ML19142A277
ML19142A277 | |
Person / Time | |
---|---|
Site: | Sequoyah |
Issue date: | 05/21/2019 |
From: | Son Ninh NRC/RGN-II/DRP/RPB5 |
To: | Omar Lopez-Santiago NRC/RGN-II/DRP/RPB5 |
Geanette D | |
References | |
Download: ML19142A277 (9) | |
Similar Documents at Sequoyah | |
---|---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24037A0252024-02-0808 February 2024
[Table view]Pre-Submittal Presentation - 02/08/2024 - Proposed License Amendment Request Change to the Sequoyah Nuclear Plant Technical Specifications 3.8.1 and 3.8.2 ML23345A1662023-12-13013 December 2023 Tennessee Valley Authority - Pre-submittal Meeting for Conversion of Nuclear Quality Assurance Plan from ANSI N45.2-1971 to ASME NQA-1-2015 (EPID L-2023-LRM-0103) - Slides ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML21308A4932021-11-0808 November 2021 Pre-submittal Meeting Presentation - License Amendment Request to Revise Sequoyah Operating License to Use Fire and Seismic PRA Models for 10 CFR 50.69 Risk-Informed Categorizations (EPID L-2021-LRM-0109) (Slides) ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21252A3632021-09-15015 September 2021 Pre-Submittal Meeting for License Amendment Request to Eliminate the High Negative Flux Rate Trip ML21061A0892021-03-0202 March 2021 TVA Presentation Slides for March 2, 2021, Public Meeting to Discuss Sequoyah Alternative Request ML20203M0572020-07-16016 July 2020 Updated TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request ML20196L7922020-07-16016 July 2020 Corrected TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request ML20196L6892020-07-16016 July 2020 TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20163A6952020-06-12012 June 2020 Bpg Presentation on TVA SCWE Final 2 ML20108E9082020-04-16016 April 2020 Presentation Slides for Sequoyah Nuclear Plant, Unit 2 - Exigent License Amendment Request TS 4.2.2, Control Rod Assemblies, Pre-Submittal Conference Call - April 16, 2020 ML20050C8662020-02-20020 February 2020 February 20, 2020 - Pre-Submittal Meeting Presentation - Permanent Operation with Control Rod H8 Removed ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20024D2112020-01-27027 January 2020 Pre-Submittal Meeting for License Amendment Request (LAR) Revised Steam Generator (SG) Inspection Intervals - January 27, 2020 ML19325C7142019-12-0202 December 2019 November 15,2019, Summary of Conference Call with Tennessee Valley Authority to Discuss Submittal of Exigent License Request (EPID L-2019-LLA-0239) for Sequoyah Nuclear Plant, Unit 1 ML19323D8882019-11-15015 November 2019 TVA Pre-submittal Presentation Slides - Exigent Amendment ML19161A2392019-06-10010 June 2019 Plants Pre-Submittal Meeting for Proposed License Amendments Hydrological Analysis Updates June 10, 2019 ML19142A2772019-05-21021 May 2019 Summary of Public Meeting - Sequoyah Nuclear Plant ML18312A3502018-11-14014 November 2018 Meeting to Discuss Proposed Technical Specification Changes Needed of Associated with the Use of Westinghouse Robust Fuel Assemblies at Sequoyah Nuclear Plant Units 1 & 2 - November 14, 2018 ML18164A3092018-06-13013 June 2018 June 6, 2018 Summary of Public Meeting - Sequoyah Nuclear Plant - Docket Nos. 50-327 and 50-328 ML17342A3642017-12-0808 December 2017 Enclosure 2, Handouts and Presentations Discussed During the November 16, 2017 ROP Working Group Public Meeting NEI 09-07, Enclosure 2, Handouts and Presentations Discussed During the November 16, 2017 ROP Working Group Public Meeting2017-12-0808 December 2017 Enclosure 2, Handouts and Presentations Discussed During the November 16, 2017 ROP Working Group Public Meeting ML17271A0162017-09-28028 September 2017 Meeting Slide for Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Review Status ML17212A8432017-08-0101 