MONTHYEARML24089A0712024-04-0101 April 2024 3/20/24 & 3/27/24 2023 TVA Public Annual Assessment Meeting Summary ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML23121A0772023-05-11011 May 2023 Transmittal of Final Accident Sequence Precursor Report Regarding Centrifugal Charging Pump 1B-B ML21246A2812021-09-29029 September 2021 Memo to File ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21060A9122021-03-17017 March 2021 Memo to File: Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Watts Bar ISFSI ML20164A1442020-06-0303 June 2020 Memorandum from David Lochbaum 2.206 Petition - Review of TVA Employee Concerns Program ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML19142A3602019-05-21021 May 2019 May 9, 2019 Summary of Public Meeting; Watts Bar Nuclear Plant ML19142A2772019-05-21021 May 2019 Summary of Public Meeting - Sequoyah Nuclear Plant ML18227A5992018-08-23023 August 2018 Request to Use a Later Edition of the Asme Boiler and Pressure Vessel Code, Section XI for Containment Inservice Inspection Activities ML18165A3962018-06-14014 June 2018 Summary of Public Meeting Concerning Annual Assessment of Watts Bar Nuclear Plant - Docket Nos. 50-390 and 391 ML18164A3092018-06-13013 June 2018 June 6, 2018 Summary of Public Meeting - Sequoyah Nuclear Plant - Docket Nos. 50-327 and 50-328 ML18024A0252018-01-24024 January 2018 Approval for Credit for the Sequoyah Operational Safety Review Team to the Baseline Inspection Samples/Hours ML17356A2692017-12-20020 December 2017 Construction Lessons Learned Report ML17332A2012017-11-28028 November 2017 Approval for Exceedance of the Watts Bar Maximum Baseline Inspection Samples ML17192A0312017-06-26026 June 2017 Construction Inspection and Oversight Lessons Learned ML17151A5092017-05-31031 May 2017 Public Meeting Summary - 2016 Annual Assessment Public Meeting Regarding Watts Bar Nuclear Plant ML17108A2952017-04-17017 April 2017 Public Meeting Summary - Sequoyah Nuclear Plant ML16252A2042016-09-0909 September 2016 Memo Ico Staff Review of Watts Bar Nuclear Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, Revision 20 (Ns113989) for Verification of ASM Order EA-14-044 Implementation (Cac# L25130) ML16194A2522016-07-12012 July 2016 Memorandum to T. Mossman Technical Assistance Request-Review of Physical Security Plan for the Watts Bar Nuclear Plant Independent Spent Fuel Storage Installation (CAC No. L25130) ML16131A6202016-05-12012 May 2016 Summary of Public Meeting - Sequoyah, Units 1 and 2 to Provide Opportunities to Discuss the Annual Assessment ML16131A6172016-05-10010 May 2016 Summary of Public Meeting with Watts Bar, Units 1 and 2, to Discuss the Annual Assessment ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML15259A4172015-10-21021 October 2015 the U.S. Nuclear Regulatory Commission Staff Evaluation of the Final Rule for Continued Storage of Spent Nuclear Fuel for the Operating License Environmental Review for Watts Bar Nuclear Plant, Unit 2 ML15288A3052015-10-15015 October 2015 Readiness of Watts Bar Unit 2 to Receive an Operating License ML15092A8092015-09-21021 September 2015 Renewal of Full Power Operating License for the Sequoyah Nuclear Plant, Units 1 and 2 ML15103A5852015-08-14014 August 2015 SQN Continued Storage Note to File - OGC Comments ML15096A2042015-04-23023 April 2015 Reactor Oversight Process Transition Plan for Watts Bar Nuclear Plant, Unit 2 ML15107A1042015-04-17017 April 2015 4/20/2015 Notice of Forthcoming Closed Meeting with Tennessee Valley Authority (TVA) on Sequoyah Nuclear Plant Planned Submittal of Relief Request Regarding Flaws in the Reactor Closure Vessel Head Nozzles ML15106A5462015-04-15015 April 2015 Meeting Summary with Public to Discuss Annual Assessment of Sequoyah Nuclear Plant, Unit 1 & 2, in Soddy Daisy, Tn ML15104A2982015-04-10010 April 2015 March 26, 2015, Summary of Public Meeting with Watts Bar, Unit 2, Senior Management ML15104A2392015-04-10010 April 2015 March 26, 2015, Summary of Public Meeting with Watts Bar, Unit 2, EOC Assessment ML15084A4242015-03-25025 March 2015 March 17, 2015, Summary of Public Meeting with Watts Bar, Unit 1, Concerning Annual Assessment ML15079A0922015-03-19019 March 2015 Memo 3/19/3015: Sequoyah Nuclear Plant Units 1 and 2 License Renwal Application ML15037A7192015-02-0606 February 2015 