulatory Restriction 4 - Continued (NUREG-0161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit 1-Same Source H - Other(Explain)

~I ~

i+[

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT St.;Lucie ¹1=

DATE October 15, 1988 COMPLETED BY D. M. Bonett TELEPHONE- (407') 694-4432 September, 1988 REPORT MONTH "See Unit shutdown and Power Reduction" In accordance with requirements of Technical Specification 6.9. 1.6, there were no challenges to:PORV or safety valves during the report month.

i+i ERAGE DAILY UNIT PNER LEVEL DOCKET NQ. 50-389 UNIT St. Lucie f2 DATE October 15 1988 CONPLETED BY D. N. Bonett TELEPHONE 432 ggTH September. 1988 DAY AVERAGE DAILY POMER LEVEL (1 Me-Net) 9/ 1/88 848 9/ 2/88 844 9/ 3/88 839 9/ 4'/88 840 9/ 5/88 843 9/ 6/88 849 9/ 7/88 855 9/ '8/88 847 9/ 9/88 843 9/io/88 843 9/11/88 840 9/12/88 805 9/13/88 774 9/14/88 815'11 9/15/88 9/16/88 847 9/17/88'/18/88 840 837'37 9/19/88 9/20/88 834 9/21/88 829 9/22/88 825 9/23/88 825

'9/24/88 '823 9/25/88 784 9/26/88 724 9/27/88 788 9/28/88 837 9/29/88 837 9/30/88 836

~ ~ ~ /

OPERATXNG DAT* REPORT DOCVET NO 50 389 DATE ie/ 7/88 COMPLETED BY Di M+ BONETT TELEPHONE 305/694/4432 OPERATING STATUS li UNXT N*MEi ST+ LUCXE 2 t REPORTXNG PERXODiSEPTEMBER UNIT 2 3t THERMAL POWER (MWT) i 1988'ICENSED 2700 4i NAMEPLATE RATING (GROSS MWE)i 850 5i DESIGN ELECTRICAL R*TXNG (NET MWE) ! . 830 6+ MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)+ 882 7 t MAXXMUM DEPENDABLE CAPACXTY (NET MWE): 839 8+ XF CHANGES OCCUR XN CAPACITY RATINGS (XTEMS NUMBER 3 THROUGH 7)

SXNCE LAST REPORTS GIVE REASONS'OWER 9+ LEVEL TO WHICH RESTRICTED XF ANY (NET MWE)

10. REASONS FOR RESTRICTIONS'F ANY+

MONTHLY -YTD- CUMULATIVE 11 XN REPORT PERIOD 720 6575 45144+0 12 t NUMBER OF HOURS REACTOR WAS CRXTICAL 728+0 6575,0 39333+0 13 t REACTOR RESERVE SHUTDOWN HOURS 0.0 OiO OiO 14'5+

HOURS GENERATOR ON-LINE 720i0 6575+0 38612+6 UNIT RESERVE SHUTDOWN HOURS 0 0 0 24'HOURS 16+ GROSS THERMAL ENERGY GENERATED (MWH) 1922039 17647589 aOee44229 171 GROSS ELECTRXC*L ENERGY GENERATED (MWH) 62819e 5S7S73e 33567390 18i NET ELECTRICAL ENERGY GENERATED (MWH) 595134 5578499 31746287 19+ UNXT SERVICE FACTOR 100+0 180iO 85i5 UNIT A VAXLABILXTYFACTOR 100.0 100+0 85+5 CAPACITY FACTOR (USING MDC NET) 98i5 101+1 86.0 20'1'2'23 CAPACITY FACTOR (USING DER NET) 99i6 182i2 85+8 t UNIT FORCED QUTAGE RATE e 6ii SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS +

REFUELING ~ 2/4/89 25'F SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP'

i il X~ ~

50-389 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

~S.I i Ill I

DATE October 15, 1988'OMPLETED BY REPORT MONTH September 1988 TELEPHONE (407 694-4432-Method of Shutting ucensee Cause & Corrective Duration Down Event System Component Action to No. Date Type (Hours) Reason~ Reactor Report¹ Code4 Codes Prevent Recurrence Unit 82 had no shutdowns or significant power reductions.

F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram EntryScheetsUcensee C - Refueling 3 - Automatic Scram EventReport(LER)File D - Regulatory Restriction 4 - Continued (NUREG%161)

E - Operator Training &Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit 1-Same Source H - Other (Explain)

ii ik

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT St. Lucie k'2 DATE October 15, 1988 COMPLETED BY D. M. Bonett TELEPHONE (407) 694-4432 REPORT MONTH September 1988 Unit 2 operated at essentially full power and had no '"Unit shutdowns or significent power reductions."

In accordance with requirements of Technical Specification 6.9. 1.6, .

there were no challenges to PORY or safety valves during the report month.

('L ~-

~Q~

BOX 14000, JUNO BEACH, FL 3340B.0420

+qggq~

>ltrrAX<

OCTOBER 4 7 )988 L-88-453 10'FR 50.,36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the September 1988 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4, and St. Lucie Units 1 and 2.

Very truly yours, W. F. Conwa Senior Vice President Nuclear WFC/DMB/dmb Attachments cc: Malcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant an FPL Group company

~ ~