August 2017 Meeting Slides for Pre-submittal Meeting with Tennessee Valley Authority on Unbalanced Voltage License Amendment Request for TVA Nuclear Plants ML17053A0232017-02-22022 February 2017 Slides for Meeting with Tennessee Valley Authority to Discuss HEC-RAS Flood Model Project: Seismic Dam Failure Methodology ML16102A3302016-04-0404 April 2016 Presentation Slides for 04042016 Public Meeting on Resolution of TVA Flood Model Issue ML14259A1662014-09-17017 September 2014 Meeting Slides for the September 17, 2014 Public Meeting to Discuss the Dseis for License Renewal of Sequoyah Units 1 and 2 ML14262A3302014-09-16016 September 2014 9/16/2014 Meeting Slide for Sequoyah Nuclear Plant, Units 1 and 2 Regarding AST Presentation ML14107A3352014-04-16016 April 2014 Summary of Meeting with Tennessee Valley Authority to Discuss Nrc'S Reactor Oversight Process (ROP) and Nrc'S Annual Assessment of Plant Safety Performance for Period of January 1, 2013, to December 31, 2013 for Sequoyah Bar Nuclear Plant ML14101A1522014-04-11011 April 2014 Summary of Public and Closed Meeting for Tennessee Valley Authority 2013 Synergy Safety Culture Survey Results ML14090A4582014-03-31031 March 2014 Public Meeting Summary TVA Synergy Safety Culture Survey Results ML14071A1522014-03-13013 March 2014 Slide, ITS Project Electrical Systems Presentation March 13, 2014 ML14049A3372014-02-18018 February 2014 2/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, and 50-328 ML13361A0212013-12-27027 December 2013 License Renewal IP71002 Exit Meeting Slides and Notes from December 17, 2013 ML13210A4042013-07-30030 July 2013 Meeting Slide for 7/30-31/2013 Meeting Re. Hydrology License Amendment Requests ML13189A1352013-07-0101 July 2013 Progress Update on Improved Flood Mitigation System Project ML13182A0872013-06-27027 June 2013 Plants - 1st Quarterly Update for NTTF Recommendation 2.1, Flooding Hazard Reevaluation Report (Hrr) Extension Request ML13182A0662013-06-27027 June 2013 Plants - 1st Quarterly Update for the Improved Flood Mitigation System ML13156A0462013-06-0404 June 2013 NRC Pre-Submittal Meeting, Improved Technical Specification Conversion ML13120A1322013-04-29029 April 2013 Plants, Units 1 and 2 - NTTF Recommendation 2.1, Flooding Hazard Reevaluation Report Extension Request ML12352A2082012-12-17017 December 2012 December 3, 2012 Summary of Public Meeting Flood Mode Operation Improvement Strategy for Watts Bar and Sequoyah ML12215A4252012-09-0505 September 2012 Meeting Slides with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Units 1 and 2 Multiple Circuit Failure Modifications Appendix R (Fire Protection) ML12214A1992012-07-16016 July 2012 7/16/12 Slides of Public Meeting with TVA Regarding the Use of the Unit Station Service Transformers as a Power Supply to an Offsite Circuit for Sequoyah Nuclear Plant ML12156A0762012-05-31031 May 2012 TVA Slides for Nrc/Tva Public Meeting on May 31, 2012 ML12128A0632012-05-0303 May 2012 EOC Meeting Summary 2024-02-08 Category:Meeting Summary MONTHYEARML24008A1592024-01-18018 January 2024
[Table view]Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23304A0682023-11-0606 November 2023 Summary of October 24, 2023, Public Mtg W/Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, and Sequoyah Nuclear Plant, Units 1 and 2 to Revise Function 5, Turbine Trip and F ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML22312A3522022-12-0101 December 2022 Revised - Summary of Regulatory Audit for Alternative Request RV-02 ML22207B8302022-07-28028 July 2022 Summary of July 20, 2022, Observation Public Meeting with the Tennessee Valley Authority to Discuss Planned Alternative Request RP-12 to ASME OM Code Testing for the 1B-B Centrifugal Charging Pump at Sequoyah Nuclear Plant, Unit 1 