Minutes of the ACRS Plant License Renewal Subcommittee Meeting - November 5, 2014 ML15015A4772015-02-0202 February 2015 Environmental Protection Plan (Non-Radiological) Technical Specification Review ML14281A5842014-10-24024 October 2014 Federal Register Notice Regarding the ACRS Plant License Renewal (Sequoyah), November 5, 2014 ML14247A4522014-08-28028 August 2014 FEMA Response to NRC for Watts Bar Nuclear Site ML14234A1462014-08-20020 August 2014 Memo to D. Safer Re M141030: Welcome Package for D.Safer for the Briefing on Watts Bar Unit 2 License Application Review ML14231B0102014-08-19019 August 2014 Summary of the Public Meeting to Discuss Aspects of Tva'S Response to 2009 Confirmatory Order, August 18, 2014 ML14197A6082014-08-0606 August 2014 July 1, 2014, Summary of Category 1 Public Meeting with Tennessee Valley Authority to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14364A1682014-06-0202 June 2014 Flowserve Corp., Vermont, Formal Evaluation of Deviations Reported - Notification of Defect - Watts Bar II ML14015A4522014-01-16016 January 2014 Notice of Meeting with Tennessee Valley Authority Regarding Open Items for Watts Bar Unit 2 ML14014A3262014-01-16016 January 2014 Notice of Forthcoming Meeting with Tennessee Valley Authority Regarding Watts Bar Nuclear Plant (WBN) Unit 1 Fire Protection Amendment Request ML13352A4332013-12-19019 December 2013 Notice of Meeting with Tennessee Valley Authority Regarding Status of Construction and Licensing of Watts Bar Nuclear Plant, Unit 2 ML13239A0772013-10-0707 October 2013 8/13/13 - Summary of Meeting Between the Nuclear Regulatory Commission & Tennessee Valley Authority for Clarification of Cultural Resource Request for Additional Information Related to the Sequoyah Nuclear Plant License Renewal Environmenta ML13247A4272013-09-23023 September 2013 Summary of Telephone Conference Call Held on August 19, 2013, Between the NRC and Tennessee Valley Authority, Concerning RAI Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, LRA ML13255A3682013-09-0606 September 2013 Written Limited Appearance Statements 2024-04-01
[Table view] |
See also: IR 05000390/2010008
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
July 21, 2011
MEMORANDUM TO: Joel T. Munday, Director
Division of Reactor Safety
From: Binoy B. Desai, Chief
Engineering Branch 1 /RA/
Division of Reactor Safety
Subject: ELECTRONIC CLOSURE OF SEQUOYAH INSPECTION REPORT
05000327, 328/2010-008 AND WATTS BAR INSPECTION REPORT
05000390/2010-008
Watts Bar Inspection Report 2010-008 was opened for the inspection of an unresolved item
(URI 05000390/2010008-02, Worst Case 6900 VAC Bus Voltage in Design Calculations.)
During the time period of August - October, 2010, 22.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> of basic inspection was charged to
this inspection report. Prior to the final disposition of the unresolved item, a management
decision was made to issue the results of the inspection in the residents 4th quarter integrated
inspection report (05000390/2010-005) instead of inspection report 2010-008.
Sequoyah Inspection Report 2010-008 was opened for the inspection of an unresolved item
(URI 05000327, 328/2010007-01, Worst Case 6900 VAC Bus Voltage in Design Calculations.)
During the time period of August - October, 2010, 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> of basic inspection was charged to
this inspection report. Prior to the final disposition of the unresolved item, a management
decision was made to issue the results of the inspection in the residents 4th quarter integrated
inspection report (05000327, 328/2010-005) instead of inspection report 2010-008.
In order to close the IRs discussed above, the RPS system must have the ADAMS accession
number (ML number) for the IRs. (The system is designed to prevent closing an IR without this
number) Therefore, these IRs cannot be closed in RPS because the reports were not issued.
After consulting with DRMA, it was decided that by this memo, which can be placed into
ADAMS, the IRs can be closed. We would simply close the IRs using the ML number assigned
to this memo. This would provide both the information necessary to close the IRs and an
explanation that would be sufficient for future audit purposes.
CONTACT: David A. Jones Jr., RII/DRS
(404) 997-4631