ML22168A1642022-06-27027 June 2022 Summary of June 9, 2022, Meeting with TVA Regarding a Proposed License Amendment Request Related to Low Temperature Overpressure System and Cold Overpressure Mitigation System for Sequoyah and Watts Bar Nuclear Plants ML22109A0042022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Alternative Request Related to Testing of the Motor-Driven Auxiliary Feedwater Pumps at Sequoyah and Watts Bar Nuclear Plants ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22048B7852022-03-0202 March 2022 Summary of February 16, 2022, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a Request for an Alternative to Requirements for Addressing Pressure Isolation Valve Leakage ML21313A3482021-11-18018 November 2021 Summary of Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a License Amendment Request Regarding Seismic and Fire Probabilistic Risk Assessment (PRA) Modifications to 10 CFR 50.69 ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21265A5142021-10-12012 October 2021 Summary of September 15, 2021, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a License Amendment Request Regarding Elimination of the High Negative Flux Rate Trip ML21218A1472021-08-11011 August 2021 August 5, 2021 N-769 Relief Pre-Submittal Meeting Summary ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21152A1252021-06-0202 June 2021 Summary of Verbal Authorization of Alternative Request RP-10 for the 1B-B Motor Driven Auxiliary Feedwater Pump ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21112A3262021-04-30030 April 2021 Summary of April 21, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2 ML21067A2132021-03-23023 March 2021 Summary of March 2, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned Alternative Request ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20293A0802020-10-28028 October 2020 Summary of October 13, 2020, Closed Meeting with TVA on Responses to Requests for Additional Information Updated Final Safety Analysis Report Hydrologic Analysis License Amendment Request ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20203M2292020-08-11011 August 2020 July 16, 2020, Summary of Partially Closed Meeting with Tennessee Valley Authority to Discuss Responses to Requests for Additional Information Regarding Updated Final Safety Analysis Report Hydrologic Analysis License Amendment Request ML20197A2722020-07-15015 July 2020 2020 Beaver Valley, Calvert Cliffs, Limerick Peach Bottom, Susquehanna Annual Assessment Webinar Summary ML20108E9092020-06-22022 June 2020 Summary of April 16, 2020, Virtual Meeting with Tennessee Valley Authority to Discuss Submittal of an Exigent License Amendment Request Operate One Cycle with One Control Rod Removed ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20055C2312020-03-0505 March 2020 Summary of February 20, 2020 Pre-submittal Meeting - Operation Without Control Rod H8 and Fuel Transition ML20035C8192020-02-12012 February 2020 Summary of January 27, 2020, Public Meeting with Tennessee Valley Authority Regarding the Future Submittal of Steam Generator Tube Inspection Related License Amendment Request ML19325C7142019-12-0202 December 2019 November 15,2019, Summary of Conference Call with Tennessee Valley Authority to Discuss Submittal of Exigent License Request (EPID L-2019-LLA-0239) for Sequoyah Nuclear Plant, Unit 1 ML19142A2772019-05-21021 May 2019 Summary of Public Meeting - Sequoyah Nuclear Plant ML19038A4692019-02-28028 February 2019 Summary of January 31, 2019 Meeting with Tennessee Valley Authority Regarding Presubmittal Licensing Actions - ML18344A5672019-01-15015 January 2019 November 14, 2018, Summary of Public Meeting with Tennessee Valley Authority Regarding Presubmittal Licensing Actions - Sequoyah Nuclear Plant, Units 1 and 2 ML18164A3092018-06-13013 June 2018 June 6, 2018 Summary of Public Meeting - Sequoyah Nuclear Plant - Docket Nos. 50-327 and 50-328 ML17278A8972017-10-17017 October 2017 Summary of Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry, Units 1, 2, and 3, Sequoyah Nuclear, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2(EPID L2016-TOP-0011; CAC Nos. MF8391-MF8397 ML17227A5142017-09-0101 September 2017 Summary of August 1, 2017, Pre-Submittal Public Meeting with TVA Regarding a Class 1E Unbalanced Voltage Relay Licensing Amendment Request for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant ML16280A2912016-10-31031 October 2016 September 23, 2016, Summary of Public Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Nuclear Plant, Units 1 & 2 (CAC Nos. MF83 ML16117A5512016-05-0202 May 2016 04/01/2016 Sequoyah Nuclear Plant, Units 1 and 2 - Summary Of Public Meeting With TVA Regarding Hydrology-Related Licensing Actions (CAC Nos. ME9238 And ME9239) ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML16029A3512016-02-0505 February 2016 Summary of January 19, 2016, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Technical Specifications for Sequoyah Nuclear Plant, Units 1 and 2 ML15238A3422015-09-22022 September 2015 July 22, 2015 Summary of Telecon Between NRC and TVA, Concerning RAI Set 25 Pertaining to SQN, Units 1 and 2 License Renewal Application ML15233A0352015-09-22022 September 2015 July 20, 2015, Summary of Telephone Conference Call Held Between NRC and TVA Concerning RAI, Set 25 Pertaining to the Sequoyah Units 1 and 2 License Renewal Application (TAC Nos. MF0481 and MF0482) ML15236A0672015-09-0909 September 2015 August 20, 2015 Summary of Telephone Conference Call Held Between the U.S. NRC and TVA ML15152A0312015-06-23023 June 2015 Summary of Telephone Conference Call Held on May 13, 2015, Between the U.S. NRC and TVA, Concerning RAI, Set 24 Pertaining to the Sequoyah Nuclear Plant License Renewal Application ML15106A5462015-04-15015 April 2015 Meeting Summary with Public to Discuss Annual Assessment of Sequoyah Nuclear Plant, Unit 1 & 2, in Soddy Daisy, Tn ML15037A1732015-02-13013 February 2015 Summary of January 15, 2015, Meeting with Tennessee Valley Authority Regarding Improved Technical Specifications Conversion for Sequoyah Nuclear Plant, Units 1 and 2 ML14204A2672014-08-15015 August 2014 Summary of July 10, 2014, Meeting Between the Tennessee Valley Authority and the Nuclear Regulatory Commission to Discuss Near-Term Task Force Recommendation 2.1 Flooding Hazard Reevaluation Report and Improved Mitigation System Quarterly U ML14197A6082014-08-0606 August 2014 July 1, 2014, Summary of Category 1 Public Meeting with Tennessee Valley Authority to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14174A7372014-07-30030 July 2014 June 19, 2014, Summary of Telephone Conference Call Held Between NRC and Tennessee Valley Authority, Concerning Requests for Additional Information Pertaining to the Sequoyah, Units 1 & 2, License Renewal Application ML14107A3352014-04-16016 April 2014 Summary of Meeting with Tennessee Valley Authority to Discuss Nrc'S Reactor Oversight Process (ROP) and Nrc'S Annual Assessment of Plant Safety Performance for Period of January 1, 2013, to December 31, 2013 for Sequoyah Bar Nuclear Plant ML14090A4582014-03-31031 March 2014 Public Meeting Summary TVA Synergy Safety Culture Survey Results ML14049A3372014-02-18018 February 2014 2/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, and 50-328 2024-01-18 Category:Memoranda MONTHYEARML23142A2132023-05-22022 May 2023
[Table view]Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML23121A0772023-05-11011 May 2023 Transmittal of Final Accident Sequence Precursor Report Regarding Centrifugal Charging Pump 1B-B ML21246A2812021-09-29029 September 2021 Memo to File ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML20164A1442020-06-0303 June 2020 Memorandum from David Lochbaum 2.206 Petition - Review of TVA Employee Concerns Program ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML19142A2772019-05-21021 May 2019 Summary of Public Meeting - Sequoyah Nuclear Plant ML18164A3092018-06-13013 June 2018 June 6, 2018 Summary of Public Meeting - Sequoyah Nuclear Plant - Docket Nos. 50-327 and 50-328 ML18024A0252018-01-24024 January 2018 Approval for Credit for the Sequoyah Operational Safety Review Team to the Baseline Inspection Samples/Hours ML17108A2952017-04-17017 April 2017 Public Meeting Summary - Sequoyah Nuclear Plant ML16131A6202016-05-12012 May 2016 Summary of Public Meeting - Sequoyah, Units 1 and 2 to Provide Opportunities to Discuss the Annual Assessment ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML15092A8092015-09-21021 September 2015 Renewal of Full Power Operating License for the Sequoyah Nuclear Plant, Units 1 and 2 ML15103A5852015-08-14014 August 2015 SQN Continued Storage Note to File - OGC Comments ML15107A1042015-04-17017 April 2015 4/20/2015 Notice of Forthcoming Closed Meeting with Tennessee Valley Authority (TVA) on Sequoyah Nuclear Plant Planned Submittal of Relief Request Regarding Flaws in the Reactor Closure Vessel Head Nozzles ML15106A5462015-04-15015 April 2015 Meeting Summary with Public to Discuss Annual Assessment of Sequoyah Nuclear Plant, Unit 1 & 2, in Soddy Daisy, Tn ML15079A0922015-03-19019 March 2015 Memo 3/19/3015: Sequoyah Nuclear Plant Units 1 and 2 License Renwal Application ML15037A7192015-02-0606 February 2015 Minutes of the ACRS Plant License Renewal Subcommittee Meeting - November 5, 2014 ML14281A5842014-10-24024 October 2014 Federal Register Notice Regarding the ACRS Plant License Renewal (Sequoyah), November 5, 2014 ML14197A6082014-08-0606 August 2014 July 1, 2014, Summary of Category 1 Public Meeting with Tennessee Valley Authority to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML13239A0772013-10-0707 October 2013 8/13/13 - Summary of Meeting Between the Nuclear Regulatory Commission & Tennessee Valley Authority for Clarification of Cultural Resource Request for Additional Information Related to the Sequoyah Nuclear Plant License Renewal Environmenta ML13247A4272013-09-23023 September 2013 Summary of Telephone Conference Call Held on August 19, 2013, Between the NRC and Tennessee Valley Authority, Concerning RAI Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, LRA ML13255A3682013-09-0606 September 2013 Written Limited Appearance Statements ML13231A2202013-08-15015 August 2013 Memorandum from the Atomic Safety and Licensing Board Dated August 15, 2013, Forwarding Written Limited Appearance Statements from Various Individuals ML13225A2152013-08-0606 August 2013 Memorandum from the Atomic Safety and Licensing Board Forwarding Written Limited Appearance Statements from Beverly Kerr Dated July 23, 2013 and Stewart Horn Dated August 2, 2013 ML13171A0362013-08-0101 August 2013 Summary of Telephone Conference Call Held on June 13, 2013, Between the NRC and Tennessee Valley Authority, Concerning RAI Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, LRA ML13126A2522013-07-25025 July 2013 Request for Additional Information on the 2013 Decommissioning Funding Status Report ML13105A3942013-04-16016 April 2013 Location Change - Notice of Forthcoming Meeting for Public Meeting with Tennessee Valley Authority (TVA) on 2.1 Response Extension Request, Sequoyah Nuclear Plant and Watts Bar Nuclear Plant ML13102A2522013-04-16016 April 2013 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) Regarding Sequoyah Nuclear Plant, Units 1 and 2 Conversion to Improved Technical Specifications (ITS) ML13067A3312013-03-20020 March 2013 03/03/2013 Notice of Meeting to Discuss the License Renewal Process and Environmental Scoping for Tennessee Valley Authority, Sequoyah Nuclear Plant, Units 1 and 2 ML13078A4212013-03-19019 March 2013 Public Meeting Notice Tennessee Valley Authority, Browns Ferry, Sequoyah, Watts Bar for Commercial Grade Dedication Program ML12215A4212012-10-10010 October 2012 9/5/12 Meeting Summary for Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Units 1 and 2 Appendix R (Fire Protection) ML12234A7582012-08-22022 August 2012 Notice of Forthcoming Meeting with Tennessee Valley Authority (Tva), Regarding Sequoyah Nuclear Plant, Units 1 and 2 Appendix R (Fire Protection) ML12215A4202012-08-0909 August 2012 8/23/12 Forthcoming Notice of Meeting with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Units 1 and 2, Appendix R (Fire Protection) IR 05000390/20100082012-07-0606 July 2012 Errata for Electronic Closure of Watts Bar Inspection Report 05000390/2010-008 Memo Dated July 21, 2011 (ML 112020591) ML12178A4742012-06-28028 June 2012 Notice of Forthcoming Meeting with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Units 1 and 2 Unit Station Service Transformers Amendment Request(Tac Nos. ME8772 & ME8773) ML1120205912011-07-21021 July 2011 IR 05000327-10-008, 05000328-10-008 for Electronic Closure of Sequoyah, and IR 05000390-10-008 for Watts Bar IR 05000327/20100082011-07-21021 July 2011 IR 05000327-10-008, 05000328-10-008 for Electronic Closure of Sequoyah, and IR 05000390-10-008 for Watts Bar ML1119507132011-07-15015 July 2011 the Nuclear Regulatory Commission Staff Spot-Check Review of Tennessee Valley Authority'S One Hundred Percent Ownership Interest of Sequoyah Nuclear Plant, Unit 2, on July 7, 2011 - Finding of No Potential Issues ML1119507002011-07-15015 July 2011 the Nuclear Regulatory Commission Staff Spot-Check Review of Tennessee Valley Authority'S One Hundred Percent Ownership Interest of Sequoyah Nuclear Plant, Unit 1, on July 7, 2011 - Finding of No Potential Issues ML1107000312011-04-15015 April 2011 Notice of Meeting with Tennessee Valley Authority to Discuss Responses to NRC Requests for Additional Information for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accident at Pre ML1100600842011-01-0707 January 2011 Notice of Meeting with Tennessee Valley Authority to Discuss the Steam Generator Replacement During the Fall 2012 Refueling Outage for Sequoyah Nuclear Plant, Unit 2 ML1031600802010-11-12012 November 2010 Notice of Forthcoming Conference Call with Tennessee Valley Authority ML1029901502010-10-26026 October 2010 Cancelled - Notice of Meeting with (Tva), to Discuss Responses to the NRC Requests for Additional Information (Rals) for Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis. ML1027404372010-10-12012 October 2010 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss Responses to the NRC Requests for Additional Information (Rais) for General Letter 2004-02 ML1024402482010-09-0101 September 2010 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss the Fuel Transition from Existing AREVA-MARK Bw Fuel to New AREVA-High Thermal Performance Fuel for Sequoyah Nuclear Plant, Units 1 and 2 ML1016203602010-06-17017 June 2010 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss the Complete Status of TVA Hydrology Issues Including the Flooding Effects on the TVA Operating Nuclear Plants ML1010407332010-05-0707 May 2010 Notice of Conference Call with Tennessee Valley Authority for Sequoyah, Units 1 and 2, Watts Bar, Unit 1 to Discuss Responses to NRC Requests for Additional Information for Generic Letter 2004-02 ML1000800082010-01-11011 January 2010 Notice of Forthcoming Conference Call with Tennessee Valley Authority Sequoyah Nuclear Plant, Units 1 & 2; Watts Bar Unit 1 2023-05-22 Category:Slides and Viewgraphs MONTHYEARML24037A0252024-02-0808 February 2024
[Table view]Pre-Submittal Presentation - 02/08/2024 - Proposed License Amendment Request Change to the Sequoyah Nuclear Plant Technical Specifications 3.8.1 and 3.8.2 ML23345A1662023-12-13013 December 2023 Tennessee Valley Authority - Pre-submittal Meeting for Conversion of Nuclear Quality Assurance Plan from ANSI N45.2-1971 to ASME NQA-1-2015 (EPID L-2023-LRM-0103) - Slides ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML22201A1262022-07-20020 July 2022 July 20, 2022 - Pre-submittal Meeting for Inservice Testing (IST) Program Request for Alternative for the Centrifugal Charging Pump 1B-B Testing Per ISTB-3310 (RP-12) ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22103A0852022-04-14014 April 2022 and Watts Bar Plant Pre-submittal Meeting for Inservice Testing (IST) Program Request for Alternative for the Motor Driven Auxiliary Feedwater Pump Testing Following Maintenance During an Outage Per ISTB-3310 ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML22046A2932022-02-15015 February 2022 Pre-submittal Meeting Presentation - Request for Alternative to ASME OM Code ISTC-3630 Regarding Leakage of Pressure Isolation Valves ML21308A4932021-11-0808 November 2021 Pre-submittal Meeting Presentation - License Amendment Request to Revise Sequoyah Operating License to Use Fire and Seismic PRA Models for 10 CFR 50.69 Risk-Informed Categorizations (EPID L-2021-LRM-0109) (Slides) ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21252A3632021-09-15015 September 2021 Pre-Submittal Meeting for License Amendment Request to Eliminate the High Negative Flux Rate Trip ML21197A0022021-08-0505 August 2021 N-769-6 Relief Pre-Submittal TVA Presentation August 2021 ML21111A0202021-04-21021 April 2021 TVA Slides for April 21, 2021 Public Meeting to Discuss Planned Sequoyah Amendment Request ML21096A1002021-04-0606 April 2021 Annual Assessments ML21061A0892021-03-0202 March 2021 TVA Presentation Slides for March 2, 2021, Public Meeting to Discuss Sequoyah Alternative Request ML20196L7922020-07-16016 July 2020 Corrected TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request ML20203M0572020-07-16016 July 2020 Updated TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request ML20196L6892020-07-16016 July 2020 TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20163A6952020-06-12012 June 2020 Bpg Presentation on TVA SCWE Final 2 ML20112F5302020-04-21021 April 2020 TVA Nuclear Plants -2019 EOC Media Loop Slides for Automatic Play (Final) ML20108E9082020-04-16016 April 2020 Presentation Slides for Sequoyah Nuclear Plant, Unit 2 - Exigent License Amendment Request TS 4.2.2, Control Rod Assemblies, Pre-Submittal Conference Call - April 16, 2020 ML20050C8662020-02-20020 February 2020 February 20, 2020 - Pre-Submittal Meeting Presentation - Permanent Operation with Control Rod H8 Removed ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20024D2112020-01-27027 January 2020 Pre-Submittal Meeting for License Amendment Request (LAR) Revised Steam Generator (SG) Inspection Intervals - January 27, 2020 ML19325C7142019-12-0202 December 2019 November 15,2019, Summary of Conference Call with Tennessee Valley Authority to Discuss Submittal of Exigent License Request (EPID L-2019-LLA-0239) for Sequoyah Nuclear Plant, Unit 1 ML19323D8882019-11-15015 November 2019 TVA Pre-submittal Presentation Slides - Exigent Amendment ML19161A2392019-06-10010 June 2019 Plants Pre-Submittal Meeting for Proposed License Amendments Hydrological Analysis Updates June 10, 2019 ML19164A2032019-05-30030 May 2019 OEDO-19-00288-TVA Sequoyah Leadership Forum Power Point ML19142A2772019-05-21021 May 2019 Summary of Public Meeting - Sequoyah Nuclear Plant ML18312A3502018-11-14014 November 2018 Meeting to Discuss Proposed Technical Specification Changes Needed of Associated with the Use of Westinghouse Robust Fuel Assemblies at Sequoyah Nuclear Plant Units 1 & 2 - November 14, 2018 ML18164A3092018-06-13013 June 2018 June 6, 2018 Summary of Public Meeting - Sequoyah Nuclear Plant - Docket Nos. 50-327 and 50-328 ML17271A0162017-09-28028 September 2017 Meeting Slide for Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Review Status ML17212A8432017-08-0101 August 2017 Meeting Slides for Pre-submittal Meeting with Tennessee Valley Authority on Unbalanced Voltage License Amendment Request for TVA Nuclear Plants ML17053A0232017-02-22022 February 2017 Slides for Meeting with Tennessee Valley Authority to Discuss HEC-RAS Flood Model Project: Seismic Dam Failure Methodology ML16102A3302016-04-0404 April 2016 Presentation Slides for 04042016 Public Meeting on Resolution of TVA Flood Model Issue ML14259A1662014-09-17017 September 2014 Meeting Slides for the September 17, 2014 Public Meeting to Discuss the Dseis for License Renewal of Sequoyah Units 1 and 2 ML14262A3302014-09-16016 September 2014 9/16/2014 Meeting Slide for Sequoyah Nuclear Plant, Units 1 and 2 Regarding AST Presentation ML14101A1522014-04-11011 April 2014 Summary of Public and Closed Meeting for Tennessee Valley Authority 2013 Synergy Safety Culture Survey Results ML14071A1522014-03-13013 March 2014 Slide, ITS Project Electrical Systems Presentation March 13, 2014 ML14049A3372014-02-18018 February 2014 2/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, and 50-328 ML13361A0212013-12-27027 December 2013 License Renewal IP71002 Exit Meeting Slides and Notes from December 17, 2013 ML13210A4042013-07-30030 July 2013 Meeting Slide for 7/30-31/2013 Meeting Re. Hydrology License Amendment Requests ML13189A1352013-07-0101 July 2013 Progress Update on Improved Flood Mitigation System Project ML13156A0462013-06-0404 June 2013 NRC Pre-Submittal Meeting, Improved Technical Specification Conversion ML13120A1322013-04-29029 April 2013 Plants, Units 1 and 2 - NTTF Recommendation 2.1, Flooding Hazard Reevaluation Report Extension Request ML13115A0202013-04-23023 April 2013 Public Meeting Summary - Regulatory Conference / Enforcement Conference Sequoyah Nuclear Plant ML12352A2082012-12-17017 December 2012 December 3, 2012 Summary of Public Meeting Flood Mode Operation Improvement Strategy for Watts Bar and Sequoyah ML12215A4252012-09-0505 September 2012 Meeting Slides with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Units 1 and 2 Multiple Circuit Failure Modifications Appendix R (Fire Protection) 2024-02-08 |
Contents
Text
May 21, 2019 MEMORANDUM TO: Omar R. Lopez-Santiago, Branch Chief Reactor Projects Branch 5 Division of Reactor Projects FROM: Son Ninh /RA/
Senior Project Engineer Reactor Projects Branch 5
SUBJECT:
PUBLIC MEETING
SUMMARY
- SEQUOYAH NUCLEAR PLANT- DOCKET NOS. 50-327 AND 328 On May 8, 2019, the Nuclear Regulatory Commission staff met with members of the public concerning the annual assessment of Sequoyah Nuclear Plant, Units 1 and 2. The meeting was held at the Sequoyah Training Center in Soddy Daisy, TN. The purpose of the meeting/open house session was to provide opportunities to discuss the annual assessment of the Sequoyah Nuclear Plant with the public for the period of January 1, 2018 - December 31, 2018. Enclosure 1 is a list of attendees and Enclosure 2 is the NRCs annual assessment presentation slides.
Docket Nos.: 50-327 and 328 License No.: DPR-77 and DRP-79
Enclosures:
- 1. List of Attendees
- 2. NRCs Annual Assessment Presentation Slides CONTACT: Son Ninh, RII/DRP 404-997-4532
ML19142A277 OFFICE RII/DRP NAME SNinh DATE 5/21/2019 2
3 4
